19553 - Erosion and Sediment Control Plan

Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Area 1B
T = 1 month
A = 2580m2
S = 1.26 (Ave slope 9.5%, length 129m)
K = 0.047 (inorganic clays of high plasticity)
H = 153

Total TASK number for area 1 = 229 – just exceeds low risk threshold of 200

Area 2 & 4

Area 2 and 4 drain to a common discharge point - existing dam in lot 9.

Area 2
T = 1 month
A = 2800m2
S = 0.73 (Ave slope 4.9%, length 200m)
K = 0.047 (inorganic clays of high plasticity)
H = 96

Area 4
T = 2 months
A = 3500m2
S = 0.21 (Ave slope 1.0%, length 100m)
K = 0.047 (inorganic clays of high plasticity)
H = 69

Total TASK number for area 2 & 4 = 165 – low risk

Area 3

Area 3
T = 1 month
A = 2000m2
S = 0.69 (Ave slope 8.1%, length 80m)
K = 0.047 (inorganic clays of high plasticity)
H = 102 – low risk

Area 5 (individual lot site – example)

T = 1 month
A = 1500m2
S = 0.73 (Ave slope 5%)
K = 0.047 (inorganic clays of high plasticity)
H = 51 – low risk



2. Sediment Basin Sizing
Even though most areas of the site can be considered a low erosion risk it is recommended that
traditional sediment basins be constructed where possible (Type D/F basins). Due the fact that the
majority of the disturbance is longitudinal in shape (ie following the road alignment), there is limited
opportunity and space to construct large sediment basins within the road area and such basins will
need to be removed to allow the road pavement to be constructed. It is envisaged that batters
associated with the road formation will be topsoiled and either mulched or hydromulched to stabilise
these areas prior to the sediment basin being removed to facilitate road construction.



                                             Page 4 of 6
Log in to download the original file

19553 - Erosion and Sediment Control Plan.pdf · 676 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.