Skip to the record
The only place to find full transcripts.

Original source · versioned page text

221633 Civil_Combined

of 8

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                                                                                                                                         GENERAL NOTES                                                                                   APPLICATION
                                                                                                                                                                                                                                         1. GENERALLY, GYPSUM IS MIXED INTO SLURRY WITH WATER AND THEN SPRAYED OVER THE PONDED
                                                                                                                                                                                                                                                                                                                                         STORMWATER
                                                                                                                                         1. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM                                                       WATER. ALTERNATE FLOCCULENTS SHOULD BE APPLIED PER MANUFACTURER GUIDELINES. IT IS            1. ALL PIPES LESS THAN OR EQUAL TO 225Ø ARE TO BE SOLVENT WELD-JOINTED SEWER GRADE uPVC CLASS
                                                                                                                                         2. ALL SERVICE AUTHORITIES SHALL BE NOTIFIED IN WRITING SEVEN DAYS PRIOR TO COMMENCEMENT OF        ESSENTIAL THAT THE FLOCCULATING AGENT IS SPREAD EVENLY OVER THE ENTIRE SURFACE FOR PROPER        SH, OR (MIN) CLASS 2 RUBBER-RING JOINTED RCP (UNO).
                                                                                                                                             WORKS.                                                                                         TREATMENT OF WATER UNLESS LOCAL EXPERIENCE OR OTHER CRITERIA SUGGEST DIFFERENTLY.            2. WHERE uPVC STORMWATER LINES PASS UNDER FLOOR SLABS SEWER GRADE RUBBER RING JOINTS ARE
                                                                                                                                         3. TBM'S TO BE RE-ESTABLISHED BY THE LICENSED SURVEYOR IF FOUND TO BE MISSING AT THE            2. STANDARD BASIN FLOCCULATION RATES FOR GYPSUM GENERALLY VARY BETWEEN 32 KILOGRAMS PER             TO BE USED.
                                                                                                                                             COMMENCEMENT OF CONSTRUCTION THE CONTRACTOR WILL BE RESPONSIBLE FOR CARE AND                   100 CUBIC METRES TO 70 KILOGRAMS PER 100 CUBIC METRES IN AREAS WHERE REPEATED HIGH           3. PIPES GREATER THAN OR EQUAL TO 300Ø ARE TO BE (MIN) CLASS 2 RUBBER-RING JOINTED RCP (UNO).
                                                                                                                                             MAINTENANCE OF TBM'S THEREAFTER.                                                               INTENSITY STORMS ARE LIKELY. THE APPLICATION RATE MUST BE CALIBRATED.                        4. FRC PIPES EQUIVALENT TO THE STEEL REINFORCED CONCRETE PIPE CLASS SPECIFIED ON THE DRAWINGS
                                                                                                                                         4. ALL EXISTING SURFACE LEVELS SHOWN ON THE ENGINEERING DRAWINGS HAVE BEEN RECREATED FROM       3. SETTLEMENT TIME - NORMALLY, SUFFICIENT SEDIMENT WILL HAVE FLOCCULATED AND SETTLES WITHIN         MAY BE USED - OBTAIN SUPERINTENDENTS APPROVAL.
                                                                                                                                             2D SURVEY AND LIDAR TERRAIN MODEL THESE LEVELS HAVE BEEN USED AS THE BASIS FOR ALL             ABOUT 24 TO 48 HOURS IN THE CASE OF GYPSUM. HOWEVER, RESULTS MAY BE EVIDENT SOONER           5. ALL PIPES ARE TO BE LAID AT (MIN) 1.0% GRADE (UNO)
                                                                                                                                             ENGINEERING DESIGN AND DETERMINATION OF QUANTITIES. CONTRACTOR TO ENSURE WORKS FOLLOW          DEPENDING ON THE FLOCCULENT AGENT.                                                           6. THE USE OF PRE-CAST STORMWATER DRAINAGE PITS IS NOT ACCEPTED WITHOUT CONFIRMATION
                                                                                                                                             DESIGN INTENT. CONTRACTOR TO ADVISE SUPERINTENDENT OF MAJOR DISCREPANCIES.                                                                                                                      BETWEEN EDGE CONSULTING ENGINEERS AND THE CONTRACTOR REGARDING QUALITY CONTROL, AND
                                                                                                                                         5. THE CONTRACTOR IS RESPONSIBLE FOR GAINING APPROVAL OF THE TRAFFIC MANAGEMENT PLAN FROM       WATER QUALITY & TESTING                                                                             CERTIFICATION OF FINISHES.
                                                                                                                                             COUNCIL AT LEAST 7 DAYS PRIOR TO WORKS COMMENCING OR EARLIER IF REQUIRED. THE TRAFFIC       1. A SUSPENDED SOLID CONTENT OF LESS THAN 50 MILLIGRAMS PER LITRE IS REQUIRED.                  7. COVERS
                                                                                                                                             MANAGEMENT PLAN AND TRAFFIC CONTROL PLAN INCLUDING ANY ACCESS REQUIREMENTS SHALL BE         2. TURBIDITY (NTU) VALUE LESS THAN OR EQUAL TO 8 NTU PER THE ACID SULFATE SOILS MANAGEMENT            A. USE HOT DIPPED GALVANISED COVERS AND GRATES COMPLYING WITH RELEVANT AUSTRALIAN AND
                                                                                                                                             APPROVED BY THE COORDINATING ROAD AUTHORITY APPROPRIATE TO THE PROJECT.                        PLAN.                                                                                                 COUNCIL STANDARDS.
                                                                                                                                         6. THE CONTRACTOR IS REQUIRED TO CONFINE CONSTRUCTION VEHICLES TO THE INTERNAL ROAD RESERVE     3. PH VALUE MUST BE IN THE RANGE 7.0 TO 8.4 PER THE ACID SULFATE SOILS MANAGEMENT PLAN.               B. ALL COVERS AND GRATES TO BE POSITIONED IN A FRAME AND MANUFACTURE AS A UNIT
                                                                                                                                             AND CARPARK. ANY DAMAGE CAUSED TO EXISTING KERB & CHANNEL OR FOOTPATHS MUST BE MADE         4. UPON THE FIRST DISCHARGES, OBTAIN SAMPLES AND TEST SAMPLES IN A LABORATORY TO ENSURE THAT          C. ALL COVERS AND GRATES TO BE FITTED WITH POSITIVE COVER LIFTING KEYS.
                                                                                                                                             GOOD.                                                                                          THE SUSPENDED SOLID CONTENT, TURBIDITY, AND PH ARE WITHIN ACCEPTABLE LEVELS. REGULAR               D. OBTAIN SUPERINTENDENT'S APPROVAL FOR THE USE OF CAST IRON SOLID COVERS AND GRATES.
                                                                                                                                         7. INSTALL ALL VEGETATION PROTECTION, EROSION AND SEDIMENT CONTROL, AND SITE-SPECIFIC MEASURE      SAMPLING OF THE DISCHARGED WATER SHOULD BE COMPLETED TO VERIFY COMPLIANCE WITH TSS,                   CAST IRON SOLID COVERS (IF APPROVED) TO CONSIST OF CROSS-WEBBED, CELLULAR
                                                                                                                                             PRIOR TO COMMENCEMENT OF ANY WORK.                                                             TURBIDITY AND PH DISCHARGE REQUIREMENTS.                                                              CONSTRUCTION WITH THE RIBS UPPERMOST TO ALLOW INFILLING WITH CONCRETE. INSTALL
                                                                                                                                         8. ANY BUILDINGS, TROUGHS, FENCES AND OTHER STRUCTURES ON SITE ARE TO BE REMOVED AS DIRECTED    5. WATER QUALITY RESULTS ARE TO BE RECORDED WITHIN A WATER QUALITY TESTING REGISTER.                     POSITIVE COVER LIFTING KEYS AND PLASTIC PLUGS.
                                                                                                                                             BY THE ENGINEER THE COST OF REMOVAL IS TO BE INCLUDED IN THE OVERALL EARTHWORKS FIGURE                                                                                                            E. UNLESS DETAILED OR SPECIFIED OTHERWISE COVERS AND GRATES TO BE CLASS "C" IN VEHICULAR
                                                                                                                                             UNLESS A SPECIFIC ITEM FOR REMOVAL IS DENOTED IN THE SCHEDULE                               WATER DISCHARGE                                                                                          PAVEMENTS AND CLASS "B" ELSEWHERE.
                                                                                                                                         9. THE CONTRACTOR SHALL VERIFY THE LOCATION OF EXISTING SERVICES PRIOR TO THE COMMENCEMENT      1. DISCHARGE SHOULD BE ACHIEVED WITH A SYSTEM THAT PERMITS DRAINAGE OF THE BASIN IN LESS THAN   8. ALL PIPE BENDS, JUNCTIONS, ETC. ARE TO BE PROVIDED USING PURPOSE MADE FITTINGS OR
                                                                                                                                             OF WORK ALL EXISTING SERVICES AND STRUCTURES ARE TO BE MAINTAINED IN GOOD ORDER FOR THE        24 HOURS.                                                                                        STORMWATER PITS.
                                                                                                                                             DURATION OF THE CONTRACT ANY COSTS ASSOCIATED WITH REPAIRING DAMAGE TO EXISTING SERVICES    2. THE OUTFLOW MUST NOT CAUSE EROSION OR ADVERSELY AFFECT DOWNSTREAM ENVIRONMENTS.              9. ALL CONNECTIONS TO EXISTING DRAINAGE PITS SHALL BE MADE IN A TRADESMAN-LIKE MANNER AND THE
                                                                                                                                             SHALL BE BORNE BY THE CONTRACTOR                                                            3. A MARKER PEG SHOULD BE INSTALLED IN THE BASIN TO CLEARLY IDENTIFY THE MAXIMUM SEDIMENT           INTERNAL WALL OF THE PIT AT PIPE PENETRATIONS SHALL BE CEMENT RENDERED TO ENSURE A SMOOTH
                                                                                                                                         10. THE SITE OF THE PROPOSED WORKS SHALL BE CLEARED OF ALL UNDESIRABLE MATTER THIS SHALL           STORAGE LEVEL.                                                                                   FINISH.
                                                                                                                                             INCLUDE DEAD TIMBER, BOULDERS, GRASS, OLD FOUNDATIONS, CONCRETE, REDUNDANT BUILDING         4. SEDIMENT EXTRACTED FROM THE BASIN SHALL BE SUITABLY DISPOSED OF IN SEDIMENT DUMPS, OR        10. THE CONTRACTOR SHALL SUPPLY AND INSTALL ALL FITTINGS AND SPECIALS INCLUDING VARIOUS PIPE
                                                                                                                                             MATERIALS, GARBAGE, DEBRIS AND OTHER OBSTRUCTIONS HOLES LEFT BY THE REMOVAL OF MATERIAL        MIXED WITH ON-SITE SOILS IN A MANNER THAT WILL NOT RESULT IN UNNECESSARY SOIL EROSION OR         ADAPTERS TO ENSURE PROPER CONNECTION BETWEEN DISSIMILAR PIPEWORK.
                                                                                                                                             SHALL BE FILLED WITH APPROVED COMPACTED MATERIAL                                               SEDIMENT RUNOFF FROM THE SITE. OTHERWISE, THE SEDIMENT SHALL BE DRIED AND REMOVED FROM       11. U.N.O. MATERIAL USED FOR BEDDING OF PIPES SHALL BE APPROVED NON-COHESIVE GRANULAR MATERIAL
                                                                                                                                         11. CLEARED MATERIAL AND EARTHWORKS SPOIL SHALL BE REMOVED FROM SITE NO FILL OR STOCKPILING        THE SITE.                                                                                        HAVING HIGH PERMEABILITY AND HIGH STABILITY WHEN SATURATED AND FREE OF ORGANIC AND CLAY
                                                                                                                                             OF MATERIAL IS TO BE PLACED ON ANY RESERVE OR COMMON PROPERTY UNLESS OTHERWISE DIRECTED                                                                                                         MATERIAL.
                                                                                                                                             BY THE SITE ENGINEER OR SUPERINTENDENT.                                                     SEQUENCE OF WORKS                                                                               12. WHERE TRENCHES ARE IN ROCK, THE PIPE SHALL BE BEDDED ON A MIN. 50mm CONCRETE BED (OR 75mm
                                                                                                                                         12. TOPSOIL SHALL BE STRIPPED AND STOCKPILED PRIOR TO THE COMMENCEMENT OF ANY EARTHWORKS                                                                                                            THICK BED OF 12mm BLUE METAL) UNDER THE BARREL OF THE PIPE. THE PIPE COLLAR AT NO POINT SHALL
                                                                                                                                             OPERATION. TOPSOIL IS TO BE RESPREAD TO LANDSCAPE AREAS AFTER CIVIL WORKS ARE COMPLETE      1. PRIOR TO COMMENCEMENT OF EXCAVATION THE FOLLOWING SOIL MANAGEMENT DEVICES MUST BE                BEAR ON THE ROCK.
                                                                                                                                             SURPLUS TOPSOIL TO BE REMOVED FROM SITE                                                        INSTALLED.                                                                                   13. BEDDING SHALL BE (UNO) TYPE HS2 UNDER ROADS; H2 GENERAL AREAS, IN ACCORDANCE WITH CURRENT
                                                                                                                                         13. ALL BATTERS SHALL BE 1 IN 4, UNLESS OTHERWISE SHOWN.                                             A. CONSTRUCT SILT FENCES BELOW THE SITE AND ACROSS ALL POTENTIAL RUNOFF SITES                  RELEVANT INDUSTRY STANDARDS AND GUIDELINES.
                                                                                                                                         14. THE LOCATION OF EXISTING SERVICES SHOWN ON THESE PLANS SHALL BE PROVEN ON SITE THE               B. CONSTRUCT TEMPORARY CONSTRUCTION ENTRY EXIT AND DIVERT RUNOFF TO SUITABLE CONTROL       14. THE WEATHER PROOFING OF THE BUILDING IS THE ARCHITECT'S /BUILDER'S RESPONSIBILITY. THIS
                                                                                                                                             APPROPRIATE AUTHORITY SHALL BE CONTACTED AND THE SERVICES LOCATED PRIOR TO                          SYSTEMS                                                                                     INCLUDES THE SPECIFICATION AND FIXING DETAILS OF CLADDINGS, SHEETING, FLASHING AND
                                                                                                                                             COMMENCEMENT OF CONSTRUCTION.                                                                    C. CONSTRUCT MEASURES TO DIVERT UPSTREAM FLOWS INTO EXISTING STORMWATER SYSTEM                 MEMBRANES.
                                                                                                                                         15. BULK EARTHWORKS LEVELS AT BUILDING PLATFORMS ARE BASED ON PRELIMINARY FOUNDATION                 D. CONSTRUCT SEDIMENTATION TRAPS BASIN INCLUDING OUTLET CONTROL AND OVERFLOW               15. THE CONTRACTOR SHALL ENSURE AND PROTECT THE INTEGRITY OF ALL STORMWATER PIPES DURING
                                                                                                                                             DESIGNS. LEVELS TO SUIT FINAL DESIGN SHOULD BE CONFIRMED PRIOR TO FINAL TRIM OF BUILDING                                                                                                        CONSTRUCTION. ANY AND ALL DAMAGE TO THESE PIPES AS A RESULT OF THESE WORKS SHALL BE
                                                                                                                                             PLATFORMS                                                                                   PROVIDE SANDBAG SEDIMENT TRAPS UPSTREAM OF EXISTING PITS.                                           REPAIRED BY THE CONTRACTOR UNDER THE DIRECTION OF THE SUPERINTENDENT, AND AT NO EXTRA
                                                                                                                                                                                                                                                                                                                                             COST.
                                                                                                                                                                                                                                                                                                                                         16. NOTE THAT THE PIT COVER LEVEL NOMINATED IN GUTTERS ARE TO THE INVERT OF THE GUTTER WHICH
                                                                                                                                             TREE PROTECTION NOTES                                                                       ROADWORKS:                                                                                          ARE 40mm LOWER THAN THE PAVEMENT LEVEL AT LIP OF GUTTER.
                                                                                                                                                                                                                                         1. ALL DIMENSIONS AND SETOUT ARE TO LIP OF KERB U.N.O.                                          17. ∅100mm SUB-SOIL DRAINAGE LINES WITH NON-WOVEN GEOTEXTILE SOCK SURROUND SHALL BE
                                                                                                                                         1. TREE PROTECTION MEASURES (TPZ FENCE & GROUND PROTECTION) ARE TO BE INSTALLED IN
                                                                                                                                                                                                                                         2. LEVELS ARE TO FACE OF KERB/LIP OF KERB/KERB AND CHANNEL U.N.O.                                   CONNECTED TO A STORMWATER DRAINAGE PIT (AT min. 1% LONGITUDINAL GRADE) AND PROVIDED IN THE
                                                                                                                                            ACCORDANCE WITH AS 4970-2009 PROTECTION OF TREES ON DEVELOPMENT SITES.
                                                                                                                                                                                                                                         3. PAVEMENT DEPTHS SHOWN ON THE DRAWINGS ARE NOMINAL ONLY AND SHALL BE DETERMINED AFTER             FOLLOWING LOCATIONS:
                                                                                                                                         2. WHERE TREES TO BE RETAINED HAVE A >10% ENCROACHMENT INTO THE TPZ, THE FOLLOWING CONDITION
                                                                                                                                                                                                                                             INSPECTION AND TESTING OF SUBGRADE. THE CONTRACTOR SHALL IN ALL CASES OBTAIN PARTICULARS          A. THE HIGH SIDE OF PROPOSED TRAFFICKED AND CARPARK PAVEMENT AREAS.
                                                                                                                                            APPLY:
                                                                                                                                                                                                                                             OF THE PAVEMENT THICKNESS BEFORE PROCEEDING WITH THE FORMATION OF THE ROAD BOX. CBR               B. ALL PLANTER AND TREE BEDS PROPOSED ADJACENT TO PAVEMENT AREAS.
                                                                                                                                         100mm DEPTH OF FOREST MULCH TO BE APPLIED TO TPZ
                                                                                                                                                                                                                                             TESTING SHALL BE UNDERTAKEN AT 25m INTERVALS ALONG THE PAVEMENT AND ANY ADDITIONAL                C. BEHIND RETAINING WALLS (IN ACCORDANCE WITH DRAWINGS).
                                                                                                                                                                                                                                             LOCATIONS DETERMINED BY THE GEOTECHNICAL ENGINEER/OR SUPERINTENDENT SUPERVISING THE               D. ALL OTHER AREAS SHOWN ON THE DRAWINGS.
                                                                                                                                         EARTHWORKS NOTES                                                                                    WORKS AND SHALL BE AT LEAST THE MINIMUM SPECIFIED IN THE PROJECT SPECIFICATION.
                                                                                                                                                                                                                                         4. MINIMUM PAVEMENT COMPACTION TO BE AS FOLLOWS;
                                                                                                                                                                                                                                                                                                                                         18. THE CONTRACTOR SHALL INSTALL INSPECTION OPENINGS TO ALL SUBSOIL DRAINAGE LINES AND
                                                                                                                                                                                                                                                                                                                                             DOWNPIPE LINES AS SPECIFIED ON DRAWINGS, AT MAXIMUM 60m CENTERS AND AT ALL UPSTREAM
                                                                                                                                         1. GENERAL EARTHWORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE                 A. SUBBASE AND BASE - 95% MODIFIED MAXIMUM DRY DENSITY TO AS1289.5.4.1                        ENDPOINTS.
                                                                                                                                            GEOTECHNICAL ENGINEER AND LOCAL REGIONAL COUNCIL.                                            5. SUB-SOIL DRAINAGE SHALL BE INSTALLED UNDER ALL NEW KERB AND CHANNEL AND ROAD EDGES AND       19. WHERE SUBSOIL DRAINAGE LINES PASS UNDER FLOOR SLABS AND VEHICULAR PAVEMENTS SEALED uPVC
                                                                                                                                         2. THE CONTRACTOR SHALL PREPARE THE SUBGRADE FOR PROOF ROLLING TO BE WITNESSED BY THE               GRADED TO CONNECT WITH DRAINAGE INLET PITS AT A MINIMUM OF 0.5%.                                SEWER GRADE PIPE SHALL BE USED.
                                                                                                                                            SUPERINTENDENT AND SITE ENGINEER. PROOF ROLLING SHALL BE CARRIED OUT BY FULLY LADEN WATER    6. EARTHWORKS SUBGRADE SHALL BE COMPACTED TO 98% R.D.D STANDARD COMPACTION                      20. PROVIDE 3.0m LENGTH OF ∅100 SUBSOIL DRAINAGE PIPE WRAPPED IN A NON-WOVEN GEOTEXTILE FABRIC,
                                                                                                                                            TRUCK OR SIMILAR CONSTRUCTION MACHINERY APPROVED BY THE SUPERINTENDENT.                      7. SUBSOIL DRAIN SHALL BE IN ACCORDANCE WITH IPWEAQ STD DRG RS-140 AND 142.                         TO THE UPSTREAM SIDE OF STORMWATER PITS, LAID IN STORMWATER PIPE TRENCHES AND CONNECTED
                                                                                                                                         3. FILLING SHALL BE COMPACTED IN LAYERS TO A DENSITY NOT LESS THAN 95% OF MAXIMUM DRY DENSITY   8. CONSTRUCTION OVER PIPES TO USE SUITABLE CONSTRUCTION/COMPACTION PLANT TO ENSURE MAXIMUM          TO THE DRAINAGE PIT.
                                                                                                                                            IN ACCORDANCE WITH AS 1289 5.1.1 (STANDARD COMPACTION). ROADWAY EARTHWORKS SHALL BE              STRUCTURAL CAPACITY OF PIPEWORK IS NOT EXCEEDED.                                            21. ALL RECTANGULAR HOLLOW SECTIONS (RHS) SPECIFIED AS STORMWATER CONDUITS TO BE HOT DIPPED
                                                                                                                                            CARRIED OUT IN ACCORDANCE WITH QUEENSLAND DEPARTMENT OF MAIN ROADS SPECIFICATION MRS04       9. ALL WORKS TO CONFORM TO LOCAL AUTHORITY STANDARDS U.N.O.                                         GALVANISED AND HAVE (MIN) 5mm WALL THICKNESS.
FILENAME: \\AD.EDGECE.COM\JOBS\220000\221633-NOOSA CHRISTIAN COLLEGE LRC ADMIN REFURB\EDWG\CIVIL\221633 C002 CONSTRUCTION NOTES.DWG




                                                                                                                                            GENERAL EARTHWORKS.                                                                          10. ALL IMPORTED AND EXPORTED MATERIALS ARE TO BE TRANSPORTED ONLY ON ROUTES APPROVED BY
                                                                                                                                         4. THE VOID BENEATH THE STIFFENED SLAB IS TO BE FILLED WITH NON-REACTIVE FILL MATERIAL WITH A       THE LOCAL AUTHORITY.
                                                                                                                                            MAXIMUM SHRINK-SWELL INDEX NO GREATER THAN 1% PER ∆pF.                                       11. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE SAFETY OF VEHICULAR AND
                                                                                                                                                                                                                                             PEDESTRIAN TRAFFIC DURING CONSTRUCTION.
                                                                                                                                                                                                                                         12. COMPACTION TEST RESULTS AND TEST LOCATIONS FOR SUBGRADE SHALL BE SUBMITTED TO AND
                                                                                                                                         EROSION AND SEDIMENT CONTROL NOTES                                                                  APPROVED BY THE ENGINEERS PRIOR TO PLACING PAVEMENT MATERIALS.
                                                                                                                                         1. ALL WORK SHALL BE GENERALLY CARRIED OUT IN ACCORDANCE WITH.                                  13. PROOF ROLL TESTS OF THE SUBGRADE ARE TO BE UNDERTAKEN TO IDENTIFY LOCALISED POOR GROUND
                                                                                                                                               A. LOCAL AUTHORITY REQUIREMENTS.                                                              TO BE REMOVED OR REWORKED PRIOR TO THE PLACING OF PAVEMENT MATERIAL.
                                                                                                                                               B. EPA - POLLUTION CONTROL MANUAL FOR URBAN STORMWATER.                                   14. ALL LAYERS OF PAVEMENT WORKS AND EARTHWORKS ARE TO BE PROOF ROLLED AND TESTED AS PER
                                                                                                                                               C. ICEA - BEST PRACTICE EROSION & SEDIMENT CONTROL.                                           THE SPECIFICATION, AND TO THE APPROVAL OF THE SUPERINTENDENT.
                                                                                                                                         2. EROSION AND SEDIMENT CONTROL DRAWINGS AND NOTES ARE PROVIDED FOR THE WHOLE OF THE            15. ALL CONSTRUCTION SHALL JOIN SMOOTHLY AND NEATLY TO EXISTING SURFACES AND STRUCTURES.
                                                                                                                                             WORKS SHOULD THE CONTRACTOR STAGES THESE WORKS THEN THE DESIGN MAY BE REQUIRED TO BE            TACTILE INDICATORS TO BE PROVIDED AT PRAM RAMPS WHERE THEY CONNECT WITH CONCRETE
                                                                                                                                             MODIFIED VARIATION TO THESE DETAILS MAY REQUIRE APPROVAL BY THE RELEVANT AUTHORITIES. THE       FOOTPATH.
                                                                                                                                             EROSION AND SEDIMENT CONTROL PLAN SHALL BE IMPLEMENTED AND ADOPTED TO MEET THE VARYING
                                                                                                                                             SITUATIONS AS WORK ON SITE PROGRESSES.
                                                                                                                                         3. MAINTAIN ALL EROSION AND SEDIMENT CONTROL DEVICES TO THE SATISFACTION OF THE
                                                                                                                                                                                                                                         SIGNAGE AND LINEMARKING
                                                                                                                                             SUPERINTENDENT AND THE LOCAL AUTHORITY.                                                     1. ALL WORKS TO BE IN ACCORDANCE WITH AS1742, AS2890 AND DTMR MANUAL OF UNIFORM TRAFFIC
                                                                                                                                         4. WHEN STORMWATER PITS ARE CONSTRUCTED PREVENT SITE RUNOFF ENTERING THE PITS UNLESS SILT          CONTROL DEVICES (MUTCD).
                                                                                                                                             FENCES ARE ERECTED AROUND PITS.                                                             2. ALL LINEMARKING AND SIGNAGE TO BE IN ACCORDANCE WITH LOCAL COUNCIL'S LINEMARKING AND
                                                                                                                                         5. MINIMISE THE AREA OF SITE BEING DISTURBED AT ANY ONE TIME.                                      TRAFFIC MANUALS.
                                                                                                                                         6. PROTECT ALL STOCKPILES OF MATERIALS FROM SCOUR AND EROSION DO NOT STOCKPILE LOOSE
                                                                                                                                             MATERIAL IN ROADWAYS, NEAR DRAINAGE PITS OR IN WATERCOURSES.
                                                                                                                                         7. ALL SOIL AND WATER CONTROL MEASURES ARE TO BE PUT BACK IN PLACE AT THE END OF EACH WORKING   CONCRETE
                                                                                                                                             DAY AND MODIFIED TO BEST SUIT SITE CONDITIONS.                                              ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH AS3600 UNLESS SHOWN OTHERWISE.
                                                                                                                                         8. CONTROL WATER FROM UPSTREAM OF THE SITE SUCH THAT IT DOES NOT ENTER THE DISTURBED SITE.
                                                                                                                                                                                                                                         2. CONCRETE SHALL HAVE A STRENGTH GRADE OF N32 UNLESS NOTED OTHERWISE.
                                                                                                                                         9. ALL CONSTRUCTION VEHICLES SHALL ENTER AND EXIT THE SITE VIA THE TEMPORARY CONSTRUCTION
                                                                                                                                                                                                                                         3. NOMINAL MAXIMUM AGGREGATE SIZE SHALL BE 20mm UNLESS NOTED OTHERWISE.
                                                                                                                                             ENTRY /EXIT.
                                                                                                                                                                                                                                         4. CONCRETE SLUMP SHALL BE NOMINAL 80mm UNLESS NOTED OTHERWISE.
                                                                                                                                         10. ALL VEHICLES LEAVING THE SITE SHALL BE CLEANED AND INSPECTED BEFORE LEAVING.
                                                                                                                                         11. CLEAN OUT ALL EROSION AND SEDIMENT CONTROL DEVICES AFTER EACH STORM EVENT. AFTER EACH
                                                                                                                                                                                                                                         5. ADMIXTURES SHALL NOT BE USED WITHOUT WRITTEN APPROVAL.                                                                                                                                                                                                                                            WARNING
                                                                                                                                                                                                                                         6. ALL CONCRETE SURFACES SHALL BE CURED BY APPROVED MEANS FOR A MINIMUM CONTINUOUS
                                                                                                                                             RUNOFF EVENT, INSPECT THE EROSION DAMAGE AT EARTH BUNDS AND SEDIMENT FENCES IF DAMAGE                                                                                                                                                                                                                                                                                                            THE CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL EXISTING
                                                                                                                                                                                                                                            DURATION OF 7 DAYS COMMENCING IMMEDIATELY AFTER THE INITIAL SET OF THE CONCRETE.
                                                                                                                                             HAS OCCURRED MAKE THE NECESSARY REPAIRS.                                                                                                                                                                                                                                                                                                                                                         SERVICES ON AND EXTERIOR TO THE SITE INCLUDING WATER MAINS,
                                                                                                                                                                                                                                         7. CONCRETE COVER TO REINFORCEMENT INCLUDING FITMENTS SHALL BE 50mm UNLESS NOTED
                                                                                                                                         13. CHECK ALL EMBANKMENTS FOR EXCESSIVE SETTLEMENT, SLUMPING OF THE SLOPES; MAKE ALL                                                                                                                                                                                                                                                                                                                 SEWER MAINS, GAS MAINS, TELECOMMUNICATIONS CABLES, ELECTRICAL
                                                                                                                                                                                                                                            OTHERWISE.
                                                                                                                                             NECESSARY REPAIRS.                                                                                                                                                                                                                                                                                                                                                                               CABLES, AND STORMWATER PIPES. ANY DAMAGE TO EXISTING SERVICES
                                                                                                                                                                                                                                         8. CONCRETE FACES AT CONSTRUCTION JOINTS SHALL BE THOROUGHLY SCABBLED, FREE OF LAITANCE,
                                                                                                                                         14. SEDIMENT FLOCCULATION IS REQUIRED PRIOR TO DISCHARGE OF ACCUMULATED RUNOFF ON SEDIMENT                                                                                                                                                                                                                                                                                                           SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE.
                                                                                                                                                                                                                                            CLEANED AND WETTED THOROUGHLY PRIOR TO THE PLACEMENT OF ABUTTING CONCRETE.
                                                                                                                                             BASINS.
PLOT DATE: 30.01.2023




                                                                                                                                                                                                                                         9. CONSTRUCTION JOINTS WHERE NOT SHOWN ON THE DRAWINGS SHALL BE LOCATED TO THE APPROVAL OF
                                                                                                                                                                                                                                            THE SUPERINTENDENT.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Project Name                                    Drawing Title
                                                                                                                                                                                                                                                                                                                                                                                                                                                               Brisbane . Australia
                                                                                                                                                                                                                                                                                                        RPEQ NAME:     ERIN HOGAN                                                                                                                              1st Floor, 28 Balaclava Street.
                                                                                                                                                                                                                                                                                                                                                                                                                                                               Woolloongabba,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     NOOSA CHRISTIAN COLLEGE                         CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                                                                                               Queensland, 4102,
                                                                                                                                                                                                                                                                                                        RPEQ No:    21411                                                                                                                                      Australia
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     20 COOROY BELLI CREEK ROAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     COOROY QLD 4563
                                                                                                                                                                                                                                                                                                                                                                                                                                                               T: +61 7 3392 3671
                                                                                                                                                                                                                                                                                                        DATE:   30.01.23                                                                           www.edgece.com                                              E: [email protected]                                Client                                          Project No.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     PAYNTERS                                        221633                   FOR APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                                   The concepts + information contained in this document are the copyright of EDGE Consulting Engineers.
                                                                                                                                                                                                                                                                                                        SIGN:                              P1 30.01.23 FOR APPROVAL                    ST    KO
                                                                                                                                                                                                                                                                                                                                                                                                   Use or copying of this document in whole or in part without the written permission of EDGE Consulting Engineers
                                                                                                                                                                                                                                                                                                                                                                                                   constitutes an infringement of copyright.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     Designed       Drawn   Checked     Scale @ A1   Drawing No.                         Revision
                                                                                                                                      0 mm    10   20   30   40   50
                                                                                                                                                                                                                                                                                                                                           Rev   Date                 Description       By   Chk   DO NOT SCALE DRAWINGS. IF IN DOUBT, ASK!                                                                          ST             ST      KO          NTS          C002                                P1
Log in to download the original file

221633 Civil_Combined.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.