Original source · versioned page text
Meeting papers
Appendix A
Schedule of Proposed Borrowings:
2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 2029/30 2030/31 2031/32 2032/33
Proposed 8,905,000 6,500,000 0 0 0 0 0 0 0 0
Borrowings
Borrowing Waste management, bridge and lock and weir infrastructure works included in the adopted 10-year capital plan.
Purpose
Page 5
Page 431 of 476
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (b1337d84ed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.