IDASForm6-TreeRemoval-030413 · OPW13/0269
Attached to the e-mail Development Application for permit to damage vegetation - OPW13/0269.
IDAS form 6—Building or operational work assessable against a planning scheme (Sustainable Planning Act 2009 version 2.0 effective 17 December 2012) This form must be used for development applications for building work or operational work assessable against a planning scheme. You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this form. For all development applications, you must: e complete DAS form 1—Application details e complete any other forms relevant to your application e provide any mandatory supporting information identified on the forms as being required to accompany your application. Attach extra pages if there is insufficient space on this form. All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form must be used for building work or operational work relating to strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land use plan for the strategic port land, Brisbane core port land or airport land. This form can also be completed online using eDA at www.smarteda.qld.gov.au Mandatory requirements 1. What is the nature of the work that requires assessment against a planning scheme? (Tick applicable box/es.) LC Building work—complete Table A I Operational work—complete Table B Table A a) Whatis the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? b) Are there any current approvals associated with this application? (e.g. material change of use.) [] No [_] Yes— provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Table B a) b) c) What is the nature of the operational work made assessable in the planning scheme? (Tick applicable box/es.) [_] Road works [_] Stormwater [_] Water infrastructure [_] Drainage works [-] Earthworks [_] | Sewerage infrastructure CL Landscaping C] Signage mM Clearing vegetation under the planning scheme [_] Other—provide details Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.) wm No | Yes—specify the number of lots being created Are there any current approvals associated with this application? (E.g. material change of use.) My No L] Yes—provide details below List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy) 2. What is the dollar value of the proposed building work? (Inc GST, materials and labour.) | $ 3. What is the dollar value of the proposed operational work? (Inc GST, materials and $500.00 labour.) APPROX. 4. Confirm that the following mandatory supporting information accompanies this application Mandatory supporting information Confirmation of Method of lodgement lodgement All applications involving building work and/or operational work A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are [Vv] Confirmed recommended scales) which shows the following: the location and site area of the land to which the application relates (relevant land) the north point the boundaries of the relevant land the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, building envelopes and existing or proposed open space (note: numbering is required for all lots) any existing or proposed easements on the relevant land and their function any access limitation strips all existing and proposed roads and access points on the relevant land. A statement about how the proposed development addresses the local L] Confirmed government's planning schemes and any other planning documents relevant IDAS form 6—Building or operational work assessable against a planning scheme Version 2.0 17 December 2012
Page 3
to the application. Applications for building work (including extensions and assessable demolition) Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are recommended scales) which show the following: e the north point e the intended use of each area on the floor plan (for commercial, industrial or mixed use developments only) e the room layout (for residential development only) with all rooms clearly labelled e the existing and the proposed built form (for extensions only) e the gross floor area of each proposed floor area. E] Confirmed M Not applicable Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are recommended scales) which show plans of all building elevations and facades, clearly labelled to identify orientation (e.g. north elevation). | Confirmed [Y] Not applicable Plans showing the size, location, proposed site cover, proposed maximum number of storeys, and proposed maximum height above natural ground level of the proposed new building work. EE] Confirmed Not applicable Plans showing the extent of any assessable demolition. LE] Confirmed I Not applicable Applications for operational work involving earthworks (filling and excavating) drawings showing: e existing and proposed contours e areas to be cut and filled e the location and level of any permanent survey marks or reference stations used as datum for the works e the location of any proposed retaining walls on the relevant land and their height e the defined flood level (if applicable) e the defined fill level (if applicable). _] Confirmed [iV] Not applicable Applications for operational work involving roadworks Drawings showing: e existing and proposed contours e the centreline or construction line showing chainages, bearings, offsets if the construction line is not the centreline of the road and all intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) e kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parallel to centreline) e edge of pavement where kerb is not constructed e position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture e pavement markings including details on raised pavement markers e catchpit, manhole and pipeline locations e drainage details (if applicable) e cross road drainage culverts (if applicable) e concrete footpaths and cycle paths e location and details for access points, ramps and invert crossings [_] Confirmed M Not applicable IDAS form 6—Building or operational work assessable against a planning scheme Version 2.0 17 December 2012
Page 4
changes in surfacing material. Applications for operational work involving stormwater drainage Drawings showing: existing and proposed contours drainage locations, diameters and class of pipe, open drains and easements manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels. C] Confirmed irc} Not applicable Applications for operational work involving water reticulation Drawings showing: kerb lines or edge of pavement where kerb is not constructed location and levels of other utility services where affected by water reticulation works pipe diameter, type of pipe and pipe alignment water main alignments water supply pump station details (if applicable) minor reservoir details (if applicable) conduits location of valves and fire hydrants location of house connections (if applicable) location of bench marks and reference pegs. C Confirmed | Not applicable Applications for operational work involving sewerage reticulation Drawings showing: location of all existing and proposed services location of all existing and proposed sewer lines and manhole locations location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable). C Confirmed | Not applicable Applications for operational work involving street lighting Drawings showing: location of all light poles and service conduits location of all other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of lighting levels. CL Confirmed EC Not applicable Applications for operational work involving public utility services Drawings showing: any existing light poles and power poles any existing underground services details of proposed services alternation to existing services. | Confirmed LC] Not applicable IDAS form 6—Building or operational work assessable against a planning scheme Version 2.0 17 December 2012
Page 5
Applications for operational work involving landscaping works Drawings showing: e the location of proposed plant species e aplant schedule indicating common and botanical names, pot sizes and numbers of plants e planting bed preparation details including topsoil depth, subgrade preparation, mulch type and depth, type of turf, pebble, paving and garden edge the location and type of any existing trees to be retained construction details of planter boxes, retaining walls and fences the proposed maintenance period irrigation system details. | Confirmed | Not applicable Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use of information recorded in this form. OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning. This form and all other required application materials should be sent to your assessment manager and any referral agencies. 5 IDAS form 6—Building or operational work assessa sion 2.0 17 Decem ble against a planning sche ber neme 2012
Page 6
SP111721 VO REGISTERED Recorded Date 14/01/1999 11:46 Page 1 of S Not To Scale
eS ‘ =
Shoat] of
REFERENCE MARKS SURVEY PLAN 1 | 4
Ga 7. ORIGIN _| BEARING | DIST
1 ap ufucussag | 226030 | 10
? Pia zissr | sat
2 Pin 150%49 | 2495
3| apos sfucistso | 247056" | 10
5a | Bross Plug (E) 508°445" | 2638
4 GIP gona O/MCHE4BO | 257°45" +0
4 4 @® asieasior | Se30 ®
4 | Bross Plug ;
50} Screw inMAt 14574 COMMON ‘ans:
6 Ph S574 | 0959 PROPERTY @-
61 aPgone | 5/ucuseso | 2824040") 1035 8
6 Pa 79% =| sae
7 ap 4/McHs480 | 30330’ | 10
7 Pin gre39 | 1596
Za Pha 154elt 10
& ap sfucns4ao | 2nsexa'10” | +0
&0 Pin 7624" | 1916
9 \a.Bottle gone | 2/uciseso | 2154410" | 0-718 SHERI4
9) Scraw ih top qr | M35
conc wall
8 Pin 2a2ne | PISS
9 | OGLNoin | 6/S109372 |309°S3'55“| 13106 =
10 | cxNabinpost ies | 0667 S
[Nall in post
10 ap | spswesze | zrario- | ooee S TRAVERSES ETC
1 | QBottenew | 8/MCH3430| lBxr2r | 16 G UNE _| BEARING | DISTANCE
” on our | 2x07 BS Jo-3 | S9e0925" | 15295
12| GPO9 deep | 2/siog3z2 | 17671810" | 1003 oo ere, ew
12) Pog deen | 2sioasze | 32592710" | 61 Bee eee | eee
2 Pin 2 ; 8 fish
| BoltinN/t arse | 7798 43-27 | aees0'50" | 22859
13 | Screw in 21890240" | 3283
“4 Pin 237906! | 3377
oN lia} Screwin Mt 26440" | “1331
6 ap (7/McHs430 | 230300" | 10
—4 | Pin 200%? | 4-479
is | arrgene | wucuseao| reason | ‘10. 159
16 OP gone
| Screwhnl/t eri ee 1045 RAFSS
7 ap 15 /MCHEEEO | 327943" to
17 | Scraw in Cone leroy | 3988 PARK RES.
18 | Scrawin Cone gear | 5308 cpasciaa
19| . APgone | 4/ucHseso | 358°5510" | 2-0
9 Pin sas | 2245
19) Ram.Nat ia eevee =| 787
Conc path
20) Seraw in Kerb wesy | S4
211 Screw in Gone gor | 2898
22 | Screw h Cone eee | S653
23| Screw in Conc 25ey | 1985 is
24 | Screwin Cone 24aeiy | 5645 Y
26 | Scraw in Korb 258957 | 5405
28 | Scrow in Conc 200°S6" COIS SEE
291 Screw hh Gone 272058 | 2655 SHEET2
29| Screw in Gone 2593" | 2735
St | Screw ln Kerb ou's6’ | 8065
Je SEbottof ares 2555 |- COMMON
Tight pole ‘
33) NWbattor esour | 255 | — PROPERTY
light pote ‘
34 | Screw in Cone 645 | 2565 H
35) Screw in MH 234035" | 1385 :
35) Spike a Cone 536%" | 5-491
36 | Screw in U/ WEY | 2667 0
37) Screw in Cone ssur | 4:7 1
38 | Screw in Kerb 73°05 | 7975 ines 0
40 | Screw in Cone gorge | 2508 |]
\ | 41) Soruw in Gone soe | 265 wf
42| Screw h Conc s508'50" | 254 y
—f |43| ‘Screw in Korb wes | 38s (Y
44 | Screw in MAL Zig | 228!
4 Pin 42058 | 5091
5 Ph 1567
6 Ph 46°09 | 0-78
52 Screw in M/H 290932 | 096
Peg placed at all new corners Area _of Common Property
Is 9727 m2
PERMANENT MARKS
Pit GRIGIN | GEARING | IST | NO
2-0PM _ Ta/ucH2707 | eserss’ | 061 | 252
5-0PU dist new conn | 74/cH2707 | 330° | 0-983 | 251!
add 8°S2°40" for A.M.G. — Zone 56
Scale 1:1500 - Lengths are in Metres.
Lissitesil 1 L J 1 L L 4 1 4
sisi oi vic an a 2 2600)CUOtC«SSC“<‘iCSC“‘ COCO
4 [o. 1 i f 1 80|mm uy 1 {00 fmm 5 1 L 1 150 |mm __ State copyright reserved.
. Scale: 4:1500
Flan of Lots 1-3 0 ;
f 6,10 Format: STANDARD
& Common Property
Cancelling Lot 69 on MCHS5480 i
$P111721
PARISH: WE YBA COUNTY: March Pon Statum:
Moridion: MCHS480 FA’ NO
Copyright protects the plan/s being ordered by you. Unauthorised reproduction or amendments are not permitted.
Used in these records
IDASForm6-TreeRemoval-030413.pdfRelated documentApplication case desk ↗