Original source · versioned page text
2014-06-26 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 26 JUNE 2014
Waste Management
18. Refuse storage, removal and collection facilities must be provided in accordance with
the following:
(a) The provision of separate waste bins for general and recyclable waste must be
provided.
(b) The provision of hardstand impervious area for the permanent storage location
of separate waste bins for general and recyclable waste; and
(c) The provision of a purpose built enclosure to the bin store to provide visual and
aesthetic screening from streets and pedestrian pathways.
(d) The provision of a roofed wash-down area/s for the purpose of waste bin
cleaning for all general and recyclable waste bins and fitted with a hose-cock
and a drain connected to the sewer.
19. The development site must provide for the entry and exit of waste vehicles from the
site in a forward direction and the means, without difficulty to align the vehicle with
any waste container (includes waste compactor equipment) and enable waste
collection at any time scheduled for collection. The means to full-fill this requirement,
details must be provided as part of the application for Operational Works approval
and must include in particular:
(a) Demonstration that all waste vehicles entering the site can appropriately
manoeuvre on-site in accordance with the above and can readily align the
collection vehicle with the waste containers, stored within a temporary on-site
storage position to enable waste collection. *(Refer to Advisory Note)
LANDSCAPING
Landscaping Works
20. The development site must be landscaped generally in accordance with the
Landscape Master Plan No. LC-02 Issue D dated 26/5/14, except where amended by
these conditions. The works must be undertaken in accordance with an Operational
Works approval and The Noosa Plan Planning Scheme Policy 3 Landscaping Plants
and Guidelines and must include in particular:
Road frontages and covenant areas
(a) Landscaping treatments to all road frontages to provide screening of the
development.
(b) Restoration and replanting of all covenant areas and the northern road reserve
area adjacent to Eenie Creek Road to provide a visual buffer to the
development, including understorey, mid-story and canopy species in
accordance with a restoration plan submitted for operational works approval.
(i) vegetated screening of northern and eastern boundaries of the site
designed such that 75% of the bulk of the building, including roof form will
be screened within 5 years.
(c) vegetated screening of any electrical transformers, pumps bin storage areas or
ancillary mechanical plant equipment from the car park and road frontages.
Car park area
(d) Provision of 100 litre shade trees of local native species to every 6 car parks.
(e) Deleted.
(f) Provision of dense understorey planting to car park shade tree mulched beds.
Page 18 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.