Pavement widening required 155
to achieve lane widths as shown pose? Existing Proposed
————E/0H— Overhead electricity time © a a as as Edge of bitumen
Cutback existing traffic island and 5h === ——= Existing kerb and chanent —-—___-—_ Road centreline
construct new kerb line as shown ppgesee Surrounding Wall —_—— Nominal kerb line
Nominal width of widening 0.25m : ee fie “Teletrailine ¥ : Road widening
Refer below for pavement widening
=~ detail — @ — —s—_ Gravity main Concrete footpaths
153 —_ vw _ Water reticulation main
14566
RPS WARNING UNEXPLODED ORDNANCES IN THIS AREA:
© RESIDUAL UNEXPLODED ORDNANCES MAY EXIST ON THIS SITE
Construct extention of * EXCAVATION, EARTHWORKS OR SOIL DISTURBANCE RELATED TO THIS
existing concrete median 2 DEVELOPMENT SHOULD PROCEED WITH DUE CAUTION
with pedestrian refuge and 4566 * IF AN OBJECT SUSPECTED OF BEING AN EXPLOSIVE ORDNANCE OR
breve PURE TARR SS RP PART THERE OF IS FOUND TAKE THE FOLLOWING ACTION
anew © DO NOT DISTURB THE OBJECT AND TAKE MEASURES TO PREVENT IT
BEING DISTURBED BY ANY OTHER PERSON
* NOTE ITS APPROXIMATE DIMENSIONS AND GENERAL APPEARANCE
Pavement widening required width NOTE THE ROUTE TO ITS LOCATION
a Wat to e CONTACT POLICE AS SOON AS POSSIBLE
=| or details
Reconstruct asphalt
pathway to suit
PLANS APPROVED
Date y ‘ &.
Under no circumstances may the P!
from within the written approval of Council
GE. 2008
Name: a acd. KEAD
Signature aol
Delegated Authorisingropésed connection into
bus stop sign to
436
ppsuset
435
ppguseé
Bh
apghs6é
suifnew kerb
Existing gutty pit
Due care to be taken.
when excavating to
avoid damage to
existing services
Proposed 12.5m long Busbay:
Proposed
Childcare
Proposed location of. «Centre
drainage line
proposed kerb levels. 4150
ppgns6e
SSS neceenteyielt \ Proposed intersection \
; Co = upgrade right turn lane
i \ - to be provided. Existing gully pits to be
ional \ uncil \ taken up and new pits to be Bb
2 LILIES Jt constructed on proposed ppgh
Development Permit Ope: ” \ kerb alignment.
RECOMMENDED , é Driveway crossovers to be
= : constructed and connections
oe WoW. 7 made good at all existing ue
: ; driveways. ppgnssé
a ~ oN S;.
4 Pavement widening required width =~
‘ . <
\ Proposed 2.0m wide varies nominally 3.0m, refer to o™“ a % =
concrete pathway Drawing 2384-01-005 for details Wy . \
g <> S »
Z relocated to suit new kerb « / -
| 2 alignment. By others in SN “
Existing concrete co accordance with Energex ~ \
block fence oO requirements a a
'Z.
xy
Assumed existing sewer connection x \ { ™
- if not contractor to provide \ Proposed carpark refer to 28 f
sewer connection to existing v Drawing 2364-01-006 for qu566
manhole \ details RP?
Easement over sewer and
Assumed exist! if t
ndsting water connection zone of influence to be 20 0 2.0 40 6.0 80 10.0m
- if not Council to provide water
meter and connection to main at confirmed by surveyor
developer's expense 1:200 - Al 4:400 - AZ
RPEQ ) 644 SIGNATURE: C2, 3 /1e~e~= © For Cardno (Qid) Pty Ltd
© Cardno (Qid) Pty Ltd All Rights Reserved 2008, DESIGNED: = ML COMISKEY G'
cape nee eanee connec eoerpanies | (ova ANG Al | vaTum: A.H.D. Ceardra eur TE ©
form. on ary mada. 1S ary person cher man by agreement win Carore (Gl Ply Lic CHECKED: = SG.G. c SUNSHINE BEACH CHILDCARE CENTRE aa =
RECOMMENDED: PROJ. MAN. | APPROVED: PROJ. DIR. eh LOT 31 RP149005
reamras me eee oa sores areas S.Gesch S.Gesch iv ehan ete 2384-01-003 |A
is saga Pedestrian refuge added & Inenarting anended = wee cyumo macy Rony ator spect” [CADPR 26-4 STELAYOUT REVAGes ne ONT TE, or. 8 Maes nr snares onianon SITE LAYOUT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.