Attachment C - Biodiversity Code
retained and managed to avoid erosion
and landslide and to protect natural
resources and values.
Engineering and site works
O14 Development is sited and designed S14.1 Works, including roads, Proposed building are located in an
to— a) provide adequate separation driveways, fences, sewer lines and area that contains scattered vegetation.
distance between the vegetation to be other infrastructure—
protected and the development to avoid a) do not transect areas of vegetation;
disturbing, destabilising and or
deoxygenating any tree or altering the b) are co-located within a combined
drainage; utility corridor; and
b) avoid traversing or fragmenting c) provide for fauna underpasses,
vegetation or habitats for significant speed reduction devices and
flora or fauna species; and associated fencing, lighting and
c) avoid creating barriers to faunal warning signs, where appropriate; AND
movement S14.2 Development within or adjacent No fencing is proposed.
to areas of vegetation, incorporate
fauna friendly fences; AND
S14.3 Vegetation is protected from Proposal able to comply with
interference resulting from clearing or requirements.
construction activities by—
a) clearly marking vegetation to be
retained with flagging tape;
b) installing protective fencing around
the dripline of the vegetation and avoid
filling and excavation in these fenced
areas; and c) ensuring stock piling,
storage and vehicle parking occur
outside the identified vegetation areas;
AND
S14.4 Low impact construction Proposal able to comply with
techniques are used around vegetation requirements
to minimise interference with the
vegetation.
Filling and excavation
O15 Vegetation is not adversely No solution provided Detached dwelling to be located above
impacted upon by earthworks and ground level by means of an elevated
changes to the hydrological regime, platform.
including changes to ground water
levels, flooding levels, run-off and tidal Minor filling has been undertaken to
hydraulics. create a small pad for the proposed
garage.
Replanting and rehabilitation
O16 Development provides for S16.1 Landscaping and rehabilitation The applicant has indicated that they
ecologically important areas to be complements and supports ecologically have carried out replanting across the
restored and enhanced through the important habitats by— site.
following measures— a) siting a) utilising native plants of local origin;
landscaped areas to complement and b) utilising suitable plant species
enhance existing vegetation; b) removal identified in PSP3 – Landscaping Plants
of all species likely to displace native and Guidelines;
flora species or degrade fauna habitat; c) replicating adjacent remnant
c) replanting and rehabilitating16 habitats, including understorey
degraded habitat; and d) replacing any vegetation;
vegetation removed with suitable d) creating or enhancing linkages
replacement vegetation of local origin. between existing habitats;
e) avoiding the use of undesirable plant
species listed in Table 9.1 of PSP3
Landscaping Plants and Guidelines;
and
f) planting riparian zones to filter
stormwater run-off and provide for
wildlife habitat; AND
S16.2 Vegetation removed is replaced
with—
a) plantings of equivalent area that
replicate the floristic structure of the
vegetation removed; or
b) where this is not possible due to the
characteristics of the site and the
development, plantings twice the
number of the removed trees and plants
of local origin.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.