Original source · versioned page text
Attachment 2 - Landscape Plans
Plans and drawings: the text below has words only, no drawings.
4 VENTURA STREET, SUNRISE BEACH Landscape Plan Package Drawing Schedule · Cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan prescribed 4.0 Planting 5.0 Maintenance Tasks proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater New Gardens · Maintain whole of landscape works for establishment period of 13 weeks or as in agreement LD1 Drawing Schedule, Specifications than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. · See 1.0 Topsoil for cultivation and topsoil requirements. with Owner. LD2 Finishes and Planting Schedules · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall · Spread ameliorated site topsoil or AS 4419 imported organic topsoil to a depth of 300mm Irrigation and Watering percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades over prepared garden areas and trim. · Every day for the first two weeks (unless it rains adequately) LD3 Details providing a natural appearance with no abrupt edges. Trim topsoils for gardens and turfing 2% · Crown garden beds 100mm H at centres to drain positively. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry LP1 Planting Plan - Ground minimum slope away from all structures to pits or swales. · Mulch gardens with LA approved AS 4454 imported organic mulch as specified 100mm deep (unless it rains adequately). LP2 Planting Plan - Level 1 settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched · Once a week there after. 2.0 Landscape Construction areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · If turf sprinklers are installed, check turf rotor head radius once per month to ensure spray Landscape Specifications · All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds head layout provides head to head coverage - adjust as required. Levels (specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. Mowing These landscape plans must be read in conjunction with the appropriate statutory approvals and · See plan for engineer's plan levels and proposed levels. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation and/or Australian Standards and with the Operational Works Landscaping Decision Notice once issued. · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a Tree Planting 50mm high. Do not remove more than 31 of grass height at any one time. These plans have been developed to comply with Council's Planning Scheme-Landscape Code. discrepancy occurs notify superintendent and/or LA. · Refer to street tree and tree planting details (as applicable) for information. · Mowing Thereafter - 40mm H remaining 11 weeks then 25mm thereafter. Mow once a week · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. · All trees to be certified to AS 2303:2018 'Tree stock for landscape use' and comply with this during summer, once every two weeks in spring and autumn, and once a month in winter or as 1.0 General Notes · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage specification. required if there is a lot of growth or as desired. and no ponding areas. · Landscape contractor to peg street tree positions for approval by superintendent before Topdressing Abbreviations · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled excavation. · When lawn areas have become established, and immediately after the first cut, top-dress lawn · AS - Australian Standards · DBH - Diameter at breast height (1.4m) turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between · All trees to have a full and even crown. lightly to a depth of 10mm with a light sandy loam-based topsoil. Rub the dressing well into the · EP - Establishment Period · HD - Hot Dipped design and finish levels. · Install trees at locations indicated on the plans, per notes and details herein. joints and correct any unevenness in the turf surface. Topdressing is not to be carried out · LA - Landscape Architect · MP - Maintenance Period · Co-ordinate establishment of levels with superintendent. · Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified during the winter months. · MPA - Megapascals · m² - square metre · m³ - cubic metre 100mm deep settled. Do not mulch within 50mm of trunk / plant stem. Weed Removal: As required to reduce competition and seeding. · NATA - National Association of Testing Authorities · N/A - Not applicable Drainage · Edge trees per details. Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen, · O.C. - On centre · S - Spread · All damaged stormwater pipes are replaced and relocated as necessary. · Tree staking - per details. with plants of the same species and of similar size and quality unless otherwise specified. · NC - Noosa Council · typ. - Typical · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · All trees to be located minimum; Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and · uPVC- Unplasticised Polyvinyl Chloride · VPZ - Vegetation Protection Zone buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before - 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing guying when instructed by the superintendent. continuing works. for service setbacks) or as dimensioned on plans Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are · These plans are not for tender or construction. There are no existing trees to be removed. · Drainage works to correlate with and not disturb adjacent land. - 1500mm from concrete paths and pavement profiles and property connections established or Off-maintenance respectively. · See legend for plan symbols and plans for locations. - 2m from services, horizontally and vertically from sewer lines, stormwater catch pits, Monitoring: Provide a monthly report on completed tasks. Preliminaries · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped underground services (confirm locations on-site prior to pit excavation) and stormwater · Refer to plans by others for all services locations, footpath works, levels (other than those galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements pipes Warranties indicated on these plans) and boundaries. All services and related infrastructure including on-site in addition to those on plans. - 3m from fire hydrants, driveway crossovers, adjoining, new, or perpendicular lot · Warranties or guarantees specified shall name the Owner as warrantee. Register with street lighting shown on these plans are indicative only. · All drainage pits and subsurface drains to be connected to existing stormwater drainage boundaries manufacturers as necessary. Retain copies delivered with and components and equipment to · Call 'Dial Before You Dig 11 00' prior to any excavation. system. Refer engineer's drawings for drains and hydraulic services. - 4m from powerpoles the Owner. · Before work commences the subcontractor is to organise a pre-start meeting with the LA to · Stormwater drainage to be Ø100mm minimum uPVC SN8 AS 1260.2017 solid drainage pipe. - 6m from street lights · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within establish scope of works management procedures and clarify any issues. · Subsurface drainage to be Ø100mm minimum black slotted HDPE AS2439.1 pipe centred in fourteen (14) days after practical completion. · Install tree protection measures as per plans and detail. 300mm x 300mm gravel trench. Gravel to be Ø6 - 10mm No-fines aggregates surrounded by General Planting · Commence Warranty periods at practical completion or at acceptance of installation, if · Prior to commencing construction works, verify dimensions, levels and location of site LA approved permeable bidim or geotextile fabric. See Detail(s) for more information. · Refer to detail(s) herein respectively. acceptance is not concurrent with practical completion. services, refer engineer's drawings generally. · Furnish and install 1m³ of Ø75mm - 150mm washed, sound, rounded Mary River · Supply and place plants according to plant schedule, plant setout notes and plan locations. · If installation is not by manufacturer and product warranty is conditional on the manufacturer's · Dimensions take precedence over scale. gravel cobbles / spalls over pinned permeable geo-fabric at all new landscape drainage · Where discrepancies occur advise superintendent prior to planting. approval of the installer, submit the manufacturer's written approval of the installing firm. · Contractor to review all schedules herein to confirm their correlation to these plans. Where daylight points. · Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated discrepancies occur within landscape documentation refer to LA prior to provision of tender · Where and if additional drainage is required the following applies: on plans. Deliverables pricing and/or construction. - Allow for seepage interception sub-surface drainage where paths and landscape works · Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups · Warranties impede drainage (to be coordinated on site). to achieve optimum cover related to mature plant size and form. · Irrigation System As-built plans in .dwg and PDF formats Erosion and Sediment Control - Allow for 300mm x 300mm gravel trench with Ag-line under path, discharge to natural · Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs, · The landscape contractor to implement and maintain for the contract duration, best practice drainage lines. garden edges and paths to allow for mature plant form. Confirm with LA which require more Certifications erosion and sediment control measures in accordance with the manual for erosion and - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side distance. Furnish LA with the following certifications as applicable prior to Practical Completion: sediment control (Maroon Manual), good environmental practice and the consulting civil of low point. · All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate · NATA accredited lab existing topsoil testing results and amelioration recommendations. engineer's specification for erosion and sediment control. Penalties and fines for of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock. Landscape Contractor certification that existing site topsoils have been ameliorated per non-compliance will apply. Fencing Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons. recommendations. · Install silt control fencing in accordance with site environmental management plan and local · Supply and construct fencing per plans, details, and Finishes Schedule. · Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls. · AS 2303:2018 Tree Stock for Landscape Use authority regulations. · Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours, · AS 3743 Potting Mixes · Sediment and erosion control devices to be installed where necessary and as directed on site Edging notify superintendent and correct drainage. · AS 4419 Topsoil by superintendent. · Supply, install, and maintain edges as specified and shown on the plans and details and · Soak plants thoroughly before removing from container. · AS 4454 Mulch · All sediment and erosion control devices are to be installed in accordance with manufacturer's Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie · Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted · Turf specifications. off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. and coiled roots to expose young roots. All stock to be free of structural defects above and · The contractor is responsible for ensuring sediment and erosion control devices are inspected below soil line (i.e. no girdled roots). Sources and maintained as follows; 3.0 Irrigation - If Installed · Do not mix soil from hole with mulch and do not compact plant pit. · Survey: via engineer a) During construction: Daily during dry weather, prior to predicted storm events, twice · Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported · Architecture: ICON daily during prolonged rain Preliminaries AS 4419 topsoil and AS 3743 Potting Mixes respectively. · Civil Engineering: Ingeniir b) During establishment period: Weekly during dry weather, prior to predicted storm · Liaise with relevant Noosa Council authorities and obtain any approval as required. · Water plant in well and maintain soil moisture levels through EP. events, twice weekly during prolonged rain · Comply with government standards and co-ordinate with other trades.· · All stockpiles are to be protected with suitable erosion control devices and graded to ensure · Check locations of penetration/conduits and install where required. Tube Stock Planting control of runoff. · Contractor to provide qualifications and insurances before construction. · Remove all weeds from planting areas. Level and trim per engineer's plans. · Coordinate installation of sediment and erosion control devices with civil contractor to ensure · Irrigation system is a 'Design + Build' system. · Planting areas to be decompacted and cultivated 150mm deep. compatibility and consistency in control measures. · Install topsoil per specifications. · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. Provide: · Install plants per plant schedule densities, specifications, and details. · Supply and install a new: Automatic electronic controller with a lockable stainless steel case, Site Works rain sensor, backflow preventer per Council standards with a stainless steel enclosure, New Turfed Areas · Remove all unwanted material, deleterious and operational debris from site. isolation valves, pressure regulator(s) as required, Toro System control valves for drip, check · See 1.0 Topsoil for cultivation and topsoil requirements. · If provided levels are not functional refer to the site superintendent and/or LA. valves, black plastic valve boxes, looped mainline, thrust blocks (as required), fittings, and drip · Trim topsoil, fill depressions and provide even falls as indicated on drawings. · Civil engineering designs have provided a positively drained site. If there are drainage issues lines and emitters for gardens. If sprinklers are installed for turf areas (i.e. overhead spray), · Finished turf grades/contours shall be smooth and undulating, free from deleterious materials, refer site superintendent. sprinklers / rotors shall be Hunter or LA approved equal. debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and · Refer to 2.0 Landscape Construction - Drainage for more information. · Turf area irrigation to have head to head coverage and no overspray onto hard surfaces. no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to Check head radius once per month to ensure spray head layout provides head to head laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow Conduits coverage. unimpeded over laid turf to low area respectively. · Furnish and install 2 - 150mmØ solid A.S. 1260:2017 uPVC SN8 or SN10 piping · Install uPVC conduits, 2xØ of pipe used, under all hard surfaces prior to hard surface · Supply and lay 'A' grade turf per plans and schedules. perpendicularly under all footpaths that bisect landscape areas for irrigation and landscape construction. Extend ends of conduits 300mm beyond surfaces, cap (do not glue caps to · Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is drainage purposes. Extend ends 300mm beyond paths, each side and cap (do not glue caps). conduits) and install used survey pegs at ends for reference. well established. Mark and install recycled surveyor's pegs at end caps for identification. · All valve boxes to be located in gardens (not in turf or swales) 300mm from and perpendicular · Water turf in well and apply water to maintain soil moisture until established. to surfaces. Topsoil - Harvesting, Stockpiling, Amelioration, Re-use and Spreading · All mainlines to have 450mm of topsoil cover and 300mm for lateral lines. · Harvested and stockpiled site topsoils if practical and reinstall per the following specifications · Align all mainlines and lateral lines 1m from all trees and in close approximation to new paths in respective landscaping areas. / hard surfaces as possible. · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of · Do not irrigate road reserve areas. preserved vegetation driplines. · For practical completion ensure whole system is operational. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer · Irrigate plants and turf ensuring adequate plant moisture is maintained during establishment. or owner which will not hinder visibility for inspection of the work. · Adjust system post establishment so it operates during dry and hot periods so plants and turf · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with areas are adequately watered to maintain healthy and vibrant conditions. results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape · Contractor to provide a twelve month guarantee, maintain against faulty workmanship and contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted materials for system from date of practical completion. by a NATA accredited lab. · Provide CAD 'As-built' drawing and PDF of same to Owner and a laminated copy in the · Should amended site topsoils be insufficient in quantity, contractor to import AS 4419 topsoil controller door for reference when applying for practical completion clearly showing main-line and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have runs and sizes, valve types / station numbers / valve design pressure, head types and soils analyses test as per above. Amend Imported soils per test results prior to spreading. locations. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Job No: 2543 Proposed Townhome Development Landscape Architecture Urban Design Land Planning Bird Landscape Design is strictly prohibited. 4 Ventura Street, Sunrise Beach, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia 13.6.25 C For Application BB BB Do not scale from PDF plans. M: +614 7705 5222 13.6.25 B For Application BB BB LD1 Drawing Schedule, Specifications E: [email protected] 11.6.25 A For Application BB BB Sheet Title Sheet 1 of 5 Client: Alex Comino W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Finishes Schedule Planting Schedule
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer Code GENUS species - Common Name Size Quantity Notes
Hardscape Shrubs
STE Garden Edge Steel Garden Edging 'FormBoss' 'Redcor', 150mm H x 2mm gauge including tapered 300mm stakes. Install per manufacturer's Formboss, local representative: ALO bri ALOCASIA brisbanensis - Cunjevoi 200mm 3
specifications. Refer to Specifications and Detail. Set edging 25mm into property when adjacent to road Tranquil Building and
reserve boundary. Landscapes BAC myr BACKHOUSIA myrtifolia - Grey Myrtle 200mm 3
07 5497 8774
BAN rob BANKSIA robur - Swamp Banksia 200mm 7
Garden Steppers Concrete Garden Steppers Size: 400mm x 600mm x 40mm H Nominated by contractor and
Colour: To match primary architectural colour approved by superintendent COR rub CORDYLINE 'Rubra' 200mm 6
Finish: Set level over 95% compacted subgrade, flush to finish grades with adjacent gravel surfaces 10mm lower.
SYZ hin SYZYGIUM australe 'Hinterland Gold' 200mm 7
Softscape
SYZ san SYZYGIUM 'Straight and Narrow' 200mm 21
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and
import AS 4419 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with ameliorated site topsoil or approved by superintendent. Climbers / Vines
areas. Provide soil testing results for topsoil and AS 4419 topsoil. Refer to details.
certification to LA. CAN ros CANAVALIA rosea - Coastal Jack Bean 140mm 2
Podium Soil Podium Planters at Level 1 Podium Planter Profile, Water Proofing, Protection Board, Drainage Cell, Geotextile Fabric and Sand: By builder Earthborn (Chevallum) 5478 9488
IPO pes IPOMEA pes-caprae - Goat's Foot Morning Glory 140mm 2
Soil: Light weight, purpose suited to AS 3743 or
Centenary Landscapes 3373 4999
Groundcovers
Gravel Mulch Gravel mulch and minimum 300mm wide collars around Install Ø40-70mm decorative gravel mulch, 150mm deep presenting 100% cover over pinned geo-fabric. Mulch colour Nominated by contractor and CIS ant CISSUS antarctica - Kangaroo Vine 140mm 20
pits (adjust gravel sizing as required for pits only, so it to match secondary architectural colour and kept 50mm away from plant stems. Provide specified organic mulch around approved by superintendent
does not fall through pit grate) plant stems in gravel mulch areas; Groundcovers - 200mm radius, Shrubs - 300mm radius, Trees - 500mm radius. FIC nod FICINIA nodosa - Knobby Club Rush Tubes 5 500mm OC
Confirm width between grates to ensure gravel will not fit between, if so install gravel diameter greater than grate width.
GRE coo GREVILLEA 'Cooroora Cascade' 140mm 14
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent
LEP art LEPIRONIA articulata - Grey Sedge Tubes 18 400mm OC
Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and
approved by superintendent TURF ZOYSIA 'Empire' Rolls
'A' Grade, healthy, weed and pest free
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2543 Proposed Townhome Development Landscape Architecture Urban Design Land Planning
Bird Landscape Design is strictly prohibited. 4 Ventura Street, Sunrise Beach, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
13.6.25 C For Application BB BB Do not scale from PDF plans. M: +614 7705 5222
13.6.25 B For Application BB BB
LD2 Finishes and Planting Schedules E: [email protected]
11.6.25 A For Application BB BB
Sheet Title Sheet 2 of 5 Client: Alex Comino W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 3
Determining the Radius of the TPZ (Tree Protection Zone)
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required)
· TPZ = DBH X 12
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m
· Variations and encroachments to the TPZ in accordance with AS 4970
3x Tube Ø
Tubestock plant as specified
Fluorescent orange 5.5k.g
Form shallow saucer shaped depression
barrier fencing mesh secured
around plant base
/ tied 100mm below top of star Plant pit 2x width of respective pot.
Measurement 2x pot Ø Shrub / groundcover / tufty
pickets at 300mm centres Scarify all pit walls and bottom, typ.
taken for DBH grass plant species per plan
Yellow plastic capped Pot Ø
100mm deep organic mulch as specified,
Fencing
star pickets minimum 50mm clear of plant stem
painted yellow Backfill plant pit with specified 100mm deep and settled organic
Vegetation to 1200mm
1.4m
topsoil, avoid compaction, typ. mulch as specified, keep minimum
be protected Ameliorated site topsoil as specified, avoid
50mm from plant stem. Form shallow
Ground line compaction, typical
dish drain to base of plant, typ.
Crown DBH Garden topsoil as specified,
600mm
TPZ avoid compaction, typ.
150mm deep cultivated subgrade, typical
NOTES:
100mm, typ.
· Protective fencing to be installed around the TPZ to the commencement of any site works
Slow release fertiliser as specified. Slow release fertiliser as specified. Use
· Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with
Use phosphorus free tablets for phosphorus free tablets for Banksia,
AS 1319. 2x rootball depth, typ.
Banksia, Callistemon and Grevillea Callistemon and Grevillea species.
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project species.
Arborist in accordance with AS 4970 150mm, typ. 150mm deep cultivated Subgrade
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land subgrade, typ.
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by
appropriate use of herbicide Existing subgrade, typ.
· TPZs to be monitored, inspected and certified by the project Arborist
· Removal of tree protection measures at practical completion or as indicated by the project Arborist
1 Tree and Vegetation Protection Detail N.T.S. 3 Potted Shrub, Groundcover Planting 5 Tubestock Planting N.T.S.
LD3 Typical Detail LD3 Typical Section Detail N.T.S. LD3 Typical Section
Notes
· Refer to architect's plans for planter wall heights/widths/materials and podium planter bed widths.
· Refer to hydraulic engineer's plans for planter drainage and irrigation designs, and sealing.
Note:
· Refer to irrigation designer's plans for irrigation system design.
The top of the turf's thatch should be 10mm below any hard surface low point(s) to allow surface drainage.
· Water proofing and independent certification of water proof membrane by others.
· Refer to Finishes Schedule for product specifications and Planting Schedule for plant selections.
600mm
typical
Plant per plan and Plan Schedule
Drip irrigation emitter and tube
Slotted inspection grate, do not glue
Varies,
Mulch as specified, 100mm deep settled, 50mm from plant stem, typ. refer
Turf as specified 100mmØ uPVC slotted drainage / inspection pipe - 1m from tree rootball, typ. Plans
1) Planter wall, typ.
150mm Topsoil as specified
2) Waterproofing as specified to all interior planter wall surfaces, typ.
Steel Edging as specified 3) Protection board as specified
4) Geo-textile membrane as specified
Drainage cell as specified
100mm mulch as specified 50mmØ pvc drip irrigation conduit
Tapered Edging Stake as specified
300mm Topsoil as specified Proprietary podium drainage unit and carry-off pipe by builder
150mm cultivated subgrade, typ. Podium slab bottom to slope minimum 3% to low point, typ.
Existing subgrade Podium soil as specified Road Back of kerb or hardstand Turf Roll, typical
2 Steel Garden Edge N.T.S. 4 Podium Planter 1:30 6 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2543 Proposed Townhome Development Landscape Architecture Urban Design Land Planning
Bird Landscape Design is strictly prohibited. 4 Ventura Street, Sunrise Beach, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
13.6.25 C For Application BB BB Do not scale from PDF plans. M: +614 7705 5222
13.6.25 B For Application BB BB
LD3 Details E: [email protected]
11.6.25 A For Application BB BB
Sheet Title Sheet 3 of 5 Client: Alex Comino W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
Legend Detail
Overhead Electric Service
OE Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
cords
S
T
from re
Existing Vegetation to Remain 1
ction
84 Refer to Detail
LD3
35
dire
321 1 COR rub
R P1
Sewer
S
T
2 COR rub 2 CIS ant 12 LEP art 1
1
.8
Tree Protection Fencing
FT
31
PP LE Refer to Specifications, Detail LD3
44.158 TE
PIT
Garden Steppers
STE
.6
S
31
Overh Refer to Specifications and Finishes Schedule
WM ead P
ower
C onne
STE
ction
T
23
34.
eet
S
3.621
Gravel Mulch - for mulch use and around pits
.4
STE
.1 6
3344.2
31
Refer to Specifications, Finishes Schedule, Details
a Str
3 BAN rob
T
treet
STE
.2 2
S
10 GRE coo 31 E Steel Garden Edge
34.
12 ST
Ventur
Refer to Specifications, Detail LD3
r S
01 91 69
.0 4 344. 33. 33.
T
34
3
lippe
3-5
S
Shrub, Climber / Vine, / Pruned Shrub
Refer to Specifications, Plant Schedule and Detail LD3
3 ALO bri
.8
nnel
33
C
ction
& Cha
T
Conne
3, 5
S
Groundcovers
Kerb
.6
.6 LD3
33
4 CIS ant Refer to Specifications, Plant Schedule, Detail
ower
30
ead P
38°0'
23
.4
Fence 21.1
T
33
.4 6
Overh
Turf
S
30
ds
Refer to Specifications, Plant Schedule, Detail LD3
Recor
Note: All plants nominated on the plans
are horticulturally and climate suitable for
STE
from
1 COR rub .2
T
respective Private Open Space use within 30
Telstra
S
the site plan designed garden areas. 5 FIC nod
STE
6 LEP art
&
Water
30
STE
T
S
18 SYZ san
l
nne
Cha
s
ord
1 COR rub
b&
STE
Rec
rds
all
Block W
Ker
T
o
rec
from
S
1 COR rub
om
tra
n fr
Tels
Existing 8 CIS ant
ctio
gate
ire
6 CIS ant 7 SYZ hin 4 BAN rob
er d
Sew
Allow end Lillypillies to grow to 3m 4 GRE coo
minimum high and prune / maintain an
16.114 38.588 3 SYZ san arch starting 2m from finish surface to
Fence 295°31'50"
allow access to existing gate and
CP screening above
FH 376 CP
P 101 150
GT P100
GT
80
135
132
RP
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
Scale in metres See Sheet LD2 for Schedules
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2543 Proposed Townhome Development Landscape Architecture Urban Design Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 4 Ventura Street, Sunrise Beach, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
13.6.25 C For Application BB BB Do not scale from PDF plans.
during construction obtain the location of all services M: +614 7705 5222
13.6.25 B For Application BB BB All dimensions in millimetres unless noted otherwise
(underground and overhead) from the responsible authority LP1 Planting Plan - Ground E: [email protected]
11.6.25 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 4 of 5 Client: Alex Comino W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 5
Legend Detail
Overhead Electric Service
OE Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
Existing Vegetation to Remain 1
Refer to Detail
LD3
1 Tree Protection Fencing 1
FT Refer to Specifications, Detail LD3
Garden Steppers
2 IPO pes 2 CAN ros Refer to Specifications and Finishes Schedule
Gravel Mulch - for mulch use and around pits
Refer to Specifications, Finishes Schedule, Details
treet
Steel Garden Edge 2
E
ST Refer to Specifications, Detail LD3
er S
Shrub, Climber / Vine, / Pruned Shrub 3-5
Clipp
Refer to Specifications, Plant Schedule and Detail LD3
Groundcovers 3, 5
Refer to Specifications, Plant Schedule, Detail LD3
Turf 6
Refer to Specifications, Plant Schedule, Detail LD3
2 CIS ant
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
PLAN NOTES:
Scale in metres See Sheet LD2 for Schedules
0 1 2 5 10 NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:100 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
1:200 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Job No: 2543 Proposed Townhome Development Landscape Architecture Urban Design Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. 4 Ventura Street, Sunrise Beach, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
13.6.25 C For Application BB BB Do not scale from PDF plans.
during construction obtain the location of all services M: +614 7705 5222
13.6.25 B For Application BB BB All dimensions in millimetres unless noted otherwise
(underground and overhead) from the responsible authority LP2 Planting Plan - Level 1 E: [email protected]
11.6.25 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 5 of 5 Client: Alex Comino W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North