Appendix C - Amended Engineering Plans
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn7 Impacts on Local Infrastructure and Likely Upgrades
The proposed Multiple Housing – Type 3 Retirement and Special Needs development will result in additional
loads on the available surrounding infrastructure with additional infrastructure required to service the subject
site.
Discussions with the relevant authorities will be required during the subsequent phases of the project to
ensure that there is sufficient capacity available within all existing systems to accept the additional demands
from the proposed development.
The potential impacts on the local infrastructure and likely upgrades are summarised in Table 7.1 below.
Table 7.1: Local Infrastructure Impacts and Required Upgrades
Infrastructure Infrastructure
Impacts Proposed Connections and Upgrades Required
Component Provider
Water Reticulation Unitywater Additional water demand Connect the proposed development to the
due to development existing water reticulation network located to the
south of west of Stage 6 of the Palm Lake Resort,
Cooroy.
Sewerage Reticulation Unitywater Additional sewer loadings Connect the proposed development to the
due to development existing sewer reticulation network located to the
south of west of Stage 6 of the Palm Lake Resort,
Cooroy.
Stormwater Noosa Council Increase in stormwater Development to attenuate and treat stormwater
runoff as a result of the runoff, as required, ensuring no increase in runoff
proposed development or pollutants during the post development
scenario prior to discharge to Lawful Point of
Discharge.
Electrical Energex New connections Connect the proposed development site to the
required existing Energex services available within the
adjacent road reserves.
Telecommunications Telstra New connections Connect the proposed development site to the
required existing Telstra services available within the
adjacent road reserves.
Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report Page 14 of 21
File Location: 180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.