Council archive · source document
Appendix D Stormwater Management Plan · MCU22/0038
Plans and drawings: the text below has words only, no drawings.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
15 March 2022
Table of Contents
EXECUTIVE SUMMARY 2
1 PURPOSE 5
1.1 Project Description 5
2 SITE CHARACTERISTICS 6
2.1 Site location 6
2.2 Topography and Existing Site Drainage 7
3 SITE DATA 7
4 STORMWATER 8
4.1 Flooding 8
4.2 Lawful Point of Discharge 8
4.3 Rainwater Reuse 8
4.4 Site Based Stormwater Management Plan 8
4.5 Operational Phase 8
4.6 Proposed Stormwater Quality Treatment Devices 15
4.7 Construction Phase (Sediment and Erosion Control) 16
5 CONCLUSION 19
6 LIMITATIONS OF REPORT 19
Excellence with Economy in Engineering 3
l:\8000-8999\8600-8699\8662\reports\15-03-22 stormwater management plan_issue a.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix D Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.