Council archive · source document
Unit 1 27 Duke St Sunshine Beach Change DA Report Rev A · 132004.4552.02
Attached to the e-mail Lodgement of Development Application - 132004.4552.02.
NOOSA COUNCIL IDAS Development Application Decision Notice 5
Frontage Works
21. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Duke Street
frontage of the site in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass
shall be couch, free of weeds.
22. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel and
landscaping such as trees and grasses in accordance with Council’s Standard specifications prior to
commencement of the use permitted by this permit.
Pathway Contributions
23. A pathway contribution of $247 towards external major pathways, in accordance with Planning Scheme
Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the Consumer
Price Index, All Groups Brisbane from September 2004 until the date of payment.
Stormwater Drainage
24. All stormwater drainage collected on the proposed buildings and landscaped areas shall be collected on
site and discharged to Council’s street drainage system in Duke Street. Plans of the drainage design shall
be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowable to Council’s street drainage system at any one
location is 25 litres/second.
25. All stormwater drainage collected on the proposed driveways shall be disposed of on site. To this end, a
detailed design and maintenance plan for the on site disposal system shall be submitted to the Council for
approval prior to obtaining a Development Permit for Operational Works.
A Development Permit for Building Works shall not be granted until a Development Permit for Operational
Works has been issued in regard to the drainage scheme.
26. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
27. The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
28. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
29. Each water connection to the water reticulation system shall extend to the property boundary and be
metered. Where multiple units including leased buildings are served by a single service, multiple water
meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
shall be paid to the Council.
Headworks
30. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on
Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the
rates applicable at the time of payment. An estimate only of the contribution rates as of September 2004
under the current policies is as follows:
Water Supply $4,269
Sewerage $2,915
TOTAL $7,184
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the contribution or trading bank guarantee will be returned.
SEP c:\users\noo.ecm.prod.web.svc\appdata\local\temp\fd3806e8-0058-435c-a2ab-46954e3601d5.tmp
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Unit 1 27 Duke St Sunshine Beach Change DA Report Rev A.pdfRelated documentApplication case desk ↗
About this file
- File size
- 522 KB (small file)
- File type
No other editions are linked here.