Original source · versioned page text
Sunshine Butterflies - Attachment D - 010816-2
Attached to the e-mail Development Application - Geotech report & Sunshine Butterflies flyer 2 of 2 MCU16/0090.
OUR BACKYARD
468 MCKINNON DRIVE, COOROIBAH
Table of Contents
1.0 INTRODUCTION .................................................................................................................................................1
2.0 PROPOSED DEVELOPMENT .............................................................................................................................1
3.0 METHOD OF INVESTIGATION............................................................................................................................1
3.1 Fieldwork ................................................................................................................................................1
3.2 Laboratory Testing ..................................................................................................................................2
4.0 THE SITE ............................................................................................................................................................2
5.0 SUBSURFACE INVESTIGATION FINDINGS .......................................................................................................5
5.1 Regional Geology....................................................................................................................................5
5.2 Subsurface Conditions ............................................................................................................................5
5.3 Laboratory Test Results ..........................................................................................................................5
6.0 ENGINEERING ASSESSMENT ...........................................................................................................................6
6.1 Earthworks..............................................................................................................................................6
6.1.1 Site Preparation and Trafficability .......................................................................................................6
6.1.2 Excavations.......................................................................................................................................6
6.1.3 Filling ................................................................................................................................................6
6.2 Building Foundations...............................................................................................................................7
6.2.1 Indicative Site Classification ...............................................................................................................7
6.2.2 Footing Design ..................................................................................................................................7
6.3 Retaining Structures................................................................................................................................8
6.4 Pavement Design....................................................................................................................................8
6.5 Permanent Drainage ...............................................................................................................................8
7.0 ON-SITE EFFLUENT DISPOSAL.........................................................................................................................9
7.1 Wastewater Flow Design Allowance ........................................................................................................9
7.2 Terrain-Soil Assessment..........................................................................................................................9
7.3 Recommendations ..................................................................................................................................9
7.3.1 Treatment & Land Application ............................................................................................................9
7.3.2 System Positioning ..........................................................................................................................10
7.3.3 System Construction........................................................................................................................11
7.3.4 Maintenance and Inspection.............................................................................................................11
8.0 LIMITATIONS....................................................................................................................................................11
4 May 2016
Report No. 16081-001-Rev0 ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.