Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Application for Op Works - 223 Cooroy Belli Creek Rd

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

(J On airport land under the Airport Assets (Restructuring and Disposal) Act 2008

Name of airport:

(1 Listed on the Environmental Management Register (EMR) under the Environmental Protection Act 1994
EMR site identification: |

] Listed on the Contaminated Land Register (CLR) under the Environmental Protection Act 1994

CLR site identification: |

 

 

 

 

 

 

 

   
 

  

5) Are there any existing easements over the premises?
Note: Easement uses vary throughout Queensland and are to be identified correctly and accurately. For further information on easements and
how they may affect the proposed development, see DA Forms Guide.

x Yes — All easement locations, types and dimensions are included in plans submitted with this development
application
CINo

  

  
      

PART 3 — DEVELOPMENT DETAILS

Section 1 — Aspects of development
6.1) Provide details about the first development aspect
a) What is the type of development? (tick only one box)

 

 

 

 

 

 

 

CJ Material change of use [[] Reconfiguring a lot [XM Operational work (1 Building work

b) What is the approval type? (tick only one box)

& Development permit (1 Preliminary approval (] Preliminary approval that includes a variation approval

c) What is the level of assessment?

[X] Code assessment LJ Impact assessment (requires public notification)

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots):

 

EARTHWORKS TO CuT EXISTING GATTER BACK FURTHER

e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms quide:
Relevant plans.

Relevant plans of the proposed development are attached to the development application
6.2) Provide details about the second development aspect
a) What is the type of development? (tick only one box)

 

 

 

 

 

 

 

 

CJ Material change of use [[] Reconfiguring a lot C1 Operational work (1 Building work

b) What is the approval type? (tick only one box)

C] Development permit (J Preliminary approval (] Preliminary approval that includes a variation approval
c) What is the level of assessment?

(J Code assessment Oo Impact assessment (requires public notification)

 

d) Provide a brief description of the proposal (e.g. 6 unit apartment building defined as multi-unit dwelling, reconfiguration of 1 lot into 3
lots):

 

 

e) Relevant plans
Note: Relevant plans are required to be submitted for all aspects of this development application. For further information, see DA Forms Guide:

Relevant plans.
C1 Relevant plans of the proposed development are attached to the development application

 

 

 

 

Rah:
ey Queensland
eel’ Government

      
Log in to download the original file

Application for Op Works - 223 Cooroy Belli Creek Rd.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.