Original source · versioned page text
2014-06-26 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 26 JUNE 2014
CIVIL ENGINEERING UNIT
Easements
28. Prior to the commencement of use, a 9 metre wide easement for access purposes
must be registered against the title of Lot 1 SP222982 in favour of Lot 2 SP222982
over the land area along the southern boundary of Lot 1 SP222982.
Site Access and Driveways
29. A sealed access driveway must be provided from Hofmann Drive and the Eenie
Creek Road service road to all parking and manoeuvring areas of the development.
The works must be undertaken in accordance with an Operational Works approval.
Parking
30. A minimum of 246 car parking and 4 motorcycle spaces must be provided and
marked within stage 1, 34 car parking and 2 motorcycle spaces must be provided and
marked within stage 2. The works must be undertaken in accordance with an
Operational Works approval.
31. Motorcycle parking is to be provided in a location close to the entrance of the
buildings.
32. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Service Vehicles
33. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
34. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
(a) a 2.5 metre wide footpath within the Hofmann Road verge extending from the
existing footpath adjacent to the roundabout at the entrance to the site to the
existing footpath adjacent to the next roundabout to the northeast.
(b) pedestrian pathways extending through the middle of the carpark generally in
accordance with the approved plans.
(c) adequate separation of all specific pedestrian routes from vehicle access and
manoeuvring areas, and clear demarcation by pavement marking, signposts or
changes in surface materials or levels.
(d) signage and lighting at strategic locations to direct people to building entries
and toilet facilities.
(e) pedestrian refuge areas at strategic locations within the carpark to ensure safe
and convenient congregating of pedestrians waiting to cross major access
driveways
(f) a total of 30 bicycle parking spaces for stage 1, and 10 bicycle parking spaces
for stage 2, which are to be located close to the entrance of the building.
(g) end of trip facilities involving 15 lockers, 2 showers and change rooms for stage
1, and 5 lockers, 1 shower and change rooms for stage 2.
Page 21 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.