PROPOSED SUBDIVISION
41 TALLOWWOOD PLACE, BLACK MOUNTAIN
6.0 GEOTECHNICAL RECOMMENDATIONS
General recommendations to help maintain the stability of the site are given in the document Some
Guidelines for Hillside Construction, which is attached in Appendix C.
6.1 Site Layout and Geotechnical Constraints
A recommended building area is defined in Text Figure 13. No building, filling or effluent disposal areas shall
be undertaken outside of this area unless assessed and approved by a geotechnical RPEQ prior to
construction. The proposed driveway will need to be repositioned away from the exclusion zone. An
indicative new driveway alignment is also illustrated on Text Figure 13. The final lot boundaries should be
designed to ensure the exclusion zone is wholly within one allotment (i.e. not on a site boundary), to reduce
the consequence of potential future instability.
Recommended Low Risk Building Area Exclusion Zone
Not Assessed
Not Assessed
Indicative new driveway alignment
Text Figure 13: Construction exclusion zones and recommended building area, base map courtesy of NC
To achieve a Low Risk of instability, the following is recommended:
No structures, driveways, filling, or wastewater irrigation areas are to be constructed within the
exclusion zone shown in Text Figure 13, unless assessed and approved by a geotechnical RPEQ.
Proposed Operational and Building Works must be reviewed and approved by a geotechnical RPEQ
once detailed design drawings are available.
All retaining walls exceeding 1 m high and/or subject to surcharge loads must be engineer designed
and certified, which must include an assessment of global and internal stability.
Unretained fill heights shall be limited to no more than 1 m and shall be located on ground sloping at
less than 10°. All fill to be placed on ground sloping at 10° or steeper must be fully supported by an
engineer designed and certified retaining structure. Filling must not exceed 1.5 m high unless
assessed and approved by a geotechnical RPEQ.
Design and construction of footings shall be undertaken in accordance with Section 6.3.2.
Formal drainage should be constructed to ensure all stormwater is directed away from the proposed
structures and effluent disposal areas.
Although the remediated landslide is within the recommended exclusion zone, to prevent water ponding
around the area it is recommended that the existing track is removed, and the ground surface is graded such
that stormwater can freely drain into the drainage line downslope. Care must be taken to ensure that
grading works do not undermine the toe of the rock fill embankment and they should not extend beyond the
southern property boundary.
22 May 2023
Report No. 23099-001-Rev0 13
Document Set ID: 22826802
Version: 1, Version Date: 23/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.