Effluent Disposal Report
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
JOB NUMBER 21-1559 EFFLUENT DISPOSAL REPORT
CLIENT SONJA GLINSTER
SITE LOCATION PROPOSED RESIDENCE
36 RIVER PARK DRIVE, RINGTAIL CREEK.
REPORT DATE 21/03/2022
1. INTRODUCTION
The purpose of this report is to evaluate and define a suitable on-site sewerage treatment and disposal
system for household effluents in accordance with Australian Standard 1547 - 2012 “On-site domestic-
wastewater management”. The Qld Plumbing & Wastewater Code-2019 has been used for reference
purposes during the compiling of this report.
This report relates exclusively to the proposed residence at 36 River Park Drive, Ringtail Creek. This
document has been prepared for the express purpose stated above. This document does not cover any
other elements related to construction on the site.
2. SITE DESCRIPTION AND WEATHER CONDITIONS
The site is an acreage allotment, which fronts a sealed road.
The slope configuration in relation to surface drainage is linear planar.
The soil surface condition was moist at the time of testing. There was no evidence of cracking of the
surface during the investigation.
The site has no visible rock outcrops on the surface of the allotment.
The proposed effluent disposal area is exposed to sun and wind.
The proposed effluent disposal area is grassed, scattered undergrowth and treed. The proposed effluent
disposal area falls at a slope of approximately 5% slope to the north-west. Surface water drainage from
adjoining allotments traverse this site. Surface water from the tested area will drain towards the south-
east.
At the time, and immediately prior, to testing, the prevailing weather conditions comprised of cloudy
conditions.
The site has a River approximately 150 m downhill from the proposed effluent disposal area.
3. SOIL PROFILE
The borelogs carried out at the site, refer attached Site Plan for localities, indicate that the soil profile
typically consists of a moist, grey, medium plasticity SANDY CLAY. Underlying the above, the soil
profile consists of a moist, pale grey/ pale brown, high plasticity SANDY CLAY
Groundwater was not encountered during the field investigation.
Rock was not encountered during the field investigation.
Whilst every effort has been made to ensure that the borelogs carried out at the subject allotment are
indicative of the soil profile over the site any discrepancy between the profile detailed in the borelogs
and that observed during construction shall be referred to Global Testing for immediate attention.
4. RESERVE AREA
Page | 1 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 9 pages
Page 2
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
A 100% reserve effluent disposal area can be obtained on this allotment.
5. INVESTIGATION DETAILS
The investigation carried out at the site included mechanical augered boreholes up to 2000 mm depth
and a series of three permeability test pits located as shown on the attached site report. All testing
carried out was in accordance with Australian Standard 1547 - 2012 “On-site domestic-wastewater
management”.
6. TEST RESULTS AND CONCLUSIONS
Test No. Soil Slope Setback Recommended Beavers
Permeability (m/m) Distance Design Irrigation Gardner
(based on test (m) Rate (mm/day) Setback
results)Ksat Distance
As per AS/NZS 1547-
2012
PT 1 0.11
PT 2 0.10
PT 3 0.10
Average 0.10 0.05 10* 3 1m
*Minimum setback distance from a watercourse (when an Advanced Secondary ASTP is
recommended) required by Noosa Council Policy.
Determination of Soil Category (Table 5.2 of AS/NZS 1547:2012)
Soil Category Soil Texture Structure Indicative Indicative
Permeability Drainage class
BH5
(ksat)(m/day) (Table 5.2)
Cat 5 Light clay Moderately 0.06-0.12 Poorly Drained
(00-2000 mm) structured
The Design Irrigation Rate of 3 mm/day was adopted from the above results in Table A1. Noosa
Council`s policy suggests that the use of a primary treated effluent disposal system will be satisfactory
provided:
Sufficient permeable surface soil overlying rock is present over the disposal area, not less than
1.2metres depth
A suitable soil category material (as per AS1547-2012) is encountered.
A Minimum set-back distance of 50m is obtained.
Permeability rates are within the required parameters.
The site is located outside a catchment area.
Not all the above requirements have been met, therefore it is concluded that the use of a primary treated
effluent disposal system is not acceptable.
Page | 2 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 3
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
7. RECOMMENDATIONS
The Design Irrigation Rate of 3 mm/day be adopted.
The site be provided with an “Aerated wastewater-treatment system” capable of
producing Advanced secondary effluent, or an equivalent system, to council’s approval
in lieu of a septic tank.
The disposal system be by, # A Fixed Surface Spray Irrigation System, as per AS/NZS
1547:2012. Purple line is to be used from the ASTP to the irrigation area.
An in-line Filter is to be installed between the Treatment Plant and the Irrigation System.
Regular maintenance of the Filter shall be undertaken, according to the manufacturer’s
requirements.
The area shall be surrounded by a 150 mm high earth mound or similar.
The spray irrigation system shall distribute the effluent evenly (Via a K-Rain Valve)
within the designated area through coarse spray heads suitable for use with effluent and
shall not produce aerosols. All ‘plumes’ shall be evenly distributed and fixed in place
with a height of approx. 0.3 m and have a throw of no greater than 2.0 m. It is estimated
that approximately 35 plumes would be required.
Non-return valves and flush-out valves should be installed on irrigation lines.
Evergreen plants shall be planted (minimum of 35 plants) to maximize evapo-
transpiration. The area is to be mulched.
The disposal area required is 360m2.
A daily flow rate of 1080 litres/day (9 people @120 L per person/ per day) has been
adopted with a Design Irrigation Rate of 3 mm/day. This flow rate will accommodate the
proposed 6-bedroom residence only. A 100% reserve area (as per site plan) is to be kept
free of buildings and traffic.
The disposal area should be located in the vicinity of PT 1, PT 2, and PT 3 as per attached
site plan.
All set-back distances as required by the local authority shall be met.
At least two signs stating “Recycled water- Do not drink” are to be erected on boundaries.
Stormwater run-off including roof water from buildings shall be diverted around and
away from the disposal area. Imported fill may be required should there be insufficient
soil available for the design of the disposal system.
Please note: Personal Hygiene Products, Bleaches and detergents high in phosphorous will damage the capabilities of the
Treatment System’s performance. Information should be sought by the Treatment System’s manufacturer for a guide of
suitable products acceptable for the system.
8. CERTIFICATION
The local authority may request that an inspection and certification is undertaken on the installation
of the system when nearing completion. The installer must contact Noosa Council prior to ‘burying’
the system, if certification is required.
Yours Sincerely,
Michael S. Pinkney (Office Manager)
Page | 3 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 4
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
LIMITATIONS
Recommendations given in this report are based on the information supplied by the client regarding the
proposed building construction in conjunction with the findings of the investigation. Any change in
construction type, building location or omission in the client supplied information, may require
additional testing and/or make the recommendations invalid.
The recommendations herein identify a target soil stratum into which the footings are to be founded.
The target stratum has been located by the depth in mm of the target stratum's upper horizon boundary
below the existing ground surface level at the time of the site investigation. Any cutting or filling works
and any surface erosion or deposits subsequent to the site investigation, will alter the measured location
of the stratum relative to the surface. Where required, the author should be notified in such cases to
confirm the location of the target stratum.
The description of the soil given in the Soil Profile section of this report is intended as a brief overview
of the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the
Soil Profile Reports and/or Borehole Reports attached to this report.
Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made aware
however, that exploration is limited by time available and economic restraints. In some cases, soil
conditions can change dramatically over short distances, therefore, even careful exploration programs
may not locate all the variations.
If soil conditions different from those shown in this report are encountered or are inferred from other
sources, then the author must be notified immediately.
This report may not be reproduced except in full. The information and drawings provided with this
report shall only be used and will only be applicable for the development shown on the client supplied
information provided for this site.
Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not
be used for any building construction or costing calculations. The purpose of the plan is to show
approximate location of field tests only.
Any changes made to these recommendations by persons unauthorised by the author will legally be
interpreted as that person assuming the responsibility for the long-term performance of the footing
system.
The recommendations contained in this report have not taken into consideration the long-term effects
of any previous, current or potential subsurface work by mining companies or potential slope instability
problems. At the time of writing this report neither our client (nor his agent) nor the local authority had
made the author aware that these problems may be affecting this allotment. If a mining subsidence or
slope stability assessment is required for this allotment, the recommendations of a suitably qualified
geotechnical engineer should be sought.
Page | 4 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 5
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
ADDITIONAL NOTES FOR EFFLUENT REPORTS
1. A Site Classification Report may be requested by Certifiers or Local Council to aid in approval of this
report regarding articulation, if the site is suspected of being classified as H, E or P in accordance
with AS2870. Global Testing should be contacted to undertake this testing (additional charge
applies), if not previously requested. This Effluent Disposal Report does not address articulation or
flexible joints (an RPEQ should be sought if design of either of these is required- additional charges
apply).
2. If any future amendments are required due to the movement of the building footprint, amount of
bedrooms, on-site earthworks, or requests for an alternative area or alternative system, an
additional charge of $330 will apply to complete an updated Effluent Disposal Report.
3. Global Testing has completed this report based on plans and information as supplied by the client.
4. Any levels or slope measurements within this report are approximate only, and should not be used
for construction purposes.
5. DO NOT allow newspapers, disposable or sanitary napkins, rubber products, nappy liners ,cotton
buds etc. to enter the system.
6. DO NOT use an in-sink garbage grinder. These are not recommended by most councils as they can
add extra loading equivalent to about two persons.
7. DO NOT use strong caustics, acids, alkalis or chemical detergents. These can damage the system
and cause bad odours.
8. DO NOT use disinfectants or other bactericides.
9. DO NOT put grease/fats or food scraps down the kitchen sink (ie. plates should be scraped
reasonably clean prior to washing up).
10.NEVER dispose of used cooking oil or similar material down the sink.
Page | 5 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 6
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
SOIL PROFILE REPORT
CLIENT: Sonja Glinster. AUTHORISED Sonja Glinster.
BY:
PROJECT: 36 RIVER PARK DRIVE, DATE TESTED: 28/02/2022
RINGTAIL CREEK. JOB NO: 21-1559
Drilling Method: Jacro 105 100mm. Borehole
No.5
Depth Description PENET. Est. Bearing
(blows per 100mm)
(mm) Capacity
1 2 3 4 (kPa)
0 SANDY CLAY (CI)-Medium plasticity,
grey, fine to coarse sand, moist, stiff.
100
200
300
400
500
600 SANDY CLAY (CH)-High plasticity, pale
grey, fine to coarse sand, moist, stiff.
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000 Hole Terminated.
2100
2200
2300
2400
2500
Page | 6 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 7
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
SOIL PROFILE REPORT
CLIENT: Sonja Glinster. AUTHORISED Sonja Glinster.
BY:
PROJECT: 36 RIVER PARK DRIVE, DATE TESTED: 28/02/2022
RINGTAIL CREEK. JOB NO: 21-1559
Drilling Method: Jacro 105 100mm. Borehole
No.6
Depth Description PENET. Est. Bearing
(blows per 100mm)
(mm) Capacity
1 2 3 4 (kPa)
0 SANDY CLAY (CI)-Medium plasticity,
grey, fine to coarse sand, moist, stiff.
100
200
300
400
500
600 SANDY CLAY (CH)-High plasticity, pale
grey, fine to coarse sand, moist, stiff.
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000 Hole Terminated.
2100
2200
2300
2400
2500
Page | 7 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 8
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
SOIL PROFILE REPORT
CLIENT: Sonja Glinster. AUTHORISED Sonja Glinster.
BY:
PROJECT: 36 RIVER PARK DRIVE, DATE TESTED: 28/02/2022
RINGTAIL CREEK. JOB NO: 21-1559
Drilling Method: Jacro 105 100mm. Borehole
No.7
Depth Description PENET. Est. Bearing
(blows per 100mm)
(mm) Capacity
1 2 3 4 (kPa)
0 SANDY CLAY (CI)-Medium plasticity,
grey, fine to coarse sand, moist, stiff.
100
200
300
400
500
600 SANDY CLAY (CH)-High plasticity, pale
grey, fine to coarse sand, moist, stiff.
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000 Hole Terminated.
2100
2200
2300
2400
2500
Page | 8 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
Page 9
LEGEND
BHx = BOREHOLE LOCATION
TH
R
O PNx = DYNAMIC CONE
N PENETROMETER LOCATION
PTx = PERCOLATION TEST
=TREES
ADVANCED SECONDARY ASTP
TO BE INSTALLED IN A SUITABLE LOCATION
BY THE INSTALLING PLUMBER NOT ADJACENT
TO LIVING ROOMS OR BEDROOMS
6.0 LEVEL
5.0 7.0 RESERVE AREA
4.0 8.0
3.0 30% SLOPE 8.0
30% SLOPE
PN 3
BH 3
PN 1 K-RAIN VALVE (TO BE INSTALLED)
BH7
BH 1
9.0 40000 PT3
3.0
4.0 PN 4 PROPOSED RESIDENCE
BH 4
BH6
5.0 PT2 PROPOSED FIXED SURFACE SPRINKLER IRRIGATION
AREA = 360M2
PN 2 35 PLUMES REQUIRED
BH 2 TO BE PLANTED OUT WITH A MINIMUM OF 35 PLANTS,
MULCHED, BORDER AND INSTALL
24000
9.0
5% SLOPE
6.0
1800 3400
LEVEL BH5
PT1 FLUSH OUT VALVES
(TO BE INSTALLED)
1500 3000
15000
7.0
5% SLOPE
8.0
PPROX. EXTENT OF
IVEWAY
PREDOMINANT TREE
NG DR
9.0 LINE SHOWN SHADED
EXISTI
FIRE SOURCE
PPROX. EXTENT OF
PREDOMINANT TREE
LINE SHOWN SHADED
FIRE SOURCE
HEAVY DROPLET (PLUMES E.G 10MM FEEDER LINES)
TYP 150 HIGH MOUND SURROUND
PLUMES
1500 3000
300
SITE PLAN
SCALE: 1 : 350
25-32MM DIAMETER POLY LINES LAID BENEATH SURFACE. ULTILIZE EXISTING VEGETATION
TYP FIXED SPRAY SURFACE IRRIGATION SYSTEM
SITE CLASSIFICATION | EFFLUENT DESIGN CLIENT DETAILS PROJECT DETAILS SITE INFORMATION DRAWING TITLE JOB No. DRG No. REVISION
SUNSHINE COAST | BRISBANE | GOLD COAST
RPD: -
[email protected]
SONJA GLINSTER EFFLUENT DISPOSAL
SITE PLAN
21/1559 152 1
POSTCODE: 4565
COPYRIGHT © All rights reserved, this work is
copyright and cannot be reproduced or copied
LOT 2, 36 RIVER PARK DR, SUBURB: RINGTAIL CREEK
22/03/2022 FOR CONSTRUCTION AA 1
DATE DESCRIPTION BY REV
in any form without prior consent
RINGTAIL CREEK, QLD AUTHORITY: NOOSA SHIRE COUNCIL DRAWN: AA DESIGN: MP CHECK: GB DATE: 22/03/2022 SCALE: As indicated@A1
Page 10
¿ play your part - print on recycled paper
Details
LOT: 2
Plan : SP 265110
Parish : -
County : -
LGA : Noosa Shire Council
Locality : Ringtail Creek
Zone : Rural
Housing Overlays :
10
Site Area : 562685.04m2
6 51
SITE NOTES
P2
These schedules are to be read in conjunction with
architectural drawings, structural engineer and
hydraulic engineer drawings and any other external
consultants. Any discrepancy with these schedules or
2S
other documentation is to be referred to the designer
for written direction prior to the commencement of
works. All works to be carried out in accordance with
the engineers design and documentation.
All works to be in accordance with the Building Act
1975, Standard Building Regulation, Building Code of
Australia, Queensland Development Code, Local
government regulations and relevant Australian
Standards. The Builder is to clarify all dimensions on
site prior to the commencement of any works. The
author of the drawings takes no responsibility for
details as shown if changes are made during or prior to
construction without written notice or approval. Do not
scale off plans use figure dimensions only. The
maximum height of construction is to comply with the
local authority planning scheme (excluding relaxations
as per town planning approval). The author takes no
responsibility for cut/fill levels resulting from the
documented levels and contours.
The Builder is to clarify all dimensions on site prior to 00 6.00
5. 7.00
the commencement of any works. The author of the
drawings takes no responsibility for details as shown if 0 top of bank 8.00
changes are made during or prior to construction 4.0
8.00
without written notice or approval. Do not scale off 8.00
0
3.0
plans use figure dimensions only. 9.00
The Builder is to comply with statutory and contractual
environmental protection requirements, including the
provision of sediment control barriers and controlled 10.0
N
0
PI
gravel access to the site during construction, with best top of bank
B/
M
practice methods used.
8
137°17'59"
TB
Proposed Residence
Builder to locate all services before commencement of 58.441
3.00
9.00
construction.
00
IN
4.
/P
House to be setout by a registered surveyor. Surveyor
C
0
M
to provide certificate at frame and completion stage for
5.0
9
TB
230°09'23"
39°55'30"
confirmation of building setout and heights. 29 15
23.678
19.623
4
Floor Area
0
9.0
Area m2
0
6 .0
GFA Craft 62.70
GFA Gym 62.70
GFA Main building 534.05
659.45 m²
ay
w
ve
d ri
ng
51
isti
03
0
ex
9.0
5
Noosa River
7.00
8
10
62
00
10.
8.00
N
PI
A/
M
7
TB
Existing
Dam
APPROX. EXTENT OF
PREDOMINANT TREE
9.00
LINE SHOWN SHADED :
y
existing drivewa
FIRE SOURCE
Proposed
residence
APPROX. EXTENT OF
PREDOMINANT TREE
LINE SHOWN SHADED :
FIRE SOURCE
APPROX. EXTENT OF
PREDOMINANT TREE LINE
SHOWN SHADED :
FIRE SOURCE
264 948.13 m2
APPROX. EXTENT OF
PREDOMINANT TREE LINE
SHOWN SHADED :
FIRE SOURCE
35
000 Proposed shed
(inside existing
clearing)
ox
pr
ap
0
00
25
5
00
14
0
Location plan Site plan
1:5000 1:500
/Users/benthornton/Documents/Cadfiles/2203 - Hill & Heron/Archicad/
03052022/2203.pln
sbt designs pty ltd t/a
project Residence lot no. 2 DA01 Development application issue 3/5/2022
project number
RY
Skale Building Design
plan no. SP 265110
M I NA
Mobile: 0412 025 657
2203
I
David Hill & Sonja Heron
PREL
for
skale
building design
skale.com.au
[email protected]
A.C.N. 123 976 296 QBCC: 1143 609 at
36 Riverpark Drive
Ringtail Creek Qld
drawn
scale (A1) 1:100, 1:500, 1:5000, 1:1
BT
Rev Details Date
drawing number
01 DA01 © Skale Building Design