Effluent Disposal Report
PH: 07 54 740 900
3/53 Gateway Drive, Noosaville 4566
[email protected]
LIMITATIONS
Recommendations given in this report are based on the information supplied by the client regarding the
proposed building construction in conjunction with the findings of the investigation. Any change in
construction type, building location or omission in the client supplied information, may require
additional testing and/or make the recommendations invalid.
The recommendations herein identify a target soil stratum into which the footings are to be founded.
The target stratum has been located by the depth in mm of the target stratum's upper horizon boundary
below the existing ground surface level at the time of the site investigation. Any cutting or filling works
and any surface erosion or deposits subsequent to the site investigation, will alter the measured location
of the stratum relative to the surface. Where required, the author should be notified in such cases to
confirm the location of the target stratum.
The description of the soil given in the Soil Profile section of this report is intended as a brief overview
of the soil's primary constituents. For a detailed classification of the soil, the reader should refer to the
Soil Profile Reports and/or Borehole Reports attached to this report.
Every reasonable effort has been made to locate the test sites so that the borehole profiles are
representative of the soil conditions within the area investigated. The client should be made aware
however, that exploration is limited by time available and economic restraints. In some cases, soil
conditions can change dramatically over short distances, therefore, even careful exploration programs
may not locate all the variations.
If soil conditions different from those shown in this report are encountered or are inferred from other
sources, then the author must be notified immediately.
This report may not be reproduced except in full. The information and drawings provided with this
report shall only be used and will only be applicable for the development shown on the client supplied
information provided for this site.
Any dimensions, contours, slope directions and magnitudes shown on the Test Locality Plan shall not
be used for any building construction or costing calculations. The purpose of the plan is to show
approximate location of field tests only.
Any changes made to these recommendations by persons unauthorised by the author will legally be
interpreted as that person assuming the responsibility for the long-term performance of the footing
system.
The recommendations contained in this report have not taken into consideration the long-term effects
of any previous, current or potential subsurface work by mining companies or potential slope instability
problems. At the time of writing this report neither our client (nor his agent) nor the local authority had
made the author aware that these problems may be affecting this allotment. If a mining subsidence or
slope stability assessment is required for this allotment, the recommendations of a suitably qualified
geotechnical engineer should be sought.
Page | 4 Borelogging in accordance with AS1726-2017 Geotechnical Site Investigations Code
21-1559
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.