Council archive · source document
Appendix D Stormwater Management Plan · MCU22/0038
Plans and drawings: the text below has words only, no drawings.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
Rev. Date Description Iss. Appr.
A 24.01.22 PRELIMINARY PW PW
B 15.02.22 WIP DA LAYOUT PW PW
C 23.02.22 WIP LAYOUT PW PW
D 24.02.22 WIP LAYOUT PW PW
2 3 E
F
01.03.22
02.03.22
WIP LAYOUT
WIP LAYOUT
PW
PW
PW
PW
2000 2000 G 09.03.22 WIP DA PW PW
H 11.03.22 DEVELOPMENT APPLICATION PW PW
I 15.03.22 DEVELOPMENT APPLICATION PW PW
TURN
AROUND BAY
UP
RAMP RAMP
1:10 1:5
1
7100
RAMP UP TO STORAGE/
2000 BASEMENT 1 PLANT
2600
2600
2600
Do not scale this drawing. Verify all dimensions on site before commencing
any work. Copyright © 2020 Buchan. This drawing remains the property of
The Buchan Group Australia Pty Ltd. Reproduction in whole or in part without
prior consent is forbidden.
File
2600
2600
2600
2600
5400 6200 5400 5400 6200 5400
RAMP 1:40
RAMP 1:40
2600
2600
2600
2600
2600
6350
45 CARS Project
2600
2600
Lot 22 Medihub
2600 2600 2600 2600 2600 2600 2600
Noosa Business Centre
28 Eenie Creek Road
LIFT Noosaville QLD
5400
Project Number
721072
Status
Date Plotted
15-Mar-22 9:35:58 AM
Date Issued
15.03.22
Scale
0 1 2 4 6M
Drawing Title
BASEMENT 02
Drawing Number Revision
A-DA-100-B2 I
1 BASEMENT 2
2000 1 : 100
DEVELOPMENT APPLICATION Brisbane Studio
+ 61 7 3859 9222 / buchangroup.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.