INTEGRATEO PLANNING ACT 1997
Development within the limits of'a
port
For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.
Ifyou answered “YES" to 012, the application
biggers refer to.the Port Authorily-
Tha Port Authority is a concurrence agency i the
development i is~
© within 200m of a shipping channel oF an entry
and éxit shipping corridor for the port
© within 1000m of a swing basin, a comifiétcial
shipping wharf, a mooring, anchorage ‘oF Spoil
grounds; :
within 1000m of a planned port facitity
identified in,a fand use plan approved under
the Transport infrastructure Act 1994.
In at other Situation the Port Authority is an
advice agency.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?
KINO.
[2 YES - complete Pat M of Form 1, or Part P of Form 1 if the work is prescribed lida! work
Marinas
“For more information tefer to Guide 18. For
tnformation about whether a marina is prescribed
lidal work refer to Guide 24. The local
government is the assessment manager for all
Prescribed tidat work,
Ifyou answered "YES" to Q13, the application
triggers referral to Queenstand Fire and, R
Service as an advice agency.
Tidal works in strategic port land ‘idal
areas
For more information refer to Guide 18.
Untess you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for lhe application,
Heritage
For further information refer lo Guide 19.
if you answered “YES” to 015, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.
Declared catchment areas
For more information, Inctuding a list of the
declared catchment areas within Queensiand,
refer to Guide 13.
Unless you answeted “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW)
If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
telation to this matter.
13.
15.
16.
Does the application involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?
[Xj No
[CI YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
. Does the application involve tidal works within a strategic port land tidal area?0?
NO
[YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
{INO
(17 YES - complete Part C of Form 1
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
(i) _ reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares;
Li (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
(ii) none of the above
18 High water mark is defined in the Coastai Protection and Management Act 1995 and means the ordinary high water mask at spring tide.
19 Marina is defined In the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally SO metres seaward of high water mark adjacent to strategic part land.
Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0568 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.