Skip to the record
Accept no imitations.

Original source · versioned page text

Application for Op Works - 223 Cooroy Belli Creek Rd

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

10) Subdivision

10.1) For this development, how many lots are being created and what is the intended use of those lots:

 

Intended use of lots created Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

Number of lots created

 

10.2) Will the subdivision be staged?
C1 Yes — provide additional details below

[1 No
How many stages will the works include?

What stage(s) will this development application
apply to?

 

 

 

 

 

 

 

11) Dividing land into parts by agreement — how many parts are being created and what is the intended use of the

erctaceg

 

Intended use of parts created Residential Commercial Industrial Other, please specify:

 

 

 

 

 

 

Number of parts created

 

12) Boundary realignment

12.1) What are the current and proposed areas for each lot comprising the premises?

 

Current lot Proposed lot
Lot on plan description Area (m?) Lot on plan description Area (m?)

 

 

 

 

 

 

 

 

12.2) What is the reason for the boundary realignment?

 

 

13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?

edule if there are more than two easements)

 

Existing or Width (m) | Length (m) | Purpose of the easement? (e.g. Identify the land/lot(s)
proposed? pedestrian access) benefitted by the easement

 

 

 

 

 

 

 

 

 

Division 3 — Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
14.1) What is the nature of the operational work?

CJ Road work C1 Stormwater C1 Water infrastructure
(1 Drainage work [X] Earthworks CO Sewage infrastructure
(Landscaping C1 Signage (1 Clearing vegetation
(J Other — please specify:
14.2) ls the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
C1 Yes - specify number of new lots:

 
     

  
          
   

  
   
   

   
   

 
    
 
 
  

2 Queensland
“eer? Government

—
Log in to download the original file

Application for Op Works - 223 Cooroy Belli Creek Rd.pdf · 5.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.