Council archive · source document
Infrastructure deed of construction of Access, Track, Maintenance of Veg STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0118
Document Set ID: 22512401 Version: 1, Version Date: 21/07/2023 [OCR of page images] THIS DEED is made on the date stated in item 1 BETWEEN The Council AND the Owner RECITALS A The owner has obtained various approvals (216575 DA / 132001.210127.3) in order to construct and operate an aged care facility on the Subject Site, B The owner has also obtained approvals (RM2022/09056 dated 7 June 2022 and RM2020/53583 dated 7 October 2020) and carried out initial works for the clearing of vegetation for a buffer zone for fire mitigation and access track upgrades on the Council Land. c The owner has agreed to undertake the following on the Council Land for the period that the aged care facility is being operated on the Subject Site and on the terms set out in this deed: (i) (il) (ill) (iv) Document Set ID: 22512401 Version: 1, Version Date: 21/07/2023 construct the access track and causeway crossings / stormwater discharge points upgrades on the Council Land generally in accordance with drawings General Arrangement Plan STP220347 C102 A dated Jan 2023, Stormwater Layout STP22-0347 SKO1 dated 21.03.23, Earthworks / Track Layout STP22-0347 SKO3 dated 23.03.23, Causeway Crossing 1 STP22-0347 SKOS dated 03.05.23, and Causeway Crossing 2 STP22-0347 SKO6 dated 03.05.23, prepared by STP Consultants; maintain the access track and causeway crossings / stormwater discharge paints on the Council Land a minimum of: (A) Fire trail (including the track, causeway crossings and stormwater discharge): every 3 months (B) Fuel Reduction Zone (FRZ): every 3 years (C) Slashing/mowing: every 3 months maintain the vegetation buffer zone along the north-eastern and south- eastern boundary of the Subject Site on the Council Land, refer to RM2022/09056 dated 7 June 2022 and see also RM2020/53583 dated 7 October 2020: (A) north-eastern boundary: maximum total width of 20m comprising 15m as a fire access trail / fuel free zone width and 5m fuel reduction zone width; (B) south-eastern boundary: maximum total width of 15m comprising a 15m fuel free zone width. obtain the necessary owners’ consent and subsequent approvals (e.g. Operational Works) prior to accessing and undertaking works on the Council Land. 3 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Infrastructure deed of construction of Access, Track, Maintenance of Veg STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.