Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Reference Documents

of 69

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (13.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

3.0 Bushfire Risk Mitigation Measures
The following section describes Bushfire Risk Mitigation measures, recommended to be
utilised at the subject site to reduce the risk of Bushfire impacting on people and property.
The scope of proposed Bushfire Risk Mitigation Measures have been drawn from the
following sources:
     ▪   the Queensland State Government Single State Planning Policy - Part E (SPP 2017);
     ▪   the Bushfire Resilient Communities Technical Reference Guide (QFES,2019);
     ▪   the Noosa Plan 2017, Division 9 – Natural Hazards Overlays Code; and
     ▪   the Australian Standard (AS 3959- 2018) - Construction of buildings in bushfire prone
         areas.
The intent of the above legislation is to protect people and premises in the event of a bushfire
emergency, through achieving acceptable Performance Outcomes for the development given
the identified bushfire hazard. Performance Outcomes are generally achieved by appropriate
separation of a development from bushfire hazard, appropriate access for fire-fighting
vehicles, and appropriate construction standards of buildings. Additional factors are detailed
where considered appropriate.

3.1 Asset Protection Zones
Asset protection zones (APZ’s) provide a defensive tool to assist in the reduction of potential
bushfire impact to people and property situated in bushfire prone areas. APZ’s are the most
strategically valuable defence against radiant heat and flame, and to a lesser extent, embers.
Whilst APZ’s should prevent buildings from being subjected to direct contact from flames, and
reduced levels of radiant heat in the event of a bushfire, building construction standards will
also be key to ensuring the performance of buildings subjected to ember attack. Bushfire
Attack Level for the proposed development is determined in Section 3.2.
Based on the above Bushfire Hazard Assessment, APZ’s may be required adjacent the
proposed development. These are detailed in the following section.

3.1.1 Performance Outcomes
APZ and setback distances have not been prescribed in the SPP 2017. The SPP refers to
‘provision of appropriate defendable space between dwellings and medium or above Bushfire
Hazard’. The Bushfire Resilient Communities Technical Reference Guide (QFES, 2019), refers
to determining APZ’s based on achieving a maximum 29kW/m2 radiant heat flux exposure.
This is achieved by using either the Method 2 Bushfire Attack Level Assessment as per the
AS3959,2018 for Construction of Buildings in Bushfire Prone Areas or Bushfire Asset Protection
Zone Width Calculator (QFES, 2019), which uses the calculations underpinned by the AS3959,
2018 calculation.
 19 June 2023              41 Tallowwood Place, Black Mountain - Bushfire Management Plan   Page 11
                                             www.wollemi-eco.com.au
Log in to download the original file

Reference Documents.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.