Appendix C - Amended Engineering Plans

Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
1 Introduction

Pinnacle Engineering Group (Pinnacle) was engaged by Palm Lake Works Pty Ltd to undertake the
preliminary engineering investigations to provide supporting documentation for the development approval for a
Multiple Housing – Type 3 Retirement and Special Needs (10 units) retirement living development located at
20 Trading Post Road, Cooroy QLD, within the local authority of the Noosa Council (NC).


1.1        Scope
This report covers the following civil engineering elements associated with the proposed development
including:

             Stormwater Drainage;

             Water Supply;

             Sewerage Reticulation;

             Bulk Earthworks; and

             Electrical and Telecommunications.


1.2        Site Description

      1.2.1     Site Location

Street Address        -         20 Trading Post Road, Cooroy QLD

RP Description        -         Lot 101 on SP287641

Total Site Area       -         0.5791 Hectares

Current Zoning        -         Rural

Proposed Use          -         Resort Living Residential

Local Authority       -         NC

Refer to Figure 1.1 for the site location.

      1.2.2     Site Features and Topography

The subject site is currently occupied by an existing residence and auxiliary structures located within the
eastern portion of the site. A dam is located within the western portion of the subject site with medium density
vegetation being located throughout the site. All structures and vegetation will be removed from site as part of
the proposed development works.

An existing easement is located along the eastern boundary of the subject site.

The highest elevation of the subject site of approximately RL102.79m AHD is reached at the western
boundary of the subject site with the lowest elevation of approximately RL97.20m AHD reached at the
northeast corner of the subject site.

An existing features and topography layout of the subject site is included within Appendix B. Refer to Figure
1.2 for the existing aerial view of the site.




Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report                                    Page 6 of 21
File Location: 180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx
Log in to download the original file

Appendix C - Amended Engineering Plans.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.