Original source · versioned page text
2014-06-26 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 26 JUNE 2014
A.01.3 I First Floor (annotated), prepared by Hinton Steel 20-03-14
Frames
A.01.4 I Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 I Elevations, prepared by Hinton Steel Frames 20-03-14
Units 6 & 7
Perspectives - Units 6 & 7, prepared by Hinton N.D
Steel Frames
A.01.2 H Ground Floor, prepared by Hinton Steel Frames 20-03-14
A.01.3 H First Floor, prepared by Hinton Steel Frames 20-03-14
A.01.4 H Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 H Elevations, prepared by Hinton Steel Frames 20-03-14
Units 8 & 9
Perspectives - Units 8 & 9, prepared by Hinton N.D
Steel Frames
A.01.2 J Ground Floor, prepared by Hinton Steel Frames 20-03-14
A.01.3 J First Floor, prepared by Hinton Steel Frames 20-03-14
A.01.4 J Elevations, prepared by Hinton Steel Frames 20-03-14
A.01.5 J Elevations, prepared by Hinton Steel Frames 20-03-14
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface and 2 storeys.
4. Certification must be submitted to Council from a Licensed Surveyor which
certifies that the buildings do not exceed the maximum height requirement of
this Decision Notice.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to the issue of a Development Permit for Operational
Works The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to
call upon the bond or guaranteed sum to effect compliance with conditions.
Street Identification
6. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Page 9 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.