Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

20517 App A.pdf [As Published] · 132007.1259

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

. INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
oo 22. The application involves: (tick the applicable box/es)—

 

 

 

 

 

 

 

 

 

CL (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O (ii) reconfiguring a lot—

(1a) _ on land that is completely or partly within a public transport corridor, and the
total number of lots increases;

[J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

C1 (c) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1 @) _ fora residential purpose within the 25 ANEF contour for an airport;

C1 (e) _ fora residential purpose resulting in 100 or more allotments.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

O (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

Ca) _ iscompletely or partly within a public transport corridor or a future public
transport corridor;
C1 (b) _ will result in work that encroaches into an airport's operational airspace.

f the abo

_|23. The application involves: (tick the applicable box/es)—

C (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

CO (ii) reconfiguring a lot—

(J (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or
greater;

(1 (c) _ on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;

(1 @)__ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

C1 (e) _ on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

C1 () for a residential purpose resulting in 100 or more allotments.

CO (ii) operational work assessable against the planning scheme, but not associated with a .
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) )
above, involving extracting, excavating or filling greater than 50m3, on land that—

(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

[1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;

C1 (c) — abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.

XX (iv) none of the above.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

24, The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

_L (ii) reconfiguring a lot

1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.

EX (iv) none of the above.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

Page 8

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App A.pdf [As Published].pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.