Topsoil
Topsoil
Colluvium/Landslide Debris
Residual Soil
XW Material/Phyllite
Fissured/Slickensided Surfaces
Text Figure 10: Subsurface conditions in test pits TP3 (LHS) and TP2 (RHS)
4.5 Geotechnical Laboratory Test Results
Laboratory testing on a sample recovered from test pit TP3 between 0.4 m and 0.7 m BGL, indicates that the
sample was a clayey silt of high liquid limit, tending to a high plasticity silty clay. It should be noted that, due
to the high silt and clay content of the soils, the materials are expected to be susceptible to strength loss,
particularly if they become wet.
4.6 Groundwater
No signs of groundwater seepage at the surface (‘springs’) were observed during our walk-over around the
proposed development area. Groundwater was not encountered in the test pits at the time of investigation;
however, increased moisture conditions (moist to wet soils) were encountered in the deep colluvium profile in
test pit TP2. The soils within the test pits across the proposed new building area were dry to moist.
Groundwater conditions are expected to be reflective of prevailing weather conditions and seepage may
develop, particularly at depth following periods of prolonged or heavy rainfall.
4.7 Surface Drainage
Natural surface drainage follows the ground surface gradients from the proposed development area and
broader site to the north, ultimately into a creek beyond the site boundaries. Generally, surface water is
expected to drain well from the site considering the positive gradients and low permeability of the clayey
soils; however, poorer drainage conditions are anticipated on level areas.
No signs of significant erosion were observed around the proposed development area at the time of the
assessment; however, rill erosion was observed around the existing residence in areas where concentrated
stormwater flows appear to develop.
4.8 Vegetation
The proposed new building area was primarily covered by grass. Areas around the existing residence
comprised landscaped gardens and maintained grass with scattered trees. Relatively dense bushland
occupied most of the western part of the site and traced the northern boundary. Some of the trees on
steeper slopes and within the drainage lines were noted to be tilting/leaning with ‘J’ shaped curves which
can be a sign of previous instability. Generally, the trees around the proposed new building area were
relatively straight, exhibiting no obvious signs which would indicate global slope instability.
22 May 2023
Report No. 23099-001-Rev0 8
Document Set ID: 22826802
Version: 1, Version Date: 23/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.