The From Waste to Resource: Noosa Council        The most significant source of Council
Waste Plan 2023-2028 (the Waste Plan) has        emissions is the landfill owned and operated
several key drivers. Adopting these drivers,     by Noosa Council that receives and manages
Noosa Council will develop a comprehensive       the Noosa community’s residential and
Waste Plan that meets legislative                commercial waste.
requirements, addresses environmental
                                                 Noosa Council’s Zero Emissions Strategy sets
concerns, supports a circular economy and
                                                 an ambitious target of zero net emissions for
economic opportunities, and importantly,
                                                 the organisation by 2026.
aligns with the Noosa community’s values.
                                                 Reducing landfill emissions is a critical driver of
National and Queensland                          the Waste Plan.
Waste Targets                                    Circular Economy and
In 2018 the Commonwealth Government              Economic Opportunities




                       T
endorsed the 2018 National Waste Policy
which preceded the National Action Plan 2019.    Transitioning towards a circular economy,




                     F
The National Action Plan presents targets        where waste is minimised and materials
and actions to implement and guide the use       are reused and recycled, creates economic




                    A
of waste as a resource to 2030 and beyond.       opportunities.
There are also targets in the Queensland Waste




                   R
                                                 A principal motivator of the Waste Plan is
Management and Resource Recovery Strategy        ensuring that valuable resources will be
2019. Refer Attachment 1 for more detail.




                 D
                                                 conserved, reducing the need for raw material
All Queensland local governments are             extraction including reliance on fossil fuels.
required to have a Waste Reduction and
Recycling Plan under the Queensland Waste        Cost Savings
Reduction and Recycling Act 2011 (the Act).
                                                 A waste levy was introduced by the
The Waste Plan will meet key objectives of the
                                                 Queensland Government on 1 July 2019, to
Act such as:
                                                 reduce the amount of waste going to landfill,
•	Promoting waste avoidance, reduction and
                                                 and to maximise resource recovery and
    resource recovery actions.
                                                 recycling. Initially, the waste levy was charged
•	Reducing consumption of natural
    resources and minimising the disposal of     to commercial operators but as of 1 July 2023
    waste by encouraging waste avoidance         the levy will be applied to both commercial and
    and the recovery, reuse and recycling of     domestic customers.
    waste.                                       In the 2021-22 financial year, the State waste
•	Minimising the overall impact of waste        levy was $85 per tonne (excl. GST). Separate
    generation and disposal.                     to the State waste levy, every tonne of waste
•	Encouraging shared responsibility for         sent to landfill cost Council $147 per tonne.
    waste management and resource recovery       Approximately 45,000 tonnes were sent to
    by government, business, industry and the    the Eumundi Noosa Road landfill, resulting in
    community.                                   a total cost of $6.6 million. Moreover, a landfill
                                                 extension was constructed at Eumundi Noosa
Greenhouse Gas Emissions                         Road landfill, costing $9 million.
In 2019, Noosa Council declared a climate        The levy applies to various waste types,
emergency - a strong statement in support of     including municipal solid waste, construction
action on climate change.                        and demolition waste, and regulated waste -

                                                                                                              11
                                                                                                  Page 355 of 476

Log in to download the original (b1337d84ed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.