Skip to the record
The only place to find full transcripts.

Council archive · source document

Development Assessment Report · MCU15/0122

Attached to the e-mail MCU15/0122 Development Application - Report, Economic Needs & Traffic reports Email 2 of 5.

of 54

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

KHA DEVELOPMENT MANAGERS – 15180                                                                  December 2015




SERVICING

The collection of waste and garbage will be undertaken within the site directly from the designated refuse
collection area. It is proposed to utilise 1100 litre bins for waste storage and collection, with bins housed
within the designated storage area.

It is anticipated the refuse vehicle shall access the site on a weekly basis for collection of waste though the
frequency will be adapted to suit the development needs and fit within the strategy adopted by the centre
and refuse contractor. It is anticipated that during collection, the vehicle will reverse into the designated
position outside the refuse room allowing vehicles to enter the site unobstructed during collection. The
development also provides for service vehicle access and parking for an ambulance and a MRV.

Please refer to the attached Traffic Impact Assessment prepared by Road Pro Development for further
information.

INFRASTRUCTURE

The proposed development will be connected to all essential urban infrastructure. Please refer to the
attached Engineering Service Report prepared by Morgan Consulting Engineers which addresses all
infrastructure servicing requirements of the proposed development in accordance with Noosa Council
standards and best practice.

Stormwater will be collected and treated on site and discharged into a legal point of discharge in
accordance with the attached Stormwater Management Plan prepared by Morgan Consulting Engineers.
The Stormwater Management Plan investigates the effects the development will have on stormwater
quantity and quality. The Stormwater Management Plan found that the development will not result in
adverse impacts on the environmental values of receiving waters during the construction and operational
phases of the development. The Stormwater Management Plan also includes recommendations to ensure
that the post development peak outflow conditions are not greater than the pre-development peak outflow
conditions.




Development Assessment Report                                                                       Page 9 of 34
Material Change of Use for Medical Centre and Café
52-58 Goodchap Street & 3-7 Val Crescent, Noosaville

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Assessment Report.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.