The application was also reviewed by Council’s Acting Director of Infrastructure who has provided
the following comments:
•     Construction of a public road on Council owned freehold land for exclusive access to a private
      development is not supported.
•     Construction of Carpenters Lane may diminish the function of Council land.
•     Construction of Carpenters Lane sets up a wasteful duplication of road and drainage network
      which will require unnecessary and costly road and drainage maintenance.
•     Concerns with traffic conflicts at the Carpenters Lane and Mary River Road roundabout.
•     Inconsistent with Council Council’s Walking and Cycling Strategy. The proposed footpath
      provides a poor connection that required pedestrians to traverse the Carpenters Lane
      driveway area serviced by industrial trucks and cars and is unsafe. In addition, CPTED
      concerns are raised for this unlit concealed route.
•     Insufficient information provided regarding Waste management.

It is noted that the provision of the relevant infrastructure on Council’s land will require the
implementation of an infrastructure agreement which has not been prepared due to the significant
concerns with the proposal.
Stormwater Management
Council’s Stormwater Consultant has reviewed the stormwater management scheme for the
development and indicates that conceptually the treatment is in line with expectations and
adequate space is available on site.
Unitywater / Cooroy Sewage Treatment Plant
The Cooroy Sewage Treatment Plant is located approximately 470 metres to the south with the
treatment ponds 165 metres to the east. The application was informally referred to Unitywater who
have advised that the existing treatment plant has sufficient capacity for the development and that
they have no concerns with odour or noise impacts on the development. The applicant has not
commenced any formal negotiations with Unitywater to date.
4.   CONSULTATION
4.1. Referral Agencies
The application was referred to the following Referral Agencies:
•    Department of State Development, Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency pursuant to Schedule, 10, Part 9, Division 2, Table 2 –
Premises near a substation site or subject to an easement. The Department responded indicating
that the easement and access to the easement must be maintained at all times and provided
conditions of approval.
4.2. Internal Council Referrals
The application was forwarded to the following internal Council officers:
•    Principal Strategic Planner
•    Senior Environment Officer
4.3. Other Referrals
The application was forwarded to the following external experts for review and/or comment:
•    Traffic Engineer
•    Hydraulic Engineer
4.4. Public Notification
The application was publicly notified for 15 business days, with the time for submissions extended
by 15 business days due to an error on the applicant’s behalf regarding the public notification
                                                                                     Page 21 of 26

                                                                                            Page 283 of 476

Log in to download the original (b1337d84ed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.