Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Appendix H Traffic Impact Assessment · RAL25/0004

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                                                                                                                                   IT IS THE RESPONSIBILITY OF THE
                                                                                                                                                                                                                                                                                                                                                               CONTRACTOR TO CONTACT THE RELEVANT
                                                                                                                                                                                                                                                                                                                                                              AUTHORITIES TO CONFIRM THE LOCATION OF
                                                                                                                                                                                                                                                                                                                                                                 ALL EXISTING SERVICES PRIOR TO THE
                                                                                                                                                                                                                                                                                                                                                                   COMMENCEMENT OF EXCAVATION




                                                                                                                                                                                                                                                                                                                                    LEGEND
                                                                                                                                                                                                                                                                                                                                      NS
                                                                                                                                                                                                                                                                                                                                                           PHASE 1 EARTHWORKS - CONTAMINATED AND
                                                                                                                                                                                                                                                                                                                                      NS Strip             ORGANIC SOIL STRIP
                                                                                                                                                                                                                                                                                                                                      NS Strip

                                                                                                                                                                                                                                                                                                                                      EW Design
                                                                                                                                                                                                                                                                                                                                                           PHASE 2 EARTHWORKS - CUT

                                                                                                                                                                                                                                                                                                                                      EW Design

                                                                                                                                                                                                                                                                                                                                      NS Strip
                                                                                                                                                                                                                                                                                                                                                           PHASE 2 EARTHWORKS - FILL

                                                                                                                                                                                                                                                                                                                                      EW Design
                                                                                                                                                                                                                                                                                                                                                           PHASE 2 EARTHWORKS - BACKFILL STRIPPED
     128                                                                                                                                                                                                                                                                                                                              NS Strip             SURFACE
                                                                                                                                                                  APPROX. 0.6m DEPTH OF
     127                                                                                                                                                          ORGANIC MATERIAL TO                                                                                                                                                                      EXISTING SURFACE LEVEL
     126                                                                                                                                                          BE REMOVED FROM SITE
                                                                                                                                                                                                                                                                                                                                                           EXISTING SURFACE STRIPPED OF TOPSOIL,
                                                                                           RP BDY




     125                                                                                                                                                                                                                                                                                                                                                   CONTAMINATED SOIL AND ORGANIC MATERIAL




                                                                                                                                                           0.6m
     124                                                                                                                                                                                                                                                                                                                                                   FINISHED SURFACE LEVEL

     123                                                                                                                                                                                                                                                                                                                                                   EARTHWORKS SURFACE
                                                                                                                     1.0% MIN
     122
     121
     120
     119
     SECTION E Datum RL118
     Scale 1:125 A3




                                                                            CONTAMINATED FILL DEPTH ~1m TO BE EXPORTED                                                                  TOPSOIL DEPTH ~200mm TO BE STRIPPED AND STOCKPILED ON SITE                                       EXISTING PINE PLANTATION ~600mm ORGANIC MATERIAL TO BE EXPORTED


     125




                                                                                                                                                                                                                                                                                                                                                                                                                   RP BDY
     120



     115
                    LAKE
                 MACDONALD
                     DR
     110
                            RP BDY




     105


                      STW
     SECTION D Datum RL100
     Scale 1:250 A3




                                                                                                                                                                                                                                                                                                                                                              Check all dimensions before commencement of work.
                                                                                                                                                                                                                                                                                                                                                              Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                              Check Building Boundary clearances by set out.
                                                                                                                                                                                                                                                                                                                                                              Notwithstanding the information supplied on this drawing,
                                                                                                                                                                                                                                                                                 SCALE 1:125 (A1) - 1:250 (A3)         SCALE 1:250 (A1) - 1:500 (A3)          the location, depth and extent of underground or overhead
                                                                                                                                                                                                                                                                                                                                                              services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                              contractor prior to commencement of works.
                                                                                                                                                       Approved
Checked -    CT
                                                                                                                                Consulting Civil &                                                            Drawing title -                        Project -   COMMUNITY AFFORDABLE                  Site -                                                Project No.     233467 Sheet No.                  C121
Design -    SK         Drawn -       SK                                                                                         Structural Engineers                                                          EARTHWORKS SECTIONS - SHEET 2                      HOUSING DEVELOPMENT                   62 LAKE MACDONALD DRIVE,                              Digital Ref :
                                                                                                                                                                                                                                                                                                                                                                             C120-C121 EARTHWORKS
                                                                                                                                                                                                                                                                                                                                                                             SECTIONS                Issue :         A
Scales -    AS SHOWN                                                                                                            Project Management     124 DUPORTH AVENUE             Ph (07) 5443 7777                                              Client -
                                                                                                                                                                                                                                                                 NOOSA COUNCIL                         COOROY                                                 This Document is copyright and shall not be copied
                                                                                                         ASSOCIATES PTY LTD                            PO BOX 16                      Fax (07) 5443 7577                                                                                                                                                      without written approval, nor shall it be used except
  Document Stage -           APPROVAL
                                                A   14/12/23   PRELIMINARY ISSUE                    SK
                                                                                                                                & Planning             MAROOCHYDORE QLD 4558
                                                                                                                                                                                                                                                                                                                                                                  for the Development and the Site Specified.
                                               Issue Date                    Description            By                                                 E-MAIL: [email protected]
       c:\12dS\data\12DSERVER\233467_2957\DWG Covey\OPW\Uncontrolled\C120-C121 EARTHWORKS SECTIONS.dwg                                                                                                                                                                                                                                                      Plot 7 June 2024 - 11:05 AM

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H Traffic Impact Assessment.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.