Meeting papers
Attachment 2
Noosa Shire Council
2023/24 Capital Program - Budget Review 1
Depreciation
Levy Other General Cash Total
Program Original Budget Carryover Emergent Total Grants Loans funded Cash
Reserves Reserves Reserve Funding
Reserve
Parks & Playgrounds
Cooroy - Lake MacDonald Drive - Wedding Chapel Renewal 45,100 45,100 45,100 45,100
Noosaville - Apex Park Fitness Equip - Upgrade - LGIP 131,900 131,900 131,900 131,900
Shire BBQ Renewal Program 80,000 80,000 80,000 80,000
Shire Park Furniture Renewal Program 100,000 100,000 100,000 100,000
Shire Park Shelter Renewal Program 45,000 45,000 45,000 45,000
Gympie Terrace Foreshore Shelter Renewal SEQCSP2124 60,000 97,608 157,608 60,000 97,608 157,608
Noosaville Gympie Terrace Park Furniture Renewal SEQCSP2124 30,000 20,000 50,000 30,000 20,000 50,000
Peregian Beach Skate Park Design & Construct SEQCSP2124 356,673 356,673 130,000 226,673 356,673
Noosa Waters Entry Statement Renewal 99,118 99,118 99,118 99,118
Noosaville - Wheechair Accessible Park Furniture at Boathouse 60,000 60,000 60,000 60,000
Parks & Playgrounds Total 552,000 573,399 1,125,399 220,000 905,399 1,125,399
Pathways & Boardwalks
Noosa Heads - Claude Batten Drive - Pathway renewal 78,800 78,800 78,800 78,800
Noosaville - Seagull Park - Pathway renewal 81,000 81,000 81,000 81,000
Shire Wide - Pathway Renewal Program 470,000 470,000 470,000 470,000
Hinterland Urban Areas Emergent Pathway Works 119,265 119,265 119,265 119,265
Noosa Hinterland Trail Priority Remediation Ecological Areas 247,671 247,671 247,671 247,671
Tewantin - Cooroy Noosa Rd - Pathway renewal 183,800 183,800 183,800 183,800
Tewantin - McKinnon Dr - Pathway renewal 187,600 187,600 187,600 187,600
Sunshine Beach BelmoreTce Pathway Renewal WCS SEQCSP2124 96,800 96,800 96,800 96,800
Noosa Hinterland Condition Assessment and Prioritisation 50,000 49,896 99,896 99,896 99,896
Pathways & Boardwalks Total 1,148,000 416,832 1,564,832 96,800 1,468,032 1,564,832
Public Transport Infrastructure
Shire Wide - Bus Stop Upgrades 23-24 221,300 221,300 65,000 156,300 221,300
Public Transport Infrastructure Total 221,300 221,300 65,000 156,300 221,300
Sealed Roads Network
Shire Kerb & Channel Renewal Program 200,000 200,000 200,000 200,000
Shire Reseal Program 4,399,000 606,394 5,005,394 622,000 4,383,394 5,005,394
Kerb and Channel Renewal Program SEQCSP2124 78,583 78,583 78,583 78,583
Federal Middle Creek Road Resconstruction - LRCI Phase 3 98,585 98,585 98,585 98,585
Noosa Heads Arkana Dr Med Strip Stabilisation LRCI Phase3 234,025 234,025 234,025 234,025
Shire Wide - Heavy Patching 1,500,000 1,500,000 1,500,000 1,500,000
Shire Wide - Roundabout Signage 300,000 300,000 300,000 300,000
Sunrise Beach - 56 David Low Way - Retaining Wall Construction 319,000 319,000 319,000 319,000
Sealed Roads Network Total 6,718,000 1,017,586 7,735,586 622,000 7,113,587 7,735,587
Page 413 of 476
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (b1337d84ed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.