Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix H Traffic Impact Assessment · RAL25/0004

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 24, section 1. The text section number identifies this passage in the reader.

       EROSION AND SEDIMENT CONTROL NOTES
       THE FOLLOWING NOTES AND DETAILS PROVIDE INFORMATION ON THE CONTROLS AND
                                                                                                                                                                                            EROSION AND SEDIMENT                                                                                                                                     SEDIMENT FENCE CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                     1.      SEDIMENT FENCE TO BE INSTALLED ALONG                             WHICH CASE 3.0m MAX. SPACING.
       PROCEDURES THAT ARE TO BE IMPLEMENTED AS PART OF THE EROSION AND SEDIMENT
       CONTROL PLAN (E&SCP). THESE MEASURES ARE CONSIDERED SUFFICIENT TO ENSURE
       THE EROSION AND SEDIMENT CONTROL STANDARD WILL BE MET, GIVEN THE SITE
                                                                                                                                                                                              CONTROL DETAILS                                                                                                                                                A LINE OF CONSTANT GROUND ELEVATION
                                                                                                                                                                                                                                                                                                                                                             WHEREVER PRACTICAL.
                                                                                                                                                                                                                                                                                                                                                                                                                      4.      FENCE ‘RETURNS’ SHALL BE INSTALLED AT
                                                                                                                                                                                                                                                                                                                                                                                                                              MAXIMUM 20m SPACING IF FENCE IS
                                                                                                                                                                                                                                                                                                                                                        2.   BOTH ENDS OF THE SEDIMENT FENCE TO                               INSTALLED ALONG THE CONTOUR,
       CHARACTERISTICS, PROPOSED DEVELOPMENT AND CONTROL MEASURES.                                                                                                                                                                                                                                                                                           EXTEND UP THE SLOPE AT LEAST 1.0m.                               OTHERWISE 5 TO 10m MAXIMUM SPACING.
                                                                                                                                                                                                                                                                                                                                                        3.   SUPPORT POST TO BE SPACED A MAXIMUM                      5.      MINIMUM 4 STAPLES OR TIE WIRES PER
       CONSTRUCTION MANAGEMENT PLAN                                                                                                                              ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IECA MANUAL                                                                                                                                     2.0m UNLESS THE FENCE IS SUPPORTED BY                            STAKE.

       OBJECTIVE/TARGET
                                                                                                                                                                            FOR EROSION AND SEDIMENT CONTROL                                                                                                                                                 A TOP WIRE OR WIRE MESH BACKING, IN

       TO ENSURE THAT:
       (A) STORMWATER QUALITY LEAVING THE SITE IS OF ACCEPTABLE STANDARDS                                                                                                                                                                                                                                                                                                                                      STAPLE/TACK                                  FABRIC B
       (<50MG/L TSS AND <75 NTU).
       (B) EROSION AND SEDIMENTATION DURING CONSTRUCTION IS MINIMISED.                                                                                                                                                                                                                                                                        FABRIC

       THE ABOVE OBJECTIVES ARE TO BE ACHIEVED BY COMPLYING WITH THE FOLLOWING                                                                                                                         ‘RETURNS’ PLACED AT 20 M SPACING (MAX.) IF FENCE IS
       REGULATIONS AND GUIDELINES:                                                                                                     3m (MAX.) WITH WIRE BACKING                                     LOCATED ALONG THE CONTOUR, OTHERWISE 5 TO 10m
            ·        EPACT 1994 AND RELEVANT POLICES.                                                                                         OTHERWISE 2m (MAX.)                                      DEPENDING ON SLOPE
            ·        INSTITUTION OF ENGINEERS SEDIMENT AND EROSION CONTROL GUIDELINES.                                                                                                                                                                                                                                                             BACK FILL                                                      FABRIC A
            ·        IECA'S BEST PRACTICE EROSION & SEDIMENT CONTROL                                                                                                                                                                                             1.5m (MIN.)                                                                                                                                                          SAFETY CAP
                                                                                                                       DIRECTION OF FLOW
       MANAGEMENT STRATEGY                                                                                                                                                                                                                                                                                                                                                                       SUPPORT POST OPTION 1
       THE SITE FOREMAN WILL BE RESPONSIBLE FOR:                                                                                                                                                                                                                                                                                                                                                 1500mm² HARDWOOD STAKE
          ·    IDENTIFYING AND CHECKING STORMWATER LAND FLOWS.
                                                                                                                                                                                                                                                                                                                                                             SOIL
          ·    PROVIDE BARRIERS AND OTHER MEASURES TO PREVENT STORMWATER FLOWS                                                                                                                                                                                                                                                                                                                                                  SUPPORT POST OPTION 2
               OVER EMBANKMENTS AND SEDIMENTS INTO EXISTING GULLY PITS.                                                                                                                                                                                                                                                                                                                                                            1.5kg/m STEEL PICKET

       TASKS/ACTION PRE-CONSTRUCTION                                                                                                                                                                                                                                                                                          SEDIMENT FENCE                                                                        SEDIMENT FENCE
       BEFORE CONSTRUCTION ACTIVITIES BEGIN, THE FOLLOWING MEASURES NEED TO BE                                                                                                                                                                                                                                            ANCHORING BASE OF FABRIC
       IMPLEMENTED TO MINIMIZE DISTURBANCE AND ADVERSE WATER QUALITY IMPACTS.
                                                                                                                                                                                                                                                                                                                                                                                                                     JOINING FABRIC
          ·   SEDIMENT FENCES ARE TO BE CONSTRUCTED AT THE TOP OF EMBANKMENTS                                                                                                                                                                                                                                                           NOT TO SCALE                                                                  NOT TO SCALE
              AND AT THE BASE OF FILL EMBANKMENTS.
          ·   DIVERSION BANKS TO BE CREATED AT THE UPSTREAM BOUNDARY OF                                                                                                                                                                     ALL SUPPORT POSTS PLACED
              CONSTRUCTION ACTIVITIES TO ENSURE UPSTREAM RUNOFF IS DIVERTED                                                                                                                                                                 DOWN-SLOPE OF FABRIC                                                                                                                                                      TEMPORARY ENTRY/
              AROUND ANY AREAS TO BE EXPOSED. CATCH-DRAINS AT THE DOWNSTREAM                                          FABRIC
                                                                                                                      BURIED                                                                                                                                                                                  CONSTRUCTION SITE                                     CATTLE GRID 3.0m NOM WIDTH                        EXIT CONSTRUCTION NOTES
              BOUNDARY OF CONSTRUCTION ACTIVITIES SHOULD ALSO BE CREATED                                                                                                                                                                                                                                                                        5m                  SET 300mm ABOVE GROUND
                                                                                                                      200mm                                                        SEDIMENT FENCE FABRIC, NOT                                                                                                                                 MIN                                                                     1.      STRIP THE TOPSOIL, LEVEL THE SITE AND




                                                                                                                                                                                                                                                                                                                    NOM
              (WHEREVER POSSIBLE) TO ENSURE ANY SEDIMENT-LADEN RUNOFF IS




                                                                                                                                                                                                                                                                                                                    100
                                                                                                                                                                                   FILTER CLOTH OR SHADE CLOTH                                                                                                                                                                                             T                  COMPACT THE SUBGRADE.
              CONTAINED AND DIRECTED TOWARD TREATMENT AREAS AND NOT PERMITTED                                                                                                                                                                                                                                                                                                                           EN
                                                                                                                                                                                                                                                                                                                                                                                                     NM                2.     COVER THE AREA WITH NEEDLE-PUNCHED
              TO FLOW ONTO DOWNSTREAM UNDISTURBED AREAS. DIVERSION BANKS SHOULD                                                                                                                                                                                                                                                                                                                A LIG
                                                                                                                                                                                                                                                                                                                                                                       10                   TY                                GEOTEXTILE.
              BE CONSTRUCTED APPROXIMATELY ALONG CONTOURS TO MINIMIZE SCOUR                                                                                                                                                                                                                                                                                         MIN m                ER
                                                                                                                                                                              INSTALLATION OF SEDIMENT FENCE                                                                                                                                                                          OP                               3.     CONSTRUCT A 200mm THICK PAD OVER
              ALONG THE DRAINS.                                                                                                                                                                                                                                                                                                                                                    PR            EL
                                                                                                                                                                                                                                                                                                   GEOFABRIC FABRIC,                                                                         NN                               THE GEOTEXTILE USING ROAD BASE OR
          ·   SILT FENCES AND SAND BAGS WILL BE PLACED ALONG CATCH DRAINS TO SLOW                                                                                                                    NOT TO SCALE                                                                                                                                                                          HA




                                                                                                                                                                                                                                                                                                                              300
                                                                                                                                                                                                                                                                                                   BIDUM A34 OR SIMILAR                                                                & C          Y                         30mm AGGREGATE.
              FLOW, REDUCE SCOUR, MINIMIZE SEDIMENT FROM RUNOFF.                                                                                                                                                                                                                                                                                                                    RB          WA
                                                                                                                                                                                                                                                                                                                                                                                 KE          AD                        4.     ENSURE THE STRUCTURE IS AT LEAST
          ·   STRATEGICALLY PLACE CHECK DAMS AROUND GULLY PITS. DESIGNATION OF                                                                                                                                                                                                                                                                                                            RO
                                                                                                                      FILTER SOCKS                                                                                                                                                                                                                                  3 mIN              W                                      15m LONG OR TO BUILDING ALIGNMENT
              AREAS FOR PLANT AND MATERIAL STORAGE.                                                                                                                                                                                                                                                                                                                   M             NE                                        AND AT LEAST 3m WIDE.
                                                                                                                      OVERLAP ONTO KERB                                                                                                                                                                                                                                          OR
          ·   DESIGNATION AND MARKING OF TRANSPORT ROUTES ACROSS UNDISTURBED                                                                                                                                                                                                                                                                                                  G,                                       5.     WHERE SEDIMENT FENCE JOINS ONTO
              PORTIONS OF THE SITE TO MINIMIZE UNNECESSARY VEGETATION DISTURBANCE.                                                                                                                                                                                                                                                                                      I STIN
                                                                                                                                                                                                                                                                                                   RUNOFF TO BE DIRECTED TO A SEDIMENT                              EX                                                        THE STABILISED ACCESS, CONSTRUCT A
          ·   EDUCATION OF SITE PERSONNEL TO THE SEDIMENT AND EROSION CONTROL                                                                                                                                                                                                                      TRAP. REFER STANDARD DRAWING DS-302.                                                                                       HUMP OR GRATE IN THE STABILISED
              MEASURES IMPLEMENTED ON SITE.
                                                                                                                        SEDIMENT                                                                                                                                                                                                                                                                                              ACCESS TO DIVERT WATER TO THE
       TASKS/ACTIONS DURING CONSTRUCTION                                                                                    POND                                                                                                                                                                                            TEMPORARY ENTRY/EXIT                                                                              SEDIMENT FENCE.
       MEASURES TO MITIGATE WATER QUALITY IMPACTS DURING CONSTRUCTION.
         ·   CONSTRUCTION ACTIVITIES BE CONFINED WITHIN THE NECESSARY
             CONSTRUCTION AREA(S)
         ·   INSTALLATION OF SILT FENCES DOWNSTREAM OF DISTURBED AREAS. SILT                                          RUN-OFF                                                                                                                                                             RUNOFF
             FENCES SHOULD BE LOCATED CONTINUOUSLY ALONG CONTOURS AND SHOULD                                                                                                                           1m (MAX.) ON                                                                                                 FORMED TOP WIDTH                                                                                  CATCH DRAIN CONSTRUCTION
             TREAT AREAS LESS THAN 0.6 HA. PER 100M OF SILT FENCE.                                                                                                                                     PUBLIC ROADS                                                                                                                                                                                                   NOTES
         ·   WEEKLY INSPECTION AND MAINTENANCE OF SILT FENCES, SEDIMENT BASINS                                                                                                                                                                                                                                                                                                                                        1.      EXCAVATE THE DIVERSION CHANNEL
                                                                                                                                                                                                                                                                                                                             150mm                                     2 (MIN.)
             AND OTHER EROSION CONTROL MEASURES. CHECK FENCES AFTER RAINFALL                                                                                                                                                                                                                                                                                                                                                  REMOVING ALL DEBRIS
                                                                                                                                                                                                                                                                                                                              (MIN.)
             EVENTS AND REMOVE COLLECTED MATERIAL WHEN FENCE IS 50% FULL.                                                                                                                                                                                                                                                                                                                                             2.      ENSURE THE DRAIN INVERT MUST FALL
                                                                                                                                                                       BYPASS                                                                                                                                                                                                     1
             REPLACEMENT OF ANY DAMAGED EQUIPMENT SHOULD BE PERFORMED                                                                                                                                                                                                                                                                                                                                                         10cm EVERY 10m FOR EACH 1% OF
                                                                                                                                                                       FLOW
             IMMEDIATELY.                                                                                                                                                                                                                                                                                                                                                                                                     CHANNEL GRADIENT
         ·   RETAIN SITE VEGETATION WHERE POSSIBLE AND SUITABLE.                                                                                                                                                                                                                                                                                                                                                      3.      ENSURE THE SIDES OF THE CUT DRAIN
         ·   PROGRESSIVE RE-VEGETATION OF CUT AND FILL AREAS AND FILL BATTERS WITH                                                  (A) ON-GRADE KERB INLET SEDIMENT TRAP
                                                                                                                                                                                                                                                                                                                                                                                                                              ARE NO STEEPER THAN 1.5:1 (H:V) SLOPE
             TWO GRASS SPECIES IF SEEDING.                                                                                                                                                                                                                                                                                                                                                                                    AND TEH EMBANKMENT FILL SLOPES ARE
         ·   MULCHING AND RETENTION OF VEGETATION AND TOPSOIL FOR FINAL SITE                                                                                                                                                                                                                                                                                                                                                  NO STEEPER THAN 2:1
             REHABILITATION AND LANDSCAPING WORKS.                                                                                                                                                                                                                                                                                                                                                                    4.      ENSURE THE DRAIN DISCHARGES TO A
         ·   AIM FOR 60% COVERAGE WITHIN 20 DAYS AND 70% WITHIN 6 WEEKS                                                                                                                                                                                                                                                   NON-DISPERSIVE SUBSOIL
                                                                                                                                                                                                        FILTER SOCKS MAY NEED TO FULLY SURROUND THE INLET TO                                                                                                                                                                  STABLE OUTLET
         ·   RE-VEGETATION AND LANDSCAPING OF REMAINING EXPOSED AREAS USING THE                                                                                                                         INTERCEPT SEDIMENT RUNOFF FROM THE ROAD AND VERGE                                                                                                                                                             5.      IF GEOTEXTILE LINED FOLLOW THE
             TOPSOIL AND ANY MULCHED VEGETATION RETAINED FROM INITIAL SITE                                                      PVC PIPE                                                                                                                                                                                                                                                                                      METHOD OD INTSALLATION PROCEDURES
             CLEARING. VEGETATION SHOULD BE WATERED AND MAINTAINED UNTIL IT IS                                                  SPACERS                                                                                                                                                       (A) PARABOLIC CATCH DRAIN WITH DOWN-SLOPE BANK                                                                                  PROVIDED BY THE MANUFACTURER OR
             SUITABLY ESTABLISHED.                                                                                                                                                                                                                                                                                                                                                                                            DISTRIBUTOR OF THE PRODUCT.
         ·   IF LANDSCAPING IS REQUIRED SPECIES TO BE USED SHOULD PREFERABLY BE                                                                                                                                                                                                                                                                                                                                       6.      INSPECT THE DIVERSION CHANNEL
             NATIVE AND ENDEMIC TO THE AREA. REMOVAL/MANAGEMENT OF WEEDS.                                                                                                                                                                                                                                                                                                                                                     WEEKLY AND AFTER ANY INCREASE OF
       PERFORMANCE INDICATORS                                                                                                                                                                                                                                                      RUNOFF                                                                                                                                     FLOWS OR RAIN EVENTS. REPAIR ANY
                                                                                                                                                                                                                                                                                                                FORMED TOP WIDTH                                                                                              SLUMPS, WHEEL TRACK DAMAGE OR
       THE SITE FOREMAN WILL CARRY OUT REGULAR CHECKS OF THE ONSITE SEDIMENT AND
                                                                                                                                                                                                                                                                                                                                                                                                                              LOSS OFF FREEBOARD
       EROSION CONTROL MEASURES DURING CONSTRUCTION AND AFTER EVERY RAINFALL
                                                                                                                                                                                                                                                                                                                                                                                                                      7.      ON COMPLETION OF THE CONSTRUCTION
       EVENT. THE CHECKS WILL INCLUDE THE FOLLOWING:                                                                                                                                                                                                                                                                                                                  2 (MIN.)                                                WORK, REMOVE THE TEMPORARY
          ·    EROSION AND SEDIMENT FLOWS CHECKED AT THE BASE OF EMBANKMENTS.                                                                                                                                                                                                                                                 150mm
                                                                                                                                                                                                                                                                                                                                                                                                                              DIVERSION CHANNEL. THE AREA IS TO BE
          ·    NO VISIBLE EVIDENCE OF INCREASED TURBIDITY DIRECTLY ATTRIBUTED TO                                                                                                                                                                                                                                               (MIN.)                                             1                                           STABILISED AND REHABILITED
               CONSTRUCTION ACTIVITIES.                                                                                                                                                                                                                                                                                                                                                                                       APPROPRIATELY.
          ·    NO VISUAL EVIDENCE OF SCOURING.                                                                                          FILTER SOCK
          ·    CONSTRUCTED CHECK DAMS TO BE INSPECTED DURING RAINFALL EVENTS TO
               ENSURE THEY ARE OPERATING CORRECTLY.                                                                                                  GULLY GRATE WRAPPED IN NON-WOVEN                                            SIDE INLET REMAINS
                                                                                                                                                     FILTER FABRIC (MINIMUM, BIDIM A34 OR                                        OPEN
       FREQUENCY/DEADLINE                                                                                                                            EQUIVALENT)
            ·        MATERIAL STOCKPILES WILL BE INSPECTED REGULARLY TO CONFIRM THEIR
                     LOCATION IS NOT RESULTING IN THE GENERATION AND UNCONTROLLED                                                                                                                                                                                                                                 NON-DISPERSIVE SUBSOIL
                     TRANSPORT OF SEDIMENT.                                                                                                                              (B) SAG INLET SEDIMENT TRAP
            ·        INSPECTION OF EROSION AND SEDIMENT CONTROL MEASURES AND
                     STRUCTURES TO BE UNDERTAKEN AFTER EACH RAINFALL EVENT.                                                                                          KERB INLET SEDIMENT TRAPS                                                                                                     (B) TRIANGULAR V-DRAIN WITH DOWN-SLOPE BANK
            ·        IF AREAS ARE BEING RE-VEGETATED FOLLOWING COMPLETION OF
                     CONSTRUCTION, THESE AREAS WILL BE INSPECTED WEEKLY TO CONFIRM THAT                                                                                                                                                                                                                                                                                                                                        Check all dimensions before commencement of work.
                     VEGETATION IS BECOMING ESTABLISHED.                                                                                                                                                                                                                                                                                                                                                                       Check Site boundary dimensions from the Title plans
                                                                                                                                                                                                                                                                                                                                                                                                                               Check Building Boundary clearances by set out.
       REPORTING AND REVIEW                                                                                                                                                                                                                                                                                                                                                                                                    Notwithstanding the information supplied on this drawing,
       RESULTS OF INSPECTIONS WILL BE REPORTED AS PART OF THE DEVELOPERS REGULAR                                                                                                                                                                                                                                                                                                                                               the location, depth and extent of underground or overhead
       REPORTS TO THE NOOSA SHIRE COUNCIL SITE INSPECTOR.                                                                                                                                                                                                                                                                                                                                                                      services are to be confirmed and protected on site by the
                                                                                                                                                                                                                                                                                                                                                                                                                               contractor prior to commencement of works.
                                                                                                                                                          Approved
Checked -       CT
                                                                                                                                Consulting Civil &                                                                    Drawing title -                                          Project -    COMMUNITY AFFORDABLE                               Site -                                                                        Project No.     233467 Sheet No.                    C142
Design -    SK            Drawn -   SK                                                                                          Structural Engineers                                                                  EROSION & SEDIMENT CONTROL                                            HOUSING DEVELOPMENT                                62 LAKE MACDONALD DRIVE,                                                      Digital Ref :
                                                                                                                                                                                                                                                                                                                                                                                                                                             C142 EROSION & SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                                                                             CONTROL DETAILS           Issue :       A
Scales -    AS SHOWN                                                                                                            Project Management        124 DUPORTH AVENUE             Ph (07) 5443 7777            DETAILS                                                  Client -
                                                                                                                                                                                                                                                                                            NOOSA COUNCIL                                      COOROY                                                                         This Document is copyright and shall not be copied
                                                                                                          ASSOCIATES PTY LTD                              PO BOX 16                      Fax (07) 5443 7577                                                                                                                                                                                                                   without written approval, nor shall it be used except
  Document Stage -            APPROVAL
                                                A   10/01/24   ISSUE FOR CLIENT REVIEW               SK
                                                                                                                                & Planning                MAROOCHYDORE QLD 4558
                                                                                                                                                                                                                                                                                                                                                                                                                                  for the Development and the Site Specified.
                                               Issue Date                    Description            By                                                    E-MAIL: [email protected]
       c:\12dS\data\12DSERVER\233467_2957\DWG Covey\OPW\Uncontrolled\C142 EROSION & SEDIMENT CONTROL DETAILS.dwg                                                                                                                                                                                                                                                                                                             Plot 7 June 2024 - 11:05 AM

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H Traffic Impact Assessment.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.