NO. ITEM PRODUCT DESCRIPTION FINISH SUPPLIER OPW23/0179 4 APR 2024
7.12 PLANTER TYPE 15. PLANTER TYPE 15. (P15) PLANTER DEPTH: TYPICALLY 400MM DEPTH. ALL PLANTER FINISH LEVELS TO BE 50MM SET FYTOGREEN
CONTAINERISED INTENSIVE. CONTAINERISED PLANTER 400MM DOWN FROM TOP OF ADJOINING PLANTER WALLS AND GLAZING FRAMES. CONTACT OFFICE:
(P15). DEPTH. BUILDING STRUCTURE **DEPTHS AND WEIGHTS TO BE APPROVED BY PROJECT ENGINEER** GEOFF HEARD
CONTAINED. 1300 182 341
PLANTER PROFILE (TOP TO BOTTOM): 50MM DEPTH PEBBLE MULCH 15MM NAMBUCCA CONTACT SITE: MIKE HEARD
PEBBLE MULCH TO AS4454 SAMPLE MUST BE APPROVED BY LANDSCAPE ARCHITECT PRIOR 0417622228
TO INSTALL, (REMAINING DEPTH) HYDROCELL 40 PODIUM MIX MOUNDED AS DETAILED
ABOVE, A24 GEOTEXTILE TO BASE AND MINIMUM 200MM UP WALLS, 60MM HYDROCELL RG30 MEDIA
FOAM LAYER TO BASE, 20MM DRAINAGE CELL TO BASE AND 2.5MM CORFLUTE SHEET NUGROW
PROTECTION TO WATERPROOFING MEMBRANE ON BASE AND WALLS UP TO FINISHED CONTACT: KANE HAUSER
MEDIA LEVEL. WATERPROOFING MEMBRANE TO ARCHITECT'S SPECIFICATION. IRRIGATION: PH: 3294 1586
AUTOMATED IRRIGATION SYSTEM CONNECTED TO WATER SUPPLY WITH CENTRAL
CONTROLLER WITH DAILY BACK TO BASE MONITORING. REFER TO PLANTER IRRIGATION
ITEM DETAIL FOR ALL PLANTERS. DRAINAGE: ALL CONTAINERISED PLANTERS TO HAVE
DRAINAGE ALLOCATIONS WITHIN THE BUILDING STRUCTURE AT REGULAR INTERVALS TO
HYDRAULIC ENGINEER'S SPECIFICATION. DRAINAGE SUMP OUTLETS TO HAVE SPS TRUFLO
100MM WITH ALL-PURPOSE PLANTER BOX ADAPTOR, FITTED WITH SLOTTED 100MM PVC
PIPE WITH SCREW ON CAP, PIPE SHOULD BE WRAPPED IN GEOFABRIC. REFER TO TYPICAL
DETAILS FOR FURTHER DETAIL. FOR PLANT TYPES REFER SYMBOLS TO PLANTING
SCHEDULE.
PLANTER TYPE 16. PLANTER TYPE 16. (P16) PLANTER DEPTH: TYPICALLY 400MM DEPTH. ALL PLANTER FINISH LEVELS TO BE 50MM SET FYTOGREEN
7.13
CONTAINERISED INTENSIVE. CONTAINERISED PLANTER 400MM DOWN FROM TOP OF ADJOINING PLANTER WALLS AND GLAZING FRAMES. CONTACT OFFICE:
(P16). DEPTH. BUILDING STRUCTURE **DEPTHS AND WEIGHTS TO BE APPROVED BY PROJECT ENGINEER** GEOFF HEARD
CONTAINED. 1300 182 341
PLANTER PROFILE (TOP TO BOTTOM): 50MM DEPTH PEBBLE MULCH 15MM NAMBUCCA CONTACT SITE: MIKE HEARD
PEBBLE MULCH TO AS4454 SAMPLE MUST BE APPROVED BY LANDSCAPE ARCHITECT PRIOR 0417622228
TO INSTALL, (REMAINING DEPTH) HYDROCELL 40 PODIUM MIX MOUNDED AS DETAILED
ABOVE, A24 GEOTEXTILE TO BASE AND MINIMUM 200MM UP WALLS, 60MM HYDROCELL RG30 MEDIA
FOAM LAYER TO BASE, 20MM DRAINAGE CELL TO BASE AND 2.5MM CORFLUTE SHEET NUGROW
PROTECTION TO WATERPROOFING MEMBRANE ON BASE AND WALLS UP TO FINISHED CONTACT: KANE HAUSER
MEDIA LEVEL. WATERPROOFING MEMBRANE TO ARCHITECT'S SPECIFICATION. IRRIGATION: PH: 3294 1586
AUTOMATED IRRIGATION SYSTEM CONNECTED TO WATER SUPPLY WITH CENTRAL
CONTROLLER WITH DAILY BACK TO BASE MONITORING. REFER TO PLANTER IRRIGATION
ITEM DETAIL FOR ALL PLANTERS. DRAINAGE: ALL CONTAINERISED PLANTERS TO HAVE
DRAINAGE ALLOCATIONS WITHIN THE BUILDING STRUCTURE AT REGULAR INTERVALS TO
HYDRAULIC ENGINEER'S SPECIFICATION. DRAINAGE SUMP OUTLETS TO HAVE SPS TRUFLO
100MM WITH ALL-PURPOSE PLANTER BOX ADAPTOR, FITTED WITH SLOTTED 100MM PVC
PIPE WITH SCREW ON CAP, PIPE SHOULD BE WRAPPED IN GEOFABRIC. REFER TO TYPICAL
DETAILS FOR FURTHER DETAIL. FOR PLANT TYPES REFER SYMBOLS TO PLANTING
SCHEDULE.
7.14 PLANTER TYPE 17. PLANTER TYPE 17. (P17) PLANTER DEPTH: TYPICALLY 400MM DEPTH. ALL PLANTER FINISH LEVELS TO BE 50MM SETFYTOGREEN
CONTAINERISED INTENSIVE. CONTAINERISED PLANTER 400MM DOWN FROM TOP OF ADJOINING PLANTER WALLS AND GLAZING FRAMES. CONTACT OFFICE:
(P17). DEPTH. BUILDING STRUCTURE **DEPTHS AND WEIGHTS TO BE APPROVED BY PROJECT ENGINEER** GEOFF HEARD
CONTAINED. 1300 182 341
PLANTER PROFILE (TOP TO BOTTOM): 50MM DEPTH PEBBLE MULCH 15MM NAMBUCCA CONTACT SITE: MIKE HEARD
PEBBLE MULCH TO AS4454 SAMPLE MUST BE APPROVED BY LANDSCAPE ARCHITECT PRIOR 0417622228
TO INSTALL, (REMAINING DEPTH) HYDROCELL 40 PODIUM MIX MOUNDED AS DETAILED
ABOVE, A24 GEOTEXTILE TO BASE AND MINIMUM 200MM UP WALLS, 60MM HYDROCELL RG30 MEDIA
FOAM LAYER TO BASE, 20MM DRAINAGE CELL TO BASE AND 2.5MM CORFLUTE SHEET NUGROW
PROTECTION TO WATERPROOFING MEMBRANE ON BASE AND WALLS UP TO FINISHED CONTACT: KANE HAUSER
MEDIA LEVEL. WATERPROOFING MEMBRANE TO ARCHITECT'S SPECIFICATION. IRRIGATION: PH: 3294 1586
AUTOMATED IRRIGATION SYSTEM CONNECTED TO WATER SUPPLY WITH CENTRAL
CONTROLLER WITH DAILY BACK TO BASE MONITORING. REFER TO PLANTER IRRIGATION
ITEM DETAIL FOR ALL PLANTERS. DRAINAGE: ALL CONTAINERISED PLANTERS TO HAVE
DRAINAGE ALLOCATIONS WITHIN THE BUILDING STRUCTURE AT REGULAR INTERVALS TO
HYDRAULIC ENGINEER'S SPECIFICATION. DRAINAGE SUMP OUTLETS TO HAVE SPS TRUFLO
100MM WITH ALL-PURPOSE PLANTER BOX ADAPTOR, FITTED WITH SLOTTED 100MM PVC
PIPE WITH SCREW ON CAP, PIPE SHOULD BE WRAPPED IN GEOFABRIC. REFER TO TYPICAL
DETAILS FOR FURTHER DETAIL. FOR PLANT TYPES REFER SYMBOLS TO PLANTING
FOR OPERATIONAL WORKS APPROVAL
SCHEDULE.
7.15 PLANTER IRRIGATION. PLANTER IRRIGATION. PLANTER IRRIGATION: IRRIGATION TO BE DESIGNED AND INSTALLED BY SUITABLY
(P4-17). (P4-17). QUALIFIED PERSON TO THE APPROPRIATE STANDARDS. THE IRRIGATION SUPPLY LINE TO
BE DEDICATED TO GARDEN IRRIGATION ONLY NO SUPPLEMENTARY TAPS TO BE FITTED.
AUTOMATIC IRRIGATION TO ALL ALL CONTAINERISED THE IRRIGATION CONTROLLER TO BE AUTOMATED WITH REMOTE MONITORING CAPACITY
CONTAINERISED PLANTERS. PLANTERS TO HAVE AND LINKED TO PULSE FLOW METER. AUTOMATED IRRIGATION SYSTEM CONNECTED TO
ELECTRICITY AND PLUMBING RAIN WATER HARVESTED RESERVOIR TO HYDRAULIC ENGINEER'S SPECIFICATION.
BUILDER TO INSTALL SUITABLE CONDUITS. MINIMUM SUPPLY PRESSURE OF 400KPA. EACH ZONE TO BE PRESSURE REDUCED AT THE
CONDUITS FOR PLUMBING WATER BY BUILDER AND LANDSCAPE SOLENOID. ALL PRESSURE REDUCING AND SOLENOID VALVES TO BE LOCATED AND
SUPPLY (TYPICALLY 20MM PEX CONTRACTOR. CONTAINED WITHIN APPROPRIATE VALVE BOX AT EACH SEPERATE PLANTER ZONE WITH
POLYETHYLENE) AND ELECTRICITY CONDUIT AND DATA CABLE BACK TO CONTROLLER FOR ACTIVATING THE SOLENOID.
CABLE FOR CONTROLLER TO EACH REFER TO PLAN FOR SOLENOID LOCATIONS MARKED (SL) TO BE AT RISER CONNECTION.
GARDEN BED AND TURF AREA. EACH PLANTER TO HAVE WATER TAKE OFFS VIA CENTRAL CONTROLLER WITH DAILY BACK
TO BASE MONITORING. EACH WITH 25MM RISER AND LATERALLY AT EACH LEVEL 20MM
BUILDER AND LANDSCAPE ALL IRRIGATION LINES TO BE WITH BSP THREAD TO EACH PLANTER REDUCED TO 13MM AND SUB SOIL DRIP LINES TYPE:
CONTRACTOR TO CONFIRM MINIMUM OF 300MM DEEP. TECHLINE XR OR SIMILAR APPROVED AT 300MM CENTRES LINKED BACK TO BACK. PIPE
SUITABLE CONDUITS ARE SIZING SHOULD REFLECT THE FLOW RATE BY ZONE AND TERMINATE IN THE PLANTER
INSTALLED TO ALL GARDEN BEDS WITH A 20MM BSP THREAD. CONTROLLER TO HAVE BACK FLOW PREVENTION, INLINE
FROM GPO HEAD UNIT FOR CABLE FILTERS, FLOW SENSORS, MASTER VALVES, SHUT OFF VALVES ON EACH BANK OF VALVES
TO CONTROLLERS AND PIPE FOR AND WATER METER. CONTROLLER TO BE LOCATED AT LOCATION SHOWN ON PLAN TO BE
WATER SUPPLY TO EACH GARDEN APPROVED BY HYDRAULIC ENGINEER. IRRIGATION SYSTEM TO BE DESIGNED AND
BED AND TURF AREA. ALL INSTALLED BY SUITABLY QUALIFIED PERSON. IRRIGATION SYSTEMS TO HAVE A MINIMUM
CONNECTIONS TO BE CONCEALED. OF ATLEAST INDUSTRY STANDARD WARRANTIES TO BE ISSUED TO THE SUPERINTENDANT
PRIOR TO COMPLETION SIGN OFF. IRRIGATION SYSTEM TO HAVE CLOUD CAPABILITIES
AND BE PROGRAMMED TO WORK WITH LOCAL WEATHER STATIONS TO SWITCH OFF
DURING RAIN AND CERTAIN WEATHER EVENTS SUCH AS HIGH WIND. PLUMBING THROUGH
BUILDING TO BE INSTALLED BY BUILDER.
POOL AND POND.
8.1 PROPOSED POOLS, TUBS AND POND. TO ARCHITECTS SPECIFICATION. NA
(H1-3).
NOT FOR CONSTRUCTION
THE BUILDER / CONTRACTOR SHALL VERIFY JOB DIMENSIONS PRIOR TO ANY WORK COMMENCING. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED WORK.
CONLON DATE ISS DESCRIPTION
19.02.24 B FOR OPERATIONAL WORKS
CHKD CLIENT
MC
NOOSA RIVER HOUSES
PROJECT
128 GYMPIE TERRACE,
LANDSCAPE DOCUMENTATION PACKAGE
SCHEDULE OF FINISHES
PROJECT. NO.
578
DWG. NO. ISSUE
LP004 B
APPROVAL
GROUP 08.02.24 A MC SCALE
FOR COORDINATION
NOOSAVILLE, QUEENSLAND
P 07 5338 8690 E [email protected] © COPYRIGHT THIS DRAWING IS COPYRIGHT AND THE PROPERTY OF CONLON GROUP PTY. LTD. AND MUST NOT BE RETAINED, COPIED/REPRODUCED OR USED WITHOUT WRITTEN AUTHORITY.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans OPW23/0179.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.