Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2ND RFI - Attachment 8 - Construction Methodology

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                                        RACV Noosa Resort – Eco Resort




Carpark
The carpark is located at the end of an existing driveway to the site.
The carpark will be at grade and constructed of semi permeable material.
Stormwater catchment will be channelled directly into the bioretention basin strategically located
adjacent to the carpark mostly to be used for erosion and sediment control.
During construction, the carpark area will be utilised for the construction site area for the storage of
building materials.

Construction zones
Areas will be marked and barriered off as ‘no-go’ areas in consultation with the arborist.
Access and transport will be channelled along the routes of the proposed boardwalk/walkways. This
means the use of small agile machinery, designated walking tracks and services lines that can
manoeuvre along these paths.
Ground protection along these routes will be laid and maintained during the course of the
construction.
The use of a fauna/koala spotter will also be required during construction.
Log in to download the original file

2ND RFI - Attachment 8 - Construction Methodology.pdf · 151 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.