Corporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Update Q4 Status
Focus Areas Areas
Implement the Walking and Facilitation of walking and Infrastructure Pathway works complete for the financial year, with On track
Cycling Strategy cycling for transport, Planning, an increased program of works endorsed for Accelerating the
recreation, health, and Design & 2023/2024. The delivery of walking and cycling delivery of the Cycling
tourism Delivery Infrastructure is on track, except for end of trip and Walking
facilities which are being delivered in coordination Implementation Plan is
incorporated in the
with existing capital projects. This includes priority
23/24 Oper. Plan
infrastructure projects listed in the NCWSIP. Actions
listed in the plan to increase participation are
underway, with a focus on school age education and
training. Although currently on track, no TMR cycle
grant projects were included in the 2023/24 Financial
year, delaying the implementation of the NCWSIP
plan roll out.
Noosa Hinterland recreation Increased recreational Environmental Works on Trail 5 completed with opening event taking On track
trails upgrade/implement opportunities and improved Services, place in April 2023, and future renewal works Continuing to support
Noosa Trails Master Plan multi use trails and linkages Infrastructure endorsed in the 2023/24 capital works program. the planning and
informed by an Audit of the within the trails network Planning, The Trails Masterplan Implementation plan has been delivery of the
trail network Design & drafted and internal feedback sought. Next step is a maintenance
Council workshop.
Delivery. programs for the
Noosa Trails Network
is incorporated in the
23/24 Oper. Plan
Pathways expansion Improved access and Infrastructure Forward planning continues with the inclusion of an On track
connectivity within the shire Planning, additional four (4) missing link pathway projects Continuing to deliver
Design & included in the 23/24 capital works program. Projects the pathway renewal
Delivery include design and delivery components across the program is
Shire. incorporated in the
In addition to missing link upgrades, over one million 23/24 Oper. Plan
dollars of renewal works have been adopted in the
23/24 capital works program.
Support free weekend Incentivised public transport Infrastructure Working with the comms team on Go Noosa rebrand On track
Page 459 of 476
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (b1337d84ed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.