Bulk Earthworks Plans
Attached to the e-mail Response to Information Request OPW21/0354 - 8 Robin Place, Lake Macdonald.
Original PDF page 1, section 3. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDENSITY Title
6. INSPECTION AND TESTING OF FILL TO BE CARRIED OUT IN ACCORDANCE WITH AS3798, WITH FILL CARRIED OUT UNDER LEVEL 2 BULK EARTHWORKS PLAN
GEOTECHNICAL SUPERVISION
7. SPILLWAY TO BE COMPRISED OF ANGULAR ROCK OF MEAN 200mm DIAMETER WITH VOIDS BACKFILLED WITH SOIL TO FORM A DENSE
WELL-GRADED MASS TO A MINIMUM DEPTH OF 200MM
8. TEMPORARY OPEN SWALES AND DIVERSION DRAINS TO BE PLACED UPSTREAM OF EARTHWORKS DURING CONSTRUCTION TO PROTECT
EXCAVATION Project No. Discipline Status
20210060 CIVIL OPW
Designed By Drawn By Scale
(at
BRP BRP 1:100 A1)
Drawing No. Revision
C10 A
See the original