Appendix D Stormwater Management Plan · MCU22/0038
Plans and drawings: the text below has words only, no drawings.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
15 March 2022 A bioretention basin will be located along the southern boundary of the site with bypass flows discharging to the existing stormwater in the south east corner of the site. The treated flows will connect to the basement drainage system for pump out to the external drainage system. This is required due to the high invert levels of the existing external stormwater network. A bioretention basin will be located on the western boundary of the site with bypass flows discharging to the existing stormwater in the north west corner of the site. The treated flows will connect to the basement drainage system for pump out to the external drainage system. This is required due to the high invert levels of the existing external stormwater network. Stormwater treatment will be implemented to remove sediments, nutrients, gross pollutants and hydrocarbons in accordance with the requirements of Noosa Council and the State Planning Policy. Stormwater discharged from site is proposed to be consistent with the existing commercial development discharge. This development sits within a lot that has been allowed for in previous stormwater calculations, therefore no detention is proposed for this development. The proposed conceptual stormwater drainage layout is depicted on MPN Plan 8662-CP.1.01 attached in Appendix 3. 4.5.2 Stormwater Quantity Management Strategy The proposed development site will connect into the existing drainage system for the Noosa Civic Shopping Centre and Hofmann Drive drainage system. The sites minor flows will run through the existing pipe system whilst the major overflows will overland flow down the internal roads prior to discharging to the Creek to the South of the site. There will be no impacts to external properties as a result of the development flows through the internal site system. The proposed development site has existing stormwater infrastructure which will be utilised for the Medihub development. Excellence with Economy in Engineering 9 l:\8000-8999\8600-8699\8662\reports\15-03-22 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Stormwater Management Plan.pdfRelated documentApplication case desk ↗