Skip to the record
Accept no substitutions.

Original source · versioned page text

2017-05-18 Ordinary Meeting Minutes

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                              18 MAY 2017


            2016.0028-011     A      Site 8 prepared by International Coastal    20 October 2016
                                     Management
            2016.0028-012     A      Site 9 prepared by International Coastal    20 October 2016
                                     Management
            2016.0028-013     A      Site 10 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-014     A      Site 11 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-015     A      Site 12 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-016     A      Site 13 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-017     A      Site 14 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-019     A      Site 16 prepared by International Coastal   20 October 2016
                                     Management
            2016.0028-020     A      Detail prepared by International Coastal    20 October 2016
                                     Management

     2.   All equipment and structures associated with the works must be located in accordance
          with the approved plans.
     3.   Safe access in the vicinity of the works must be maintained at all times.
     4.   Any construction and post construction activity is not to impact on the condition of the
          waterway, and is to be conducted so as not to breach the Environmental Protection Act
          (EPA) 1994 and the Environmental Protection (Water) Policy 2009.
     5.   Certification by a Registered Professional Engineer of Queensland must be submitted
          to Council at the completion of the works. The certification must state that the works
          have been constructed in accordance with best practice methods, are in accordance
          with Coastal Protection and Management Act 1995.
                                                                                          Carried.




The following Recommendations from the Planning & Environment Committee were
adopted without discussion or further amendment.

Council Resolution
Moved:         Cr Jurisevic
Seconded:      Cr Glasgow
The Planning & Environment Committee recommendations dated 9 May 2017 be adopted except
where dealt with or held over by separate resolution.
                                                                                          Carried.




                                                                                      Page 5 of 10
Log in to download the original file

2017-05-18 Ordinary Meeting Minutes(PDF, 488KB).pdf · 500 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.