INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008

 

Oetails of the premises

The term ‘premises is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other

structure is situated on the land). The term ‘land’ is also defined to include the estate in, an, over or under the land.

Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete

Table A.

The premises may be identified in a number of ways —

« Street address and lot on plan are most common and will apply to most applications.

+ Coordinates may provide the best means of accurately identifying the facation of development proposed in waters, or an a relatively smail
development site distant from property boundaries on a large tot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application, Eastings and northings using GDA94 datum is preferred, but fongitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.

The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.

StrategicPortLandis within a local gavemment area but a local government's planning scheme does not apply onStrategicPortLand.

StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to DAS Guide 11 (Development on

strategic port land) and the Queensland Transport (Ports) website.

‘Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic

port land is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water

mark at spring tides) establishes the boundary of a tidal area, Land below high water mark is not within a.local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the.Environmental Protection

Agency generally has jurisdiction for a local govemiment tidal area. However, the IPA gives local governments jurisdiction for assessing and

deciding apptications for prescribed tidal works wilhin the local government tidal area, and the planning scheme may be applied to that

assessment (to the extent provided for in the code for prescribed tidal work).

 

 

Resource entitlement

Section 3.2.1(5) of the IPA requires evidence of resource entitlement de given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the Integrated Planning Requiation 1998 (\PR) prescribes the State resources, including State-
owned land, where evidence Is required to be given, and the evidence required to support the application, Link to Integrated Planning
Regulation, Section 3.2.1(10}(a}(ii) states an application cannot be taken to be properly made without the required evidence.

For applications involving the taking or interfering with water under the Water Act, the dévelopment application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
For State-controlted roads, a resource entitlement is not required far an activity that is exempt ancillary works or encroachment (identified by
gazette notice undar the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, @.g. from the Environmental Protection
Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.

 

Owner's consent

Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owners, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994,
Evidence of this consent may need to be-provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.

“Owner for the purpdse of a lodging an IDAS development application means the person at the time of fadging the: application, entitled to
receive the rant for the tand (or would be entitled to receive the rent for it if it were tet to a tenant at a rent).

Templates ara available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.

 

Portable Long Service Leave (PLSL) Levy

The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entittements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service teave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is callected on certain building and construction work carried out inQueenstand.

The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction industry
(Portable Long Service Leave) Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.

The Building and Construction industry (Portable Long Service Leave) Act 1997 (PLSL Act) defines the building and construction work subject to
the PLSL tevy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, rdads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
be issued,

The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueensiandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.cleave.qld.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web:

‘wvaw, gleave.qid.gov.au )

 

 

 

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0828 - MCU - Entertaining & Business Type 1 [As Published].pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.