Original source · versioned page text
2014-01-13 Item 6.3 Appendices 1-5
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
2.1.2 Waste Landfill SCRC utilises the available capacity of the Eumundi Road Landfill (located in the Proponent Council’s area) for the region. This landfill has capacity for approximately 20 years and enough land for future expansion. SCRC has consciously delayed opening further landfill capacity in the region, instead directing resources to exploring alternative waste treatment technologies. Collection SCRC has 3 contracts (Caloundra - Thiess, Maroochy - JJ Richards and Noosa - TPC) expiring July 2014. Existing Council will be calling for tenders for regional waste collection in November 2012, awarding in May 2013, with commencement in July 2014 for a period of seven years with the focus of achieving regional contracting efficiencies. Materials recycling SCRC has one regional recycling facility within the Maroochy and Noosa areas, which caters for two-thirds of the region’s recycling volume. The Caloundra area transports materials for recycling out of the region to Petrie. A call for tender is underway based on a single regional re-cycling facility for all recyclables from the region. The contract allows for transport out of the region via a new bulk haul recycling transfer facility. 2.1.3 Airport The Sunshine Coast Airport, located in Marcoola, is presently owned and operated by SCRC. With a modest operating surplus of $1.1 million in FY2012, SCRC is covering the costs associated with the airport but making only marginal returns on equity. The airport is reaching capacity constraints, particularly with respect to the runway’s ability to handle larger aircraft. QTC understands the Civil Aviation Safety Authority (CASA) has provided dispensation until 2021 to land Boeing 737s on the current runway. From 2022 CASA requires the runway to be widened. This upgrade is expected to cost approximately $250 million dollars and is unlikely to proceed without significant assistance from either the State or Federal Governments. SCRC has not included this capital expenditure in the forecasts reviewed by QTC. 2.1.4 Maroochydore Principal Activity Centre SCRC has committed $42.0 million to acquire 53 hectares of land in Maroochydore with a plan to develop a principal activity centre (PAC) for the region. A further $150 million is required to complete the required PAC infrastructure. SCRC has not included this capital expenditure in the forecasts reviewed by QTC. 2.1.5 Caloundra South Urban Development Area In December 2011, an application by Stockland Development Pty Ltd (Stockland) for the development of land at Caloundra South was approved by the Urban Land Development De-amalgamation Analysis of Sunshine Coast Regional Council Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.