Original source · versioned page text
Town Planning Report
MATERIAL CHANGE OF USE FOR WORKERS ACCOMMODATION UPON LAND AT 23 BOTTLEBRUSH AVENUE, NOOSA PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE c) data cables are disconnected and removed. AO7.3 AO7.3 A temporary crossing is provided to protect A temporary crossing will be used where ☒Compliant road reserve infrastructure including kerb necessary. and channel. ☐N/A ☐Performance Solution AO7.4 AO7.4 Any damage to footpaths, street plantings, Any damage to infrastructure will be repaired ☒Compliant natural vegetation, kerb and channel, as necessary. bridges or roadways at the removal site, the ☐N/A new site or between the sites is repaired or ☐Performance Solution reinstated to at least pre-existing conditions. PO8 AO8.1 AO8.1 Waste materials are removed from the Waste materials are removed from the site. All waste material will be removed from the ☒Compliant site to avoid causing unhealthy site. conditions including: ☐N/A a) potential fire hazard; ☐Performance Solution b) ponding of water; and AO8.2 AO8.2 If a development permit has not been issued Not applicable. c) breeding of vermin. ☐Compliant for the future use of the site: ☒N/A a) hard surfaced areas including concrete slabs are removed or covered with a ☐Performance Solution minimum of 300 millimetres of soil; and b) disturbed areas are revegetated. Brisbane Byron Bay Gold Coast 07 3361 9999 02 6637 9110 07 5613 2499 Postal: PO Box 7657 EAST BRISBANE QLD 4169 E: [email protected] | W: www.tpalliance.com.au Level 1, 32 Logan Road Office 8, 1 Porter Street Shop 12, 228 Varsity Parade WOOLLOONGABBA QLD 4102 BYRON BAY NSW 2481 VARSITY LAKES QLD 4227 Page 121
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.