Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Meeting papers

of 478

Page text shows just the words. Original shows the document exactly as it was published.

Very large file: it may take a few minutes

The original of this document is very large (41.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 159, section 1. The text section number identifies this passage in the reader.

EBFMPEBFRMP Management actions
The following actions are identified for implementation:
Prioritisation:
• Immediate: < 1 year
• Medium:1 year – 3 years
• Long: 3 years – 5 years
• Continuing: Commenced and ongoing.

 Action                                                    Responsibility      Priority
 12.1 Develop design standards for beach accesses          Infrastructure      Immediate
 and coastal community infrastructure components.          Services            Continuing
                                                           Environmental
                                                           Services
 12.2. Include the preferred adaptation responses for      Environmental       Immediate
 the different localities described in the Noosa Coastal   Services            Continuing
 Hazards Adaptation Plan in reserve management and         Infrastructure
 community coastal infrastructure design, delivery and     Services
 maintenance.

 12.3. Incorporate equitable access in beach access        Environmental       Medium
 and community infrastructure planning and                 Services
 implementation. Work with stakeholders to deliver         Infrastructure
 equitable access events on the Eastern Beaches.           Services
                                                           Community
                                                           Services
 12.4. Provide visitor information material about EBFR     Environmental       Medium
 recreation, including universal access, online, on-       Services
 reserve and nearby.

 12.5. Incorporate the consideration, protection and       Environmental       Medium
 enhancement of beach profiles and surf breaks into        Services
 management planning and implementation.                   Infrastructure
                                                           Services
 12.6. Work with Local Laws to explore the review of       Infrastructure      Medium
 dog exercise areas, community education and               Services
 information about dogs on beaches and dog related         Environmental
 enforcement.                                              Services
                                                           Local Laws
 12.7. Conduct a review of existing beach accesses,        Environmental       Long
 viewing platforms, signage, fencing, seat and other       Services
 community coastal infrastructure, in line with Noosa’s    Infrastructure
 Design Principles                                         Services

 Review elements include; classification, location, use,
 construction and maintenance, likely inaccessibility
 from flooding, erosion etc, environmental impacts and
 defects, overuse and new or moved beach accesses if
 needed.

 12.8. Develop an overarching beach access plan and        Environmental       Long
 maintenance plan for beach accesses and coastal           Services
 community infrastructure components, including new        Infrastructure
 collaborative management approaches for beach             Services
 accesses that accommodate the impacts of climate          Bushcare
 change, increased erosion, inundation, and fire           volunteers Surf
 danger.                                                   Life Saving clubs
Eastern Beaches Foreshore Reserves Management Plan 2023                                     Page 55


                                                                                            Page 159 of 476
Log in to download the original file

b1337d84ed.pdf · 41.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.