Original source · versioned page text
Meeting papers
The original of this document is very large (41.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 126, section 1. The text section number identifies this passage in the reader.
Analysis and plan review
Independent engagement consultants analysed data from the community roundtables, online
survey, and the popups. All of the independent analysis and data from the community roundtables,
online survey, popups and submissions were considered during the plan review.
Report and Council consideration for release
A report, describing the consultation period, consultation input and other information considered
during the review, was developed for consideration by Council. Independent consultation analysis
and reports, the draft plan with track changes, the consultation review table and a clean copy of the
plan are included in the report. These were available on the Council meeting webpage once the
meeting agenda is released. The plan was considered by Council for endorsement and release for
implementation.
This report and associated documents including a report of consultation will remainis available on
the Council meetings section of Council’s website. The independent consultation analysis and
reports, the draft plan with track changes and the consultation review table are available on the
Eastern Beaches Foreshore Reserves Management Plan web page.
Eastern Beaches Foreshore Reserves Management Plan 2023 Page 22
Page 126 of 476
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.