Council archive · source document
Operational Woks Application OPW18-0071, Plans 2 of 2 · OPW18/0071
Plans and drawings: the text below has words only, no drawings.
da 75° Area 28 m? ce Area TOTAL ROOF CATCHMENT ~ ae 2s AREA 225 m2 167 m? —— (6 DOWNPIPES REQUIRED @40sqm/DP) (5 dp’s} 8 DOWNPIPES PROVIDED dp dp dp (dp () ROOF CATCHMENT PLAN / 1: 100 ‘Controlled back gap with— (a)la permanent minimum 10 mm spacer installed between the gutter back and he fascia; and ‘b)ione spacer per bracket, with the spacer 5 not more than 50 mm wide: and 1 2 the back of the gutter installed a minimum of 10 mm below the top of the fascia. Top of fascia Spacer (GUTTER INDICATIVE ONLY} (> GUTTER DETAIL \ NTS ROOFWATER DRAINAGE GENERAL NOTES: ALL ROOFWATER DRAINAGE SYSTEMS MUST BE CONNECTED TO A STORMWATER DRAINAGE SYSTEM COMPLYING WITH BCA PART 3.1.2, DRAINAGE OR AS/NZS3500. THE ROOF DRAINAGE SYSTEM MUST BE PROVIDED WITH AN OVERFLOW TO PREVENT THE BACKFLOW OF WATER INTO THE BUILDING. THE AREA SPECIFIC RAINFALL INTENSITY MUST BE SELECTED FROM BCA TABLE 3.5.2.1 OR FROM AS/NZS3500. GUTTERS AND DOWNPIPES MUST BE SELECTED FROM BCA TABLE 3.5.2.2 OR FROM AS/NZS3500. EAVES GUTTERS MUST BE INSTALLED AT A FALL NOT LESS THAN 1 IN 500 WITH SUPPORT BRACKETS AT 1.2m MAXIMUM CENTRES. BOX GUTTERS MUST BE INSTALLED AT A FALL NOT LESS THAN 1 IN 100, IN ACCORDANCE WITH AS/NZS3500.3. THE WIDTH OF VALLEY GUTTERS SHALL BE IN ACCORDANCE WITH AS/NZS3500.3 AND BCA PART 3.5.2. REFER TO ROOF SHEETING MANUFACTURERS SPECIFICATIONS FOR LIMITATIONS ON SHEET OVERHANGS INTO VALLEY GUTTERS. THE MAXIMUM ROOF CATCHMENT AREA FOR VALLEY GUTTERS IS 20m2. VALLEY GUTTERS ON ROOFS PITCHED LESS THAN 12.5° MUST BE DESIGNED AS BOX GUTTERS. DOWNPIPES MUST SERVE NOT MORE THAN 12 METRES OF GUTTER LENGTH FOR EACH DOWNPIPE WHICH MUST BE LOCATED AS CLOSE AS POSSIBLE TO VALLEY GUTTERS. EAVES GUTTERS MUST BE PROVIDED WITH AN OVERFLOW SYSTEM WHERE DOWNPIPES ARE LOCATED MORE THAN 1.2 METRES FROM A VALLEY GUTTER. TABLE 3.5.2.1 RAINFALL DURATION INTENSITY 5 MINUTE DURATION RAINFALL INTENSITY NOOSA HEADS -20YEARS = 258mm/h -100YEARS 331mm/h TABLE 3.5.2.2 GUTTER & DOWNPIPE SELECTION FROM TABLE A & B 40sqm - A - MEDIUM RECTANGULAR GUTTER or D -125mm D GUTTER FROM TABLE C 90mm DIAMETER DOWNPIPE TABLE 3.5.2.3 OVERFLOW VOLUME FROM TABLE A 350mm/h —12.0m GUTTER [email protected] (L/s/m} = 18L/s FROM TABLE B 350mm/h- 40sqm = 3.9(L/s) USE CONTROLLED BACK GAP (SEE DETAIL) = 1.5 L/s/m x 12.0m = 18.0L/s bespeke building design Russell Willcox Principal Designes/Director THESE DRAWINGS AND DESIGN ARE issue | DATE ‘DRWN/CHKD COMMENTS PROJECT DATE COPYRIGHT AND WiLL NOT BE USED ~ DESIGN RECEIVED & ACCEPTED OR REPRODUCED BY ANY MEANS, TaN 2/2017] RW | RW | PRELIMINARY PLANS PROPOSED RESIDENCE ROOF CATCHMENT PLAN WHOLLY CRUISION FROME PRIOR A |11/01/2018) RW | RW | GENERAL AMENDMENTS CLIENT SALES PROJECT STATUS wi - BESPOKE BUILDING DESIGN 3 [31/01/2018| AB | RW | CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS DO NOT SCALE FROM THIS DRAWING C | 10/03/2018} RW | RW [RETAINING WALL ADDED. CLIENT LOCATION SCALE SHEET SIZE BCA CLASS ISSUE FE. VeRIFY ALL DIMENSIONS PRIOR TO MACINTOSH, Douglas LOT 37 ON SP254354 INDICATED, AS la c COMMENCEMENT OF ANY SITE WORKS DRAWING FILE NUMBER | PAGE AND REFER ANY DISCREPANCIES TO BREWERS ROAD BI71211 6 BESPOKE BUILDING DESIGN COORAN, QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Woks Application OPW18-0071, Plans 2 of 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.