NOOSA COUNCIL IDAS Development Application Decision Notice                                                 3 of 6




                                    Noosa Council Conditions
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled and numbered Proposed Ground Floor Plan, WD03B;
      Proposed Upper Floor Plan, WD04B; Elevation Plans, WD056B prepared by Middap Ditchfield Architects
      and dated May 2007 and as may be amended by these conditions.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.
3.    Any changes to the area within 4.5 metres of the revetment wall shall be in accordance with the following:
      a)   a minimum of 25% of the area is planted with shrubs; and
      b)   a maximum of 25% of the area is under hard pavement and the balance is to be turf or ground
           covers; and
      c)   No tree species with a mature height of over 3m are to be planted; and
      d)   No shrubs are to be planted within 1m of the revetment wall; and
      e)   The ground surface within the first metre from the revetment wall is turf, ground cover or hard
           pavement.
4.    The building height shall not exceed 2 stories and 8 metres above natural ground level.

5.    All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).

6.    Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
      constructed under overhead electricity transmission lines, or within any easements.

7.    The Preliminary Approval for building work lapses if the use has not happened by 18 July 2009, unless an
      application to extend the currency is approved by Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@a401868c\@[email protected]

Used in these records

About this file

File size
25 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001239.001 [As Published].pdf · 25 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.