19553 - Erosion and Sediment Control Plan

Attached to the e-mail 19553 - 125 Lake Macdonald Drive - Response to information request - OPW20/0051 - Email 1 of 2.

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
RUSLE CALCULATION SPREADSHEET



Note: These "Detailed Calculation" spreadsheets relate only to high erosion hazard lands as identified in table F1 or where the designer chooses to use
the RUSLE to size sediment basins. The "Standard Calculation" spreadsheets should be used on low erosion hazard lands as identifiedin Table F1 and
where the designer chooses not to run the RUSLE in calculations.

1. Site Data Sheet

                                           Site Name: Parc Cooroy

                                         Site Location: Lake Macdonald Drive Lake Macdonald

                                             Precinct: Area 1 - Road 1 Ch 0.0-246

                                   Description of Site: Subdivision


                                                                                   Sub-catchments
                            Site area                                                                                                   Remarks
                                                          1A          1B
  Disturbed catchment area (ha)                          0.24     0.24


Soil analysis (enter sediment type if known, or laboratory particle size data)
  Soil Texture Group                                      D            D             0        0      0         0


Rainfall data
                                                                                                                       85%ile 5 day event for Nambour from Table
  x-day, y-percentile rainfall event                     56.2         56.2
                                                                                                                       B5
  IFD: 2-year, 6-hour storm (if known)                   14.9         14.9


RUSLE Factors
  Rainfall erosivity (R -factor)                         4930     4930                        0      0        0        Auto-filled from above
  Soil erodibility (K -factor)                           0.047    0.047                                                Table E5
  Slope length (m)                                        119         127
  Slope gradient (%)                                      4.7         9.7
  Length/gradient (LS -factor)                           1.36         3.50                   0.00   0.00     0.00      From Table E3.3
  Erosion control practice (P -factor)                    1.3         1.3
  Ground cover (C -factor)                                1            1


Calculations
  Soil loss (t/ha/yr)                                     410     1054              0         0      0        0        RUSLE - refer section E3
  Soil Loss Class                                         D            D            D         0      0        0
  Soil loss (m3/ha/yr)                                    315         811           0         0      0        0
  Volumetric runoff coefficient                          0.72         0.72                                             Refer Table B7
  Settling Zone Storage (m3)                              97          97            0                                  Section B - step 5b
  Sediment basin storage volume, m3                       13          32            0         0      0        0        2 months runoff volume
  TOTAL SUBCATCHMENT BASIN VOLUME                         110         129           0         0      0        0
  TOTAL BASIN VOLUME                                                  239


Basin Dimensions
Depth (nominal)                                                              1.5
Length to width ratio                                                        2.5
Width                                                                          8
Length                                                                       20
Log in to download the original file

19553 - Erosion and Sediment Control Plan.pdf · 676 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.