Council archive · source document
SUPERSEDED Negotiated Decision Notice - Advice Agency - EPA [As Published] · 132007.2399
2007/2399
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
60. A registered easement shall be created over any stormwater drainage discharge points from
the proposed Stages 1 or 2 to enable that Stage to discharge stormwater onto the golf course
parcel. Easements shall also be created if required to allow Council’s road reserve and the
golf course to discharge onto Stage 1 or 2.
61. Registered easements are to be provided on the Plan of Survey over all sewerage mains
within private property. Easements are to be equivalent in width to twice the depth to invert
level of the sewer at the deepest point within the allotment. Easements are to be provided
parallel to and centred over the sewer line, with a minimum width of 3.0 metres.
62. No building or other structure shall be constructed or encroach over an easement.
63. Any building or structure within proximity of an easement or any other public utility’s
underground services must have its foundations designed so that no surcharge loads are
imposed upon such underground infrastructure. Foundations must be taken down a minimum
of 1.0m below a line of influence measured 1.0m in the direction of the foundation from the
centreline of the closest underground service and along the natural angle of repose of the
foundation soil type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed by
a registered practicing Geotechnical Engineer and submitted with the application for a
Development Permit for Operational Works.
Earthworks
64. A registered practicing Geotechnical Engineer shall test the existing ground conditions for
suitability of placing additional fill, prior to such fill being placed.
Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper
to the level of the adjoining property prior to the rear boundary of the property. Batters shall be
at a maximum grade of 1:4 unless retained by a wall.
Any existing fill or natural materials on the site or with the extent of approved works external to
the site which do not satisfy the Manager - Land Development's or a Geotechnical Engineer's
requirements shall be removed and replaced with suitable material.
65. Following completion of the filling works and prior to endorsement of the Plan of Survey for
Stage 2, the registered practicing Geotechnical Engineer supervising the works shall submit
compaction tests across the entire filled areas and a site classification report for each lot
subject to filling. The extent of fill and each lot site classification shall be shown on a metes
and bounds survey plan.
An appropriate property notation shall be placed on Council's rates records to advise
prospective purchasers of lots that have been filled that special foundations requirements will
apply.
11 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - Advice Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.