EROSION AND SEDIMENT MANAGEMENT STRATEGY
ENVIRONMENTAL ISSUE
MANAGEMENT STRATEGY
Ob jective/Target
Comply with the erosion and sediment control plan as shown,
to contral erosion and sediment flows.
Ensure that all erosion and sediment control devices are
operational at all times.
Management Strategy
Site foreman to identify and check direction of stormwater
land flows as shown on plan. Provide barriers and other
measures shown on the plan to prevent stormwater flows
over embankments, and sediments into gutly pits.
Tasks/Actions
Erect sedimentation barriers at perimeter of construction
areas as shawn on this drawing.
Frequency/Deadline
Site foreman to monitor performance after every heavy
rainfalt.
Responsible Person/
Organisation
Site foreman to be responsible for
inspections.
Reporting/Review
Site workmen to advise foreman if they notice any barrier
needing repair.
Corrective Actions
Site foreman to report and order through supervisor, extra
barriers as required.
EROSION & SEDIMENT CONTROL NOTES:
1. This site has low erosion risk potential.
2. Refer IPWEAQ Standard Drawings 0-0040 and 0-0041 for
details of sediment traps.
3. All gullies shall be provided with on grade kerb inlet
sediment trap refer IPWEAQ Standard Drawing D-0041,
4. The Contractor shatt construct Entry/Exit Sediment Trap
Alternative 2, refer IPWEAG Standard Drawing D-0040,
5. Grass filter strips 600mm wide shall be placed along back
of kerb and channel, pathways and other impervious.
areas. Locations shall be confirmed by contractor.
6. Alt allotments shall be revegetated with mulch or grass
seeding as specified in Section AS-B2 of Soil Erosion and
jelines for Queensland Construction
Sediment Control Gi
Sites, June 1996, IEAG.
\
\
Sunshine © Coast Regional Couneil\ \
trom within the written approval of Council.
PLANS APPROVED
\
Sediment trap (sandbags or fence)
Direction of minor flow
Direction of major flow
and Construction Entry/Exit
4
1
oe Erosion and Sediment Control
|
1
|
rusts \
RP \
2.0 4.0 6.0 8.0 10.0m
fang Ay 1400 A RPEQ IES SIGNATURECE?: /fowe-eA . For Cardno (Qld) Ply Lid
1 1 :
© Gardno (Oia) Pry Lid Al Fights Rasanved 2008 eso: ty AMD ES ne GN ee eS & meg tons COMISKEY GROUP
ceria aa toes gaeemnacenneenyeres para: AWD. Cardne = 22525 Brea =
Sees toa rowioan copeaw rorodaee neti ore etn nore! Al oeey go eroass en rete | SGNGHINE BEACH CHILDCARE CENTRE -
Chotovay meas way orn cow ter by epenert oi Cane (Od PYLE r | =e Sp saemse eo wees | LOT 31 RP149005 ™
NED WAN, ff APPROVED: PROL ‘Gay fon 4120 5458 9 4n24 58
Tis soos pc ar 2.8 PL te ea ors { 1 Cardino (Qc) Pry Lid Sere can fi sae ae wn sereasra 2384-01 008
nice Tathemne vena tore Seer ' Now ohcot preeea | eter . . -O1-
- ceo tetretgrare yore a ele) peuorer or eceenomraoee Tae ait sain COM Gwar: Lea!) Maso ma acer oa seee, | Sor {53 foot Sua. tet 88417 | EROSION AND SEDIMENT CONTROL PLAN
| DATE REVISIONS: REC. | aPpRI g Kf & Muneerérmcom ay Ph. cans Fan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1056 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.