Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Appendix H Traffic Impact Assessment · RAL25/0004

of 59

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (13.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 6, section 1. The text section number identifies this passage in the reader.

3.0 Traffic generation of the proposed development

It is understood that the development could comprise up to 100 dwellings. With the site having an area
of approximately 2ha excluding the proposed access road (Road 1), it has been reasonably assumed
that if there are to be 100 dwellings that they could comprise a townhouse style product, rather than
detached dwellings on separate individual allotments.

In that context, it has been assumed that the dwellings of the development would generate peak hour
traffic flows at a rate of 0.6 vph per dwellings, noting that NSW RMS Guide to Traffic Generating
Developments recommends a medium density traffic generation rate of 0.5-0.65vph per dwelling for
townhouses having 3 or more bedrooms.

In terms of the distribution of that generated traffic to the network, the following reasonable assumptions
have been made:
     (a) Peak hour traffic flows would have a 70/30 split during peak hour periods, with 70% of traffic
         departing and 30% returning during the AM peak, and vice versa in the PM peak.

    (b) 75% of site generated traffic would be oriented toward the west along Lake MacDonald Drive
        (to/from the Elm St intersection) and 25% oriented toward the east (for travel to/from the areas of
        Noosa further east).

    (c) Of the traffic oriented toward the Elm St intersection, it is assumed that 25% would travel to/from
        the north along Elm St, and 75% would travel to/from the south along Elm St.

The assignment of site generated traffic flows to the road network estimated on the above basis, is
shown in Figure 6.




Figure 6: Predicted peak hour traffic flows generated by the proposed development


24.s.70.1                                          Page - 6

Used in these records

About this file

File size
13.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix H Traffic Impact Assessment.pdf · 13.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.