Council archive · source document
20517 App A.pdf [As Published] · 132007.1259
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
-State- The application involves: (tick applicable box/es)
[XI (i) development on land contiguous? to a State controlled road and for -
(a) material change of use assessable against the planning scheme;
CO (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
LC (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}
associated with access to a State-controlled road; or
¢ for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LC (ii) development on land not contiguous to a State-controlled road and -
O(a) material change of use -
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
CO (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule; -
(©) operational work (not associated with a material change of use assessable against . )
planning scheme or reconfiguring a lot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
C1 fill) none of the above
8. The application involves: (tick applicable box/es)
KX (i) material change of use -
(a} assessable against the planning scheme;
(b}_ on a lot containing —
« acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
(ii) reconfiguring a lot-
' (a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for. .
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
iii) operational work -
{a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1 :
Li (iv) none of the above
14, The application involves:
(1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
Act) - complete Part | of Form 1
CO (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part! of Form 1
Xl
) none of the above
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
controlled road.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App A.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.